Claims Analysis
Total Claims: 42
Claim 1
Independent Claim
326 words
A method of injection of fluid within a subterranean well (W) for removal of lost circulation material (LCM) which has been deposited within perforations (P) through a first perforated well conduit section (C) traversing a production zone (PZ), by first initiating removal of said material (LCM) upwardly from a lowermost portion (LP) of said section and by subsequent continuation of removal of said material (LCM) downwardly from an uppermost portion (UP) of said section, comprising the steps of: (1) assembling a second conduit (10) which carries a zone isolator (11) and fluid communicating means (12) comprising first and second communicating members (12a, 12b); (2) running the second conduit (10) into the well until the isolator (11) is positioned above the production zone (PZ) with the first communicating member (12a) being in proximity to the uppermost end of the perforations (P) and the second communicating member (12b) being in proximity to the lowermost end of the perforations (P); (3) sealingly securing the isolator (11) within and against the first well conduit (C) above said zone (PZ); (4) forming a first injection path for said fluid which extends from the top of the well (W), through the interior of said communicating means (12) and out only the exterior of the second communicating member (12b) and into the lowermost of said perforations (P) for contact with and removal of said lost circulation material (LCM) therefrom until a loss of circulation of said fluid is established; and (5) forming a second injection path for said fluid which extends from the top of the well (W) through the first communicating member (12a) of said communicating means (12) while preventing said fluid from passing from the interior to the exterior of said second communicating member (12b), said second injection path for said fluid continuing out of said first communicating member (12a) and into the other of said perforations for contact with and removal of the remainder of said lost circulation material (LCM).
Claim 2
Independent Claim
326 words
A method of injection of fluid within a subterranean well (W) for removal of lost circulation material (LCM) which has been deposited within perforations (P) through a first perforated well conduit section (C) traversing a production zone (PZ), by first initiating removal of said material (LCM) upwardly from a lowermost portion (LP) of said section and by subsequent continuation of removal of said material (LCM) downwardly from an uppermost portion (UP) of said section, comprising the steps of: (1) assembling a second conduit (10) which carries a zone isolator (11) and fluid communicating means (12) comprising first and second communicating members (12a, 12b); (2) running the second conduit (10) into the well until the isolator (11) is positioned above the production zone (PZ) with the first communicating member (12a) being in proximity to the uppermost end of the perforations (P) and the second communicating member (12b) being in proximity to the lowermost end of the perforations (P); (3) sealingly securing the isolator (11) within and against the first well conduit (C) above said zone (PZ); (4) forming a first injection path for said fluid which extends from the top of the well (W), through the interior of said communicating means (12) and out only the exterior of the second communicating member (12b) and into the lowermost of said perforations (P) for contact with and removal of said lost circulation material (LCM) therefrom until a loss of circulation of said fluid is established; and (5) forming a second injection path for said fluid which extends from the top of the well (W) through the first communicating member (12a) of said communicating means (12) while preventing said fluid from passing from the interior to the exterior of said second communicating member (12b), said second injection path for said fluid continuing out of said first communicating member (12a) and into the other of said perforations for contact with and removal of the remainder of said lost circulation material (LCM).
Claim 3
Dependent Claim
44 words
A method according to Claim 1 wherein the fluid communicating members comprise slotted screens circumferentially extending around said second conduit, and said second conduit having a portion interior of said screens ported to permit fluid flow between said screen and said second tubular conduit.
Claim 4
Dependent Claim
44 words
A method according to Claim 1 wherein the fluid communicating members comprise wire wrapped screens circumferentially extending around said second conduit, and said second conduit having a portion interior of said screens ported to permit fluid flow between said screen and said tubular conduit.
Claim 5
Dependent Claim
17 words
A method according to Claim 1, 2 or 3 wherein said second conduit is a tubular conduit.
Claim 6
Independent Claim
20 words
A method according to any preceding claim, wherein said first and second injection paths comprise sectional lengths of said conduit.
Claim 7
Independent Claim
90 words
A method according to any preceding claim, further comprising the following steps: with the isolator (11) continuing to be sealingly secured within and against the first well conduit (C) above said zone (PZ), forming a gravel pack fluid flow path which extends from the surface downhole through the interior of the isolator (11), around the exterior of said communicating means (12), and a return fluid flow path for said gravel pack fluid through the interior of said communicating means (12) and back up hole to the top of the well.
Claim 8
Dependent Claim
83 words
A method according to Claim 6, further comprising the step of mixing gravel with a gravel pack fluid and flowing said gravel in said gravel pack fluid in said gravel pack fluid flow path until the gravel is deposited in said well (W) below said isolator (11) and exterior of said communicating means (12), and returning the gravel pack fluid through the interior of the communicating means (12) and within said return fluid flow path up hole to the top of the well.
Claim 9
Dependent Claim
52 words
A method according to Claim 7, further comprising the step: with the isolator (11) still in sealingly engaged position, of forming a production flow path from the production zone (PZ), through the perforations (P), through the deposited gravel, through the communicating means (12) and uphole to the top of the well (W).
Claim 10
Independent Claim
362 words
A method of injection of fluid within a subterranean well (W) for removal of lost circulation material (LCM) which has been deposited within perforations (P) through a first perforated well conduit section (C) traversing a production zone (PZ), by first initiating removal of said material (LCM) upwardly from a lowermost portion (LP) of said section and by subsequent continuation of removal of said material downwardly from an uppermost portion (UP) of said section, comprising the steps of: (1) assembling a second conduit (10) which carries a fluid flow cross-over means (T-1, T-2), a zone isolator (11) and fluid communicating means (12) comprising first and second communicating members (12a, 12b); (2) running the second conduit (10) into the well (W) until the isolator (11) is positioned above the production zone (PZ) with the first communicating member (12a) being in proximity to the uppermost end of the perforations (P) and the second communicating member (12b) being in proximity to the lowermost end of the perforations (P); (3) hydraulically activating the isolator (11) to sealingly secure said isolator (11). within and against the first well conduit (C) above said zone (PZ); (4) manipulating said cross-over tool (T-1, T-2) to one position and forming a first injection path for said fluid which extends from the top of the well (W), through said cross-over tool (T-1, T-2), through the interior of said communicating means (12) and out only the exterior of the second communicating member (12b) and into the lowermost (LP) of said perforations (P) for contact with and removal of said lost circulation material (LCM) therefrom; and (5) manipulating said cross-over tool (T-1, T-2) to another position and forming a second injection path for said fluid which extends from the top of the well (W) through said cross-over tool (T-1, T-2) through the first communicating member (12a) of said communicating means (12) for preventing said fluid from passing from the interior to the exterior of said communicating member (12b), said second injection path for said fluid continuing out of said first communicating member (12a) and into the other of said perforations (P) for contact with and removal of the remainder of said lost circulation material (LCM).
Claim 11
Independent Claim
362 words
A method of injection of fluid within a subterranean well (W) for removal of lost circulation material (LCM) which has been deposited within perforations (P) through a first perforated well conduit section (C) traversing a production zone (PZ), by first initiating removal of said material (LCM) upwardly from a lowermost portion (LP) of said section and by subsequent continuation of removal of said material downwardly from an uppermost portion (UP) of said section, comprising the steps of: (1) assembling a second conduit (10) which carries a fluid flow cross-over means (T-1, T-2), a zone isolator (11) and fluid communicating means (12) comprising first and second communicating members (12a, 12b); (2) running the second conduit (10) into the well (W) until the isolator (11) is positioned above the production zone (PZ) with the first communicating member (12a) being in proximity to the uppermost end of the perforations (P) and the second communicating member (12b) being in proximity to the lowermost end of the perforations (P); (3) hydraulically activating the isolator (11) to sealingly secure said isolator (11). within and against the first well conduit (C) above said zone (PZ); (4) manipulating said cross-over tool (T-1, T-2) to one position and forming a first injection path for said fluid which extends from the top of the well (W), through said cross-over tool (T-1, T-2), through the interior of said communicating means (12) and out only the exterior of the second communicating member (12b) and into the lowermost (LP) of said perforations (P) for contact with and removal of said lost circulation material (LCM) therefrom; and (5) manipulating said cross-over tool (T-1, T-2) to another position and forming a second injection path for said fluid which extends from the top of the well (W) through said cross-over tool (T-1, T-2) through the first communicating member (12a) of said communicating means (12) for preventing said fluid from passing from the interior to the exterior of said communicating member (12b), said second injection path for said fluid continuing out of said first communicating member (12a) and into the other of said perforations (P) for contact with and removal of the remainder of said lost circulation material (LCM).
Claim 12
Independent Claim
660 words
A method of injection of fluid within a subterranean well for removal of lost circulation material (LCM) which has been deposited within perforations (P) through a first perforated well conduit section (C) traversing a production zone (PZ), by first initiating removal of said material (LCM) upwardly from a lowermost portion (LP) of said section (C) and by subsequent continuation of removal of said material (LCM) downwardly from an uppermost portion (UP) of said section (C), comprising the steps of: (1) assembling a second conduit (10) which carries a zone isolator (11), a fluid flow cross-over tool (T-1, T-2), and fluid communicating means (12) comprising first and second communicating members (12a, 12b); (2) running the second conduit (10) into the well (W) until the isolator (11) is positioned above the production zone (PZ) with the first communicating members (12a) being in proximity to the uppermost end of the perforations (P) and the second communicating member (12b) being in proximity to the lowermost end of the perforations (P); (3) sealingly securing the isolator (11) within and against the first well conduit (C) above said zone (PZ); (4) manipulating the fluid cross-over tool (T-1, T-2) to a first position to permit downward fluid flow therethrough to pass exteriorly out of said communicating means (12) through only the second communicating member (12b) and upwardly to the top of the well (W) above said isolator (11) through an annulus defined between said first well conduit (C) and another conduit (10) concentrically disposed therein; (5) moving said fluid cross-over tool (T-1, T-2) to a second position whereby fluid is permitted to pass through said fluid cross-over tool (T-1, T-2) downwardly therethrough and exteriorly through only said second communicating member (12b) and is prevented from flowing to the annular area (34) above said isolator (11) between said first well conduit (C) and said concentrically disposed conduit (10) therethrough, whereby fluid for removal of said lost circulation material (LCM) may be squeezed into the lowermost of said perforations (P) for removal of said lost circulation material (LCM) therefrom; (6) manipulating said fluid cross-over tool (T-1, T-2) to a third position whereby fluid for removal of said lost circulation material (LCM) passes through said fluid cross-over tool (T-1, T-2), thence exteriorly below said isolator (11) in an annular area between said first perforated well conduit (C) and the fluid communicating means (12), into contact with the other of said perforations (P) through said perforated well conduit section (C), thence through only the second (12b) of said first and second fluid communicating members (12a, 12b), thence through the interior of said cross-over tool (T-1, T-2) and into the annular area (34) above said isolator (11) between said first well conduit (C) and the concentrically disposed conduit (10) therethrough; (7) manipulating said cross-over tool (T-1, T-2) to another position whereby said fluid for removal of said lost circulation material (LCM) passes downwardly through said cross-over tool (T-1, T-2), thence within the annular areas below said isolator (11) between said first perforated well conduit section (C) and said communicating means (12), then into contact with the perforation (P) of the first perforated well conduit section (C) and into at least one of the first and second communicating members (12a, 12b), through the interior of the cross-over tool (T-1, T-2), thence outwardly above said isolator (11) through the annular area (34) between said first well conduit member (C) and the concentric conduit (10) positioned therethrough to the top of the well; and (8) preventing continued flow above said isolator (11) within said annular area between said first well conduit member (C) and the concentric conduit (10) disposed therethrough by manipulating valve means in communication with said annular area (34) above said isolator (11) between said first well conduit (C) and the concentric conduit (10) positioned therethrough to closed position whereby said fluid for removal of lost circulation material (LCM) may be squeezed into said perforations (P) through said first perforated well conduit section.
Claim 13
Independent Claim
660 words
A method of injection of fluid within a subterranean well for removal of lost circulation material (LCM) which has been deposited within perforations (P) through a first perforated well conduit section (C) traversing a production zone (PZ), by first initiating removal of said material (LCM) upwardly from a lowermost portion (LP) of said section (C) and by subsequent continuation of removal of said material (LCM) downwardly from an uppermost portion (UP) of said section (C), comprising the steps of: (1) assembling a second conduit (10) which carries a zone isolator (11), a fluid flow cross-over tool (T-1, T-2), and fluid communicating means (12) comprising first and second communicating members (12a, 12b); (2) running the second conduit (10) into the well (W) until the isolator (11) is positioned above the production zone (PZ) with the first communicating members (12a) being in proximity to the uppermost end of the perforations (P) and the second communicating member (12b) being in proximity to the lowermost end of the perforations (P); (3) sealingly securing the isolator (11) within and against the first well conduit (C) above said zone (PZ); (4) manipulating the fluid cross-over tool (T-1, T-2) to a first position to permit downward fluid flow therethrough to pass exteriorly out of said communicating means (12) through only the second communicating member (12b) and upwardly to the top of the well (W) above said isolator (11) through an annulus defined between said first well conduit (C) and another conduit (10) concentrically disposed therein; (5) moving said fluid cross-over tool (T-1, T-2) to a second position whereby fluid is permitted to pass through said fluid cross-over tool (T-1, T-2) downwardly therethrough and exteriorly through only said second communicating member (12b) and is prevented from flowing to the annular area (34) above said isolator (11) between said first well conduit (C) and said concentrically disposed conduit (10) therethrough, whereby fluid for removal of said lost circulation material (LCM) may be squeezed into the lowermost of said perforations (P) for removal of said lost circulation material (LCM) therefrom; (6) manipulating said fluid cross-over tool (T-1, T-2) to a third position whereby fluid for removal of said lost circulation material (LCM) passes through said fluid cross-over tool (T-1, T-2), thence exteriorly below said isolator (11) in an annular area between said first perforated well conduit (C) and the fluid communicating means (12), into contact with the other of said perforations (P) through said perforated well conduit section (C), thence through only the second (12b) of said first and second fluid communicating members (12a, 12b), thence through the interior of said cross-over tool (T-1, T-2) and into the annular area (34) above said isolator (11) between said first well conduit (C) and the concentrically disposed conduit (10) therethrough; (7) manipulating said cross-over tool (T-1, T-2) to another position whereby said fluid for removal of said lost circulation material (LCM) passes downwardly through said cross-over tool (T-1, T-2), thence within the annular areas below said isolator (11) between said first perforated well conduit section (C) and said communicating means (12), then into contact with the perforation (P) of the first perforated well conduit section (C) and into at least one of the first and second communicating members (12a, 12b), through the interior of the cross-over tool (T-1, T-2), thence outwardly above said isolator (11) through the annular area (34) between said first well conduit member (C) and the concentric conduit (10) positioned therethrough to the top of the well; and (8) preventing continued flow above said isolator (11) within said annular area between said first well conduit member (C) and the concentric conduit (10) disposed therethrough by manipulating valve means in communication with said annular area (34) above said isolator (11) between said first well conduit (C) and the concentric conduit (10) positioned therethrough to closed position whereby said fluid for removal of lost circulation material (LCM) may be squeezed into said perforations (P) through said first perforated well conduit section.
Claim 14
Independent Claim
763 words
A method of injection of fluid within a subterranean well (W) for removal of lost circulation material (LCM) which has been deposited within perforations (P) through a first perforated well conduit section (C) traversing a production zone (PZ), by first initiating removal of said material (LCM) upwardly from a lowermost portion (LP) of said section and by subsequent continuation of removal of said material (LCM) downwardly from an uppermost portion (UP) of said section, comprising the steps of: (1) assembling a second conduit (10) which carries a zone isolator (11), a fluid flow cross-over tool (T-1, T-2), and fluid communicating means (12) comprising first and second communicating members (12a, 12b); (2) running the second conduit (10) into the well (W) until the isolator (11) is positioned above the production zone (PZ) with the first communicating member (12a) being in proximity to the uppermost end of the perforations (P) and the second communicating member (12b) being in proximity to the lowermost end of the perforations (P); (3) sealingly securing the isolator (11) within and against the first well conduit (C) above said zone; (4) manipulating the fluid cross-over tool (T-1, T-2) to a first position to permit downward fluid flow therethrough to pass exteriorly out of said communicating means (12) through only the second communicating member (12b) and upwardly to the top of the well (W) above said isolator (11) through an annulus (34) defined between said first well conduit (C) and the second conduit (10) concentrically disposed therein; (5) moving said fluid cross-over tool (T-1, T-2) to a second position whereby fluid is permitted to pass through said fluid cross-over tool (T-1, T-2) downwardly therethrough and exteriorly through only said second communicating member (12b) and is prevented from flowing to the annular area (34) above said isolator (11) between said first well conduit (C) and said concentrically disposed second conduit (10) therethrough, whereby fluid for removal of said lost circulation material (LCM) may be squeezed into the lowermost of said perforations (P) for removal of said lost circulation material (LCM) there from; (6) manipulating said fluid cross-over tool (T-1, T-2) to a third position whereby fluid for removal of said lost circulation material (LCM) passes through said fluid cross-over tool (T-1, T-2), thence exteriorly below said isolator (11) in an annular area between said first perforated well conduit (C) and the fluid communicating means (12), into contact with the other of said perforations (P) through said perforated well conduit section (C), thence through only the second (12b) of said first and second fluid communicating members (12a, 12b), thence through the interior of said cross-over tool (T-1, T-2) and into the annular area (34) above said isolator (11) between said first well conduit (C) and the concentrically disposed second conduit (10) therethrough; (7) manipulating said cross-over tool (T-1, T-2) to another position whereby said fluid for removal of said lost circulation material (LCM) passes downwardly through said cross-over tool (T-1, T-2), thence within the annular area below said isolator (11) between said first perforated well conduit section (C) and said communicating means (12), then into contact with the perforations (P) of the first perforated well conduit section (C) and into at least one of the first and second communicating members (12a, 12b), through the interior of the cross-over tool (T-1, T-2), thence outwardly above said isolator (11) through the annular area (34) between said first well conduit member (C) and the concentric second conduit (10) positioned therethrough to the top of the well (W); (8) preventing continued flow above said isolator (11) within said annular area (34) between said first well conduit member (C) and the concentric second conduit (10) disposed therethrough by manipulating valve means in communication with said annular area (34) above said isolator (11) between said first well conduit (C) and the concentric second conduit (10) positioned therethrough to closed position whereby said fluid for removal of lost circulation material (LCM) may be squeezed into said perforations (P) through said first perforated well conduit section (C); and (9) manipulating said cross-over tool (T1-T2) to a position and introducing fluid containing gravel through said cross-over tool (T-1, T-2) for deposition of said gravel exterior of said communicating means (12) and for flow.of fluid without said gravel interiorly of said cross-over tool (T-1, T-2) thence exteriorly of said cross-over tool (T-1, T-2) above said isolator (11) in the annular area (34) between the first well conduit (C) and the concentrically disposed conduit (10) therethrough, while said isolator (11) still remains in sealing securement against the first well conduit (C) above said zone (PZ).
Claim 15
Independent Claim
763 words
A method of injection of fluid within a subterranean well (W) for removal of lost circulation material (LCM) which has been deposited within perforations (P) through a first perforated well conduit section (C) traversing a production zone (PZ), by first initiating removal of said material (LCM) upwardly from a lowermost portion (LP) of said section and by subsequent continuation of removal of said material (LCM) downwardly from an uppermost portion (UP) of said section, comprising the steps of: (1) assembling a second conduit (10) which carries a zone isolator (11), a fluid flow cross-over tool (T-1, T-2), and fluid communicating means (12) comprising first and second communicating members (12a, 12b); (2) running the second conduit (10) into the well (W) until the isolator (11) is positioned above the production zone (PZ) with the first communicating member (12a) being in proximity to the uppermost end of the perforations (P) and the second communicating member (12b) being in proximity to the lowermost end of the perforations (P); (3) sealingly securing the isolator (11) within and against the first well conduit (C) above said zone; (4) manipulating the fluid cross-over tool (T-1, T-2) to a first position to permit downward fluid flow therethrough to pass exteriorly out of said communicating means (12) through only the second communicating member (12b) and upwardly to the top of the well (W) above said isolator (11) through an annulus (34) defined between said first well conduit (C) and the second conduit (10) concentrically disposed therein; (5) moving said fluid cross-over tool (T-1, T-2) to a second position whereby fluid is permitted to pass through said fluid cross-over tool (T-1, T-2) downwardly therethrough and exteriorly through only said second communicating member (12b) and is prevented from flowing to the annular area (34) above said isolator (11) between said first well conduit (C) and said concentrically disposed second conduit (10) therethrough, whereby fluid for removal of said lost circulation material (LCM) may be squeezed into the lowermost of said perforations (P) for removal of said lost circulation material (LCM) there from; (6) manipulating said fluid cross-over tool (T-1, T-2) to a third position whereby fluid for removal of said lost circulation material (LCM) passes through said fluid cross-over tool (T-1, T-2), thence exteriorly below said isolator (11) in an annular area between said first perforated well conduit (C) and the fluid communicating means (12), into contact with the other of said perforations (P) through said perforated well conduit section (C), thence through only the second (12b) of said first and second fluid communicating members (12a, 12b), thence through the interior of said cross-over tool (T-1, T-2) and into the annular area (34) above said isolator (11) between said first well conduit (C) and the concentrically disposed second conduit (10) therethrough; (7) manipulating said cross-over tool (T-1, T-2) to another position whereby said fluid for removal of said lost circulation material (LCM) passes downwardly through said cross-over tool (T-1, T-2), thence within the annular area below said isolator (11) between said first perforated well conduit section (C) and said communicating means (12), then into contact with the perforations (P) of the first perforated well conduit section (C) and into at least one of the first and second communicating members (12a, 12b), through the interior of the cross-over tool (T-1, T-2), thence outwardly above said isolator (11) through the annular area (34) between said first well conduit member (C) and the concentric second conduit (10) positioned therethrough to the top of the well (W); (8) preventing continued flow above said isolator (11) within said annular area (34) between said first well conduit member (C) and the concentric second conduit (10) disposed therethrough by manipulating valve means in communication with said annular area (34) above said isolator (11) between said first well conduit (C) and the concentric second conduit (10) positioned therethrough to closed position whereby said fluid for removal of lost circulation material (LCM) may be squeezed into said perforations (P) through said first perforated well conduit section (C); and (9) manipulating said cross-over tool (T1-T2) to a position and introducing fluid containing gravel through said cross-over tool (T-1, T-2) for deposition of said gravel exterior of said communicating means (12) and for flow.of fluid without said gravel interiorly of said cross-over tool (T-1, T-2) thence exteriorly of said cross-over tool (T-1, T-2) above said isolator (11) in the annular area (34) between the first well conduit (C) and the concentrically disposed conduit (10) therethrough, while said isolator (11) still remains in sealing securement against the first well conduit (C) above said zone (PZ).
Claim 16
Independent Claim
788 words
A method of injection of fluid within a subterranean well (W) for removal of lost circulation material (LCM) which has been deposited within perforations (P) through a first perforated well conduit section (C) traversing a production zone (PZ), by first initiating removal of said material (LCM) upwardly from a lowermost portion (LP) of said section and by subsequent continuation of removal of said material (LCM) downwardly from an uppermost portion (UP) of said section, comprising the steps of: (1) assembling a second conduit (10) which carries a zone isolator (11), a fluid flow cross-over tool (T-1, T-2), and fluid communicating means (12) comprising first and second communicating members (12a, 12b); (2) running the second conduit (10) into the well (W) until the isolator (11) is positioned above the production zone (PZ) with the first communicating member (12a) in proximity to the uppermost end of the perforations (P) and the second communicating member (12b) being in proximity to the lowermost end of the perforations (P); (3) sealingly securing the isolator (11) within and against the first well conduit (C) above said zone (PZ); (4) manipulating the fluid cross-over tool (T-1, T-2) to a first position to permit downward fluid flow therethrough to pass exteriorly out of said communicating means (12) through only the second communicating member (12b) and upwardly to the top of the well (W) above said isolator (11) through an annular area (34) defined between said first well conduit and (C) the second conduit (10) concentrically disposed therein; (5) moving said fluid cross-over tool (T-1, T-2) to a second position whereby fluid is permitted to pass through said fluid cross-over tool (T-1, T-2) downwardly therethrough and exteriorly through only said second communicating member (12b) and is prevented from flowing to the annular area (34) above said isolator (11) between said first well conduit (C) and said concentrically disposed conduit (10) therethrough, whereby fluid for removal of said lost circulation material (LCM) may be squeezed into the lowermost of said perforations (P) for removal of said lost circulation material (LCM) therefrom; (6) manipulating said fluid cross-over tool (T-1, T-2) to a third position whereby fluid for removal of said lost circulation material (LCM) passes through said fluid cross-over tool (T-1, T-2), thence exteriorly below said isolator (11) in an annular area between said first perforated well conduit (C) and the fluid communicating means (12), into contact with the other of said perforations (P) through said perforated well conduit section (C), thence through only the second (12b) of said first and second fluid communicating members (12a, 12b) thence through the interior of said cross-over tool (T-1, T-2) and into the annular area (34) above said isolator (11) between said first well conduit (C) and the concentrically disposed conduit (10) therethrough; (7) manipulating said cross-over tool (T-1, T-2) to another position whereby said fluid for removal of said lost circulation material (LCM) passes downwardly through said cross-over tool (T-1, T-2), thence within the annular area below said isolator (11) between said first perforated well conduit section (C) and said communicating means (12), then into contact with the perforations (P) of the first perforated well conduit section (C) and into at least one of the first and second communicating members (12a, 12b), through the interior of the cross-over tool (T-1, T-2), thence outwardly above said isolator (11) through the annular well (34) between said first well conduit member (C) and the concentric second conduit (10) positioned therethrough to the top of the well (W); (8) preventing continued flow above said isolator (11) within said annular area (34) between said first well conduit member (C) and the concentric conduit (10) disposed therethrough by manipulating valve means in communication with said annular area (34) above said isolator (11) between said first well conduit (C) and the concentric conduit (10) positioned therethrough to closed position whereby said fluid for removal of lost circulation material (LCM) may be squeezed into said perforations (P) through said first perforated well conduit section (C); (9) manipulating said cross-over tool (T-1, T-2) to a position and introducing fluid containing gravel through said cross-over tool (T-1, T-2) for deposition of said gravel exterior of said communicating means (12) and for flow of fluid without said gravel interiorly of said cross-over tool (T-1, T-2), thence exteriorly of said cross-over tool (T-1, T-2) above said isolator (11) in the annular area (34) between the first well conduit (C) and the concentrically disposed conduit (10) therethrough, while said isolator (11) still remains in sealing securement against the first well conduit (C) above said zone (PZ); and (10) manipulating said cross-over tool (T-1, T-2) to squeeze said gravel into place in said well adjacent said perforations (P) and exterior of said communicating means (12).
Claim 17
Independent Claim
788 words
A method of injection of fluid within a subterranean well (W) for removal of lost circulation material (LCM) which has been deposited within perforations (P) through a first perforated well conduit section (C) traversing a production zone (PZ), by first initiating removal of said material (LCM) upwardly from a lowermost portion (LP) of said section and by subsequent continuation of removal of said material (LCM) downwardly from an uppermost portion (UP) of said section, comprising the steps of: (1) assembling a second conduit (10) which carries a zone isolator (11), a fluid flow cross-over tool (T-1, T-2), and fluid communicating means (12) comprising first and second communicating members (12a, 12b); (2) running the second conduit (10) into the well (W) until the isolator (11) is positioned above the production zone (PZ) with the first communicating member (12a) in proximity to the uppermost end of the perforations (P) and the second communicating member (12b) being in proximity to the lowermost end of the perforations (P); (3) sealingly securing the isolator (11) within and against the first well conduit (C) above said zone (PZ); (4) manipulating the fluid cross-over tool (T-1, T-2) to a first position to permit downward fluid flow therethrough to pass exteriorly out of said communicating means (12) through only the second communicating member (12b) and upwardly to the top of the well (W) above said isolator (11) through an annular area (34) defined between said first well conduit and (C) the second conduit (10) concentrically disposed therein; (5) moving said fluid cross-over tool (T-1, T-2) to a second position whereby fluid is permitted to pass through said fluid cross-over tool (T-1, T-2) downwardly therethrough and exteriorly through only said second communicating member (12b) and is prevented from flowing to the annular area (34) above said isolator (11) between said first well conduit (C) and said concentrically disposed conduit (10) therethrough, whereby fluid for removal of said lost circulation material (LCM) may be squeezed into the lowermost of said perforations (P) for removal of said lost circulation material (LCM) therefrom; (6) manipulating said fluid cross-over tool (T-1, T-2) to a third position whereby fluid for removal of said lost circulation material (LCM) passes through said fluid cross-over tool (T-1, T-2), thence exteriorly below said isolator (11) in an annular area between said first perforated well conduit (C) and the fluid communicating means (12), into contact with the other of said perforations (P) through said perforated well conduit section (C), thence through only the second (12b) of said first and second fluid communicating members (12a, 12b) thence through the interior of said cross-over tool (T-1, T-2) and into the annular area (34) above said isolator (11) between said first well conduit (C) and the concentrically disposed conduit (10) therethrough; (7) manipulating said cross-over tool (T-1, T-2) to another position whereby said fluid for removal of said lost circulation material (LCM) passes downwardly through said cross-over tool (T-1, T-2), thence within the annular area below said isolator (11) between said first perforated well conduit section (C) and said communicating means (12), then into contact with the perforations (P) of the first perforated well conduit section (C) and into at least one of the first and second communicating members (12a, 12b), through the interior of the cross-over tool (T-1, T-2), thence outwardly above said isolator (11) through the annular well (34) between said first well conduit member (C) and the concentric second conduit (10) positioned therethrough to the top of the well (W); (8) preventing continued flow above said isolator (11) within said annular area (34) between said first well conduit member (C) and the concentric conduit (10) disposed therethrough by manipulating valve means in communication with said annular area (34) above said isolator (11) between said first well conduit (C) and the concentric conduit (10) positioned therethrough to closed position whereby said fluid for removal of lost circulation material (LCM) may be squeezed into said perforations (P) through said first perforated well conduit section (C); (9) manipulating said cross-over tool (T-1, T-2) to a position and introducing fluid containing gravel through said cross-over tool (T-1, T-2) for deposition of said gravel exterior of said communicating means (12) and for flow of fluid without said gravel interiorly of said cross-over tool (T-1, T-2), thence exteriorly of said cross-over tool (T-1, T-2) above said isolator (11) in the annular area (34) between the first well conduit (C) and the concentrically disposed conduit (10) therethrough, while said isolator (11) still remains in sealing securement against the first well conduit (C) above said zone (PZ); and (10) manipulating said cross-over tool (T-1, T-2) to squeeze said gravel into place in said well adjacent said perforations (P) and exterior of said communicating means (12).
Claim 18
Independent Claim
708 words
A method of injection of fluid within a subterranean well (W) for removal of lost circulation material (LCM) which has been deposited within perforations (P) through a first perforated well conduit section (C) traversing a production zone (PZ), by first initiating removal of said material (LCM) upwardly from a lowermost portion (LP) of said section (C) and by subsequent continuation of removal of said material downwardly from an uppermost portion (UP) of said section (C), comprising the steps of: (1) assembling a second conduit (10) which carries a zone isolator (11), a fluid flow cross-over tool (T-1, T-2), and fluid communicating means (12) comprising first and second communicating members (12a, 12b); (2) running the second conduit (10) into the well (W) until the isolator (11) is positioned above the production zone (PZ) with the first communicating member (12a) in proximity to the uppermost end of the perforations (P) and the second communicating member (12b) being in proximity to the lowermost end of the perforations (P); (3) sealingly securing the isolator (11) within and against the first well conduit (C) above said zone (PZ); (4) manipulating the fluid cross-over tool (T-1, T-2) to a first position to permit downward fluid flow therethrough to pass exteriorly out of said communicating means (12) through only the second communicating member (12b) and upwardly to the top of the well (W) above said isolator (11) through an annular area (34) defined between said first well conduit (C) and the second conduit (10) concentrically disposed therein; (5) moving said fluid cross-over tool (T-1, T-2) to a second position whereby fluid is permitted to pass through said fluid cross-over tool (T-1, T-2) downwardly therethrough and exteriorly through only said second communicating member (12b) and is prevented from flowing to the annular area (34) above said isolator (11) between said first well conduit (C) and said concentrically disposed conduit (10) therethrough, whereby fluid for removal of said lost circulation material (LCM) may be squeezed into the lowermost of said perforations (P) for removal of said lost circulation material (LCM) therefrom; (6) manipulating said fluid cross-over tool (T-1, T-2) to a third position whereby fluid for removal of said lost circulation material (LCM) passes through said fluid cross-over tool (T-1, T-2), thence exteriorly below said isolator (11) in an annular area between said first perforated well conduit (C) and the fluid communicating means (12), into contact with the other of said perforations (P) through said perforated well conduit section (C), thence through only the second (12b) of said first and second fluid communicating members (12a, 12b), thence through the interior of said cross-over tool (T-1, T-2) and into the annular area (34) above said isolator (11) between said first well conduit (C) and the concentrically disposed conduit (10) therethrough; (7) manipulating said cross-over tool (T-1, T-2) to another position whereby said fluid for removal of said lost circulation material (LCM) passes downwardly through said cross-over tool (T-1, T-2), thence within the annular area below said isolator (11) between said first perforated well conduit section (C) and said communicating means (12), then into contact with the perforations (P) of the first perforated well conduit section (C) and into at least one of the first and second communicating members (12a, 12b), through the interior of the cross-over tool (T-1, T-2), thence outwardly above said isolator (11) through the annular area (34) betwwen said first well conduit member (C) and the concentric conduit (10) positioned therethrough to the top of the well; (8) preventing continued flow above said isolator (11) within said annular area (34) between said first well conduit member (C) and the concentric conduit (10) disposed therethrough by manipulating valve means in communication with said annular area (34) above said isolator (11) between said first well conduit (C) and the concentric conduit (10) positioned therethrough to closed position whereby said fluid for removal of lost circulation material (LCM) may be squeezed into said perforations (P) through said first perforated well conduit section (C); and (9) forming a production flow path from the production zone (PZ), through the perforations (P), through the communicating means (12) and uphole of the top of the well (W), while the isolator (11) still is in sealing securement against the first well conduit (C).
Claim 19
Independent Claim
708 words
A method of injection of fluid within a subterranean well (W) for removal of lost circulation material (LCM) which has been deposited within perforations (P) through a first perforated well conduit section (C) traversing a production zone (PZ), by first initiating removal of said material (LCM) upwardly from a lowermost portion (LP) of said section (C) and by subsequent continuation of removal of said material downwardly from an uppermost portion (UP) of said section (C), comprising the steps of: (1) assembling a second conduit (10) which carries a zone isolator (11), a fluid flow cross-over tool (T-1, T-2), and fluid communicating means (12) comprising first and second communicating members (12a, 12b); (2) running the second conduit (10) into the well (W) until the isolator (11) is positioned above the production zone (PZ) with the first communicating member (12a) in proximity to the uppermost end of the perforations (P) and the second communicating member (12b) being in proximity to the lowermost end of the perforations (P); (3) sealingly securing the isolator (11) within and against the first well conduit (C) above said zone (PZ); (4) manipulating the fluid cross-over tool (T-1, T-2) to a first position to permit downward fluid flow therethrough to pass exteriorly out of said communicating means (12) through only the second communicating member (12b) and upwardly to the top of the well (W) above said isolator (11) through an annular area (34) defined between said first well conduit (C) and the second conduit (10) concentrically disposed therein; (5) moving said fluid cross-over tool (T-1, T-2) to a second position whereby fluid is permitted to pass through said fluid cross-over tool (T-1, T-2) downwardly therethrough and exteriorly through only said second communicating member (12b) and is prevented from flowing to the annular area (34) above said isolator (11) between said first well conduit (C) and said concentrically disposed conduit (10) therethrough, whereby fluid for removal of said lost circulation material (LCM) may be squeezed into the lowermost of said perforations (P) for removal of said lost circulation material (LCM) therefrom; (6) manipulating said fluid cross-over tool (T-1, T-2) to a third position whereby fluid for removal of said lost circulation material (LCM) passes through said fluid cross-over tool (T-1, T-2), thence exteriorly below said isolator (11) in an annular area between said first perforated well conduit (C) and the fluid communicating means (12), into contact with the other of said perforations (P) through said perforated well conduit section (C), thence through only the second (12b) of said first and second fluid communicating members (12a, 12b), thence through the interior of said cross-over tool (T-1, T-2) and into the annular area (34) above said isolator (11) between said first well conduit (C) and the concentrically disposed conduit (10) therethrough; (7) manipulating said cross-over tool (T-1, T-2) to another position whereby said fluid for removal of said lost circulation material (LCM) passes downwardly through said cross-over tool (T-1, T-2), thence within the annular area below said isolator (11) between said first perforated well conduit section (C) and said communicating means (12), then into contact with the perforations (P) of the first perforated well conduit section (C) and into at least one of the first and second communicating members (12a, 12b), through the interior of the cross-over tool (T-1, T-2), thence outwardly above said isolator (11) through the annular area (34) betwwen said first well conduit member (C) and the concentric conduit (10) positioned therethrough to the top of the well; (8) preventing continued flow above said isolator (11) within said annular area (34) between said first well conduit member (C) and the concentric conduit (10) disposed therethrough by manipulating valve means in communication with said annular area (34) above said isolator (11) between said first well conduit (C) and the concentric conduit (10) positioned therethrough to closed position whereby said fluid for removal of lost circulation material (LCM) may be squeezed into said perforations (P) through said first perforated well conduit section (C); and (9) forming a production flow path from the production zone (PZ), through the perforations (P), through the communicating means (12) and uphole of the top of the well (W), while the isolator (11) still is in sealing securement against the first well conduit (C).
Claim 20
Independent Claim
811 words
A method of injection of fluid within a subterranean well (W) for removal of lost circulation material (LCM) which has been deposited within perforations (P) through a first perforated well conduit section (C) traversing a production zone (PZ), by first initiating removal of said material (LCM) upwardly from a lowermost portion (LP) of said section and by subsequent continuation of removal of said material (LCM) downwardly from the uppermost portion (UP) of said section, comprising the steps of: (1) assembling a second conduit (10) which carries a zone isolator (11), a fluid flow cross-over tool (T-1, T-2), and fluid communicating means (12) comprising first and second communicating members (12a, 12); (2) running the second conduit (10) into the well (W) until the isolator (11) is positioned above the production zone (PZ) with the first communicating member (12a) in proximity to the uppermost end of the perforations (P) and the second communicating member (12a) being in proximity to the lowermost end of the perforations (P); (3) sealingly securing the isolator (11) within and against the first well conduit (C) above said zone (PZ); (4) manipulating the fluid cross-over tool (T-1, T-2) to a first position to permit downward fluid flow therethrough to pass exteriorly of said communicating means (12) through only the second communicating member (12b) and upwardly to the top of the well (W) above said isolator (11) through an annular area (34) defined between said first well conduit (C) and the second conduit (10) concentrically disposed therein; (5) moving said fluid cross-over tool (T-1, T-2) to a second position whereby fluid is permitted to pass through said fluid cross-over tool (T-1, T-2) downwardly therethrough and exteriorly through only said second communicating member (12b) and is prevented from flowing to the annular area (34) above said isolator (11) between said first well conduit (C) and said concentrically disposed conduit (10) therethrough, whereby fluid for removal of said lost circulation material (LCM) may be squeezed into the lowermost of said perforations (P) for removal of said lost circulation material (LCM) therefrom; (6) manipulating said fluid cross-over tool (T-1, T-2) to a third position whereby fluid for removal of said lost circulation material (LCM) passes through said fluid cross-over tool (T-1, T-2), thence exteriorly below said isolator (11) in an annular area between said first perforated well conduit (C) and the fluid communicating means (12), into contact with the other of said perforations (P) through said perforated well conduit section (C), thence through only the second (12b) of said first and second fluid communicating members (12a, 12b), thence through the interior of said cross-over tool (T-1, T-2) and into the annular area (34) above said isolator (11) between said first well conduit (C) and the concentrically disposed conduit (10) therethrough; (7) manipulating said cross-over tool (T-1, T-2) to another position whereby said fluid for removal of said lost circulation material (LCM) passes downwardly through said cross-over tool (T-1, T-2), thence within the annular area below said isolator (11) between said first perforated well conduit section (C) and said communicating means (12), then into contact with the perforations (P) of the first perforated well conduit section (C) and into at least one of the first and second communicating members (12a, 12b), through the interior of the cross-over tool (T-1, T-2), thence outwardly above said isolator (11) through the annular area (34) between said first well conduit member (C) and the concentric conduit (10) positioned therethrough to the top of the well (W); (8) preventing continued flow above said isolator (11) within said annular area (34) between said first well conduit member (C) and the concentric conduit (10) disposed therethrough by manipulating valve means in communication with said annular area (34) above said isolator (11) between said first well conduit (C) and the concentric conduit (10) positioned therethrough to closed position whereby said fluid for removal of lost circulation material (LCM) may be squeezed into said perforations (P) through said first perforated well conduit section (C); (9) manipulating said cross-over tool (T-1, T-2) to a position and introducing fluid containing gravel through said cross-over tool (T-1, T-2) for deposition of said gravel exterior of said communicating means (12) and for flow of fluid without said gravel interiorly of said cross-over tool (T-1, T-2) thence exteriorly of said cross-over tool (T-1, T-2) above said isolator (11) in the annular area between the first well conduit and the concentrically disposed conduit (10) therethrough, while said isolator (11) still remains in sealing securement against the first well conduit (C) above said zone (PZ); and (10) forming a production flow path from the production zone (PZ) through the perforations (P), through the deposited gravel, through the communicating means (12) and uphole to the top of the well (W) while the isolator still is in sealing securement position within and against the first well conduit (C) above said zone (PZ).
Claim 21
Independent Claim
811 words
A method of injection of fluid within a subterranean well (W) for removal of lost circulation material (LCM) which has been deposited within perforations (P) through a first perforated well conduit section (C) traversing a production zone (PZ), by first initiating removal of said material (LCM) upwardly from a lowermost portion (LP) of said section and by subsequent continuation of removal of said material (LCM) downwardly from the uppermost portion (UP) of said section, comprising the steps of: (1) assembling a second conduit (10) which carries a zone isolator (11), a fluid flow cross-over tool (T-1, T-2), and fluid communicating means (12) comprising first and second communicating members (12a, 12); (2) running the second conduit (10) into the well (W) until the isolator (11) is positioned above the production zone (PZ) with the first communicating member (12a) in proximity to the uppermost end of the perforations (P) and the second communicating member (12a) being in proximity to the lowermost end of the perforations (P); (3) sealingly securing the isolator (11) within and against the first well conduit (C) above said zone (PZ); (4) manipulating the fluid cross-over tool (T-1, T-2) to a first position to permit downward fluid flow therethrough to pass exteriorly of said communicating means (12) through only the second communicating member (12b) and upwardly to the top of the well (W) above said isolator (11) through an annular area (34) defined between said first well conduit (C) and the second conduit (10) concentrically disposed therein; (5) moving said fluid cross-over tool (T-1, T-2) to a second position whereby fluid is permitted to pass through said fluid cross-over tool (T-1, T-2) downwardly therethrough and exteriorly through only said second communicating member (12b) and is prevented from flowing to the annular area (34) above said isolator (11) between said first well conduit (C) and said concentrically disposed conduit (10) therethrough, whereby fluid for removal of said lost circulation material (LCM) may be squeezed into the lowermost of said perforations (P) for removal of said lost circulation material (LCM) therefrom; (6) manipulating said fluid cross-over tool (T-1, T-2) to a third position whereby fluid for removal of said lost circulation material (LCM) passes through said fluid cross-over tool (T-1, T-2), thence exteriorly below said isolator (11) in an annular area between said first perforated well conduit (C) and the fluid communicating means (12), into contact with the other of said perforations (P) through said perforated well conduit section (C), thence through only the second (12b) of said first and second fluid communicating members (12a, 12b), thence through the interior of said cross-over tool (T-1, T-2) and into the annular area (34) above said isolator (11) between said first well conduit (C) and the concentrically disposed conduit (10) therethrough; (7) manipulating said cross-over tool (T-1, T-2) to another position whereby said fluid for removal of said lost circulation material (LCM) passes downwardly through said cross-over tool (T-1, T-2), thence within the annular area below said isolator (11) between said first perforated well conduit section (C) and said communicating means (12), then into contact with the perforations (P) of the first perforated well conduit section (C) and into at least one of the first and second communicating members (12a, 12b), through the interior of the cross-over tool (T-1, T-2), thence outwardly above said isolator (11) through the annular area (34) between said first well conduit member (C) and the concentric conduit (10) positioned therethrough to the top of the well (W); (8) preventing continued flow above said isolator (11) within said annular area (34) between said first well conduit member (C) and the concentric conduit (10) disposed therethrough by manipulating valve means in communication with said annular area (34) above said isolator (11) between said first well conduit (C) and the concentric conduit (10) positioned therethrough to closed position whereby said fluid for removal of lost circulation material (LCM) may be squeezed into said perforations (P) through said first perforated well conduit section (C); (9) manipulating said cross-over tool (T-1, T-2) to a position and introducing fluid containing gravel through said cross-over tool (T-1, T-2) for deposition of said gravel exterior of said communicating means (12) and for flow of fluid without said gravel interiorly of said cross-over tool (T-1, T-2) thence exteriorly of said cross-over tool (T-1, T-2) above said isolator (11) in the annular area between the first well conduit and the concentrically disposed conduit (10) therethrough, while said isolator (11) still remains in sealing securement against the first well conduit (C) above said zone (PZ); and (10) forming a production flow path from the production zone (PZ) through the perforations (P), through the deposited gravel, through the communicating means (12) and uphole to the top of the well (W) while the isolator still is in sealing securement position within and against the first well conduit (C) above said zone (PZ).
Claim 22
Independent Claim
321 words
An apparatus for injection of fluid within a subterranean well (W) for removal of lost circulation material (LCM) which has been deposited within perforations (P) through a first perforated well conduit section (C) traversing a production zone (PZ) by first initiating removal of said material (LCM) upwardly from the lowermost portion (LP) of said section and by subsequent continuation of removal of said material (LCM) downwardly from the uppermost portion (UP) of said section, comprising: (1) a second conduit (10) which carries a zone isolator (11) and fluid communicating means (12) comprising first and second communicating members (12a, 12b); (2) means for running the second conduit (10) into the well (W) until the isolator (11) is positioned above the production zone (PZ) with the first communicating member (12a) in proximity to the uppermost end of the perforations (P) and the second communicating member (12b) in proximity to the lowermost end of the perforations (P); (3) means for sealingly securing the isolator (11) within and against the first well conduit (C) above said zone (PZ); (4) means for forming a first injection path for said fluid which extends from the top of the well (W), through the interior of said communicating means (12) and out only the exterior of the second communicating member (12b) and into the lowermost of said perforations (P) for contact with and removal of said lost circulation material (LCM) therefrom; and (5) means for forming a second injection path for said fluid which extends from the top of the well (W) through the first communicating member (12a) of said communicating means (12) while preventing said fluid from passing from the interior to the exterior of said second communicating member (12b), said second injection path for said fluid continuing out of said first communicating member (12a) and into the other of said perforations (P) for contact with and removal of the remainder of said lost circulation material (LCM) therefrom.
Claim 23
Independent Claim
321 words
An apparatus for injection of fluid within a subterranean well (W) for removal of lost circulation material (LCM) which has been deposited within perforations (P) through a first perforated well conduit section (C) traversing a production zone (PZ) by first initiating removal of said material (LCM) upwardly from the lowermost portion (LP) of said section and by subsequent continuation of removal of said material (LCM) downwardly from the uppermost portion (UP) of said section, comprising: (1) a second conduit (10) which carries a zone isolator (11) and fluid communicating means (12) comprising first and second communicating members (12a, 12b); (2) means for running the second conduit (10) into the well (W) until the isolator (11) is positioned above the production zone (PZ) with the first communicating member (12a) in proximity to the uppermost end of the perforations (P) and the second communicating member (12b) in proximity to the lowermost end of the perforations (P); (3) means for sealingly securing the isolator (11) within and against the first well conduit (C) above said zone (PZ); (4) means for forming a first injection path for said fluid which extends from the top of the well (W), through the interior of said communicating means (12) and out only the exterior of the second communicating member (12b) and into the lowermost of said perforations (P) for contact with and removal of said lost circulation material (LCM) therefrom; and (5) means for forming a second injection path for said fluid which extends from the top of the well (W) through the first communicating member (12a) of said communicating means (12) while preventing said fluid from passing from the interior to the exterior of said second communicating member (12b), said second injection path for said fluid continuing out of said first communicating member (12a) and into the other of said perforations (P) for contact with and removal of the remainder of said lost circulation material (LCM) therefrom.
Claim 24
Dependent Claim
47 words
Apparatus according to Claim 17 wherein the fluid communicating members (12a, 12b) comprise slotted screens circumferentially extending around said second conduit (10), and said second conduit (10) comprises a portion interior of said screens ported to permit fluid flow between said screen and said second conduit (10).
Claim 25
Dependent Claim
47 words
Apparatus according to Claim 15 wherein the fluid communicating members (12a, 12b) comprise wire wrapped screens circumferentially extending around said second conduit (10), and said second conduit (10) comprises a portion interior of said screens ported to permit fluid flow between said screen and said second conduit.
Claim 26
Dependent Claim
17 words
Apparatus according to Claim 15, 16 or 17 wherein said second conduit (10) is a tubular conduit.
Claim 27
Dependent Claim
30 words
Apparatus according to any one of Claims 15 to 18 wherein said first and second injection paths comprise sectional lengths of said conduit, and said conduit is a tubular conduit.
Claim 28
Dependent Claim
89 words
Apparatus according to any one of Claims 15 to 19 and further comprising: means for forming a gravel pack fluid flow path which extends from the surface downhole through the interior of the isolator (11), around the exterior of said communicating means (12), and return fluid flow path for said gravel pack fluid through the interior of said communicating means (12) and back up hole to the top of the well, (W) with the isolator sealingly secured within and against the first well conduit (C) above said zone (PZ).
Claim 29
Independent Claim
327 words
A method of injection of fluid within a subterranan well (W) for removal of lost circulation material (LCM) which has been deposited across a formation section of a production zone (PZ) within said well (W), by first initiating removal of said material (LCM) upwardly from a lowermost portion (LP) of said section and by subsequent continuation of removal of said material (LCM) downwardly from an uppermost portion (UP) of said section, comprising the steps of: (1) assembling a conduit (10) which carries a zone isolator (11) and fluid communicating means (12) comprising first and second communicating members (12a, 12b); (2) running the conduit (10) into the well until the isolator (11) is positioned above the production zone (PZ) with the first communicating member (12a) being in proximity to the uppermost end of the production zone (PZ) and the second communicating member (12b) being in proximity to the lowermost end of the production zone (PZ); (3) sealingly securing the isolator (11) within and against the wellbore above said production zone (PZ); (4) forming a first injection path for said fluid which extends from the top of the well (W), through the interior of said communicating means (12) and out only the exterior of the second communicating member (12b) and into the lowermost portion (LP) of said production zone (PZ) for contact with and removal of said lost circulation material (LCM) therefrom until a loss of circulation of said fluid is established; and (5) forming a second injection path for said fluid which extends from the top of the well (W) through the first communicating member (12a) of said communicating means (12) while preventing said fluid from passing from the interior to the exterior of said communicating member (12b), said second injection path for said fluid continuing out of said first communicating member (12a) and into the other portion (UP) of said production zone (PZ) for contact with and removal of the remainder of said lost circulation material (LCM).
Claim 30
Independent Claim
327 words
A method of injection of fluid within a subterranan well (W) for removal of lost circulation material (LCM) which has been deposited across a formation section of a production zone (PZ) within said well (W), by first initiating removal of said material (LCM) upwardly from a lowermost portion (LP) of said section and by subsequent continuation of removal of said material (LCM) downwardly from an uppermost portion (UP) of said section, comprising the steps of: (1) assembling a conduit (10) which carries a zone isolator (11) and fluid communicating means (12) comprising first and second communicating members (12a, 12b); (2) running the conduit (10) into the well until the isolator (11) is positioned above the production zone (PZ) with the first communicating member (12a) being in proximity to the uppermost end of the production zone (PZ) and the second communicating member (12b) being in proximity to the lowermost end of the production zone (PZ); (3) sealingly securing the isolator (11) within and against the wellbore above said production zone (PZ); (4) forming a first injection path for said fluid which extends from the top of the well (W), through the interior of said communicating means (12) and out only the exterior of the second communicating member (12b) and into the lowermost portion (LP) of said production zone (PZ) for contact with and removal of said lost circulation material (LCM) therefrom until a loss of circulation of said fluid is established; and (5) forming a second injection path for said fluid which extends from the top of the well (W) through the first communicating member (12a) of said communicating means (12) while preventing said fluid from passing from the interior to the exterior of said communicating member (12b), said second injection path for said fluid continuing out of said first communicating member (12a) and into the other portion (UP) of said production zone (PZ) for contact with and removal of the remainder of said lost circulation material (LCM).
Claim 31
Independent Claim
44 words
A method according to 21 wherein the fluid communicating members (12a, 12b) comprise slotted screens circumferentially extending around said conduit (10), and said conduit (10) comprises a portion interior of said screens ported to permit fluid flow between said screen and said conduit (10).
Claim 32
Independent Claim
44 words
A method according to 21 wherein the fluid communicating members (12a, 12b) comprise slotted screens circumferentially extending around said conduit (10), and said conduit (10) comprises a portion interior of said screens ported to permit fluid flow between said screen and said conduit (10).
Claim 33
Independent Claim
45 words
A method according to 21 wherein the fluid communicating members (12a, 12b) comprise wire wrapped screens circumferentially extending around said conduit (10), and said conduit (10) comprises a portion interior of said screens ported to permit fluid flow between said screen and said conduit (10).
Claim 34
Independent Claim
45 words
A method according to 21 wherein the fluid communicating members (12a, 12b) comprise wire wrapped screens circumferentially extending around said conduit (10), and said conduit (10) comprises a portion interior of said screens ported to permit fluid flow between said screen and said conduit (10).
Claim 35
Independent Claim
16 words
A method according to 21, 22 or 23 wherein said conduit (10) is a tubular conduit.
Claim 36
Independent Claim
16 words
A method according to 21, 22 or 23 wherein said conduit (10) is a tubular conduit.
Claim 37
Independent Claim
33 words
A method according to any one of claims 21 to 24 wherein said first and second injection paths comprise sectional lengths of said conduit (10) and said conduit (10) is a tubular conduit.
Claim 38
Independent Claim
95 words
A method according to any one of claims 21 to 25 and further comprising the step: with the isolator (11) continuing to be sealingly secured within and against the wall of said well adjacent said production zone (PZ), of forming a gravel pack fluid flow path which extends from the surface downhole through the interior of the isolator (11), around the exterior of said communicating means (12), and a return fluid flow path for said gravel pack fluid through the interior of said communicating means (12) and back uphole to the top of the well.
Claim 39
Independent Claim
81 words
A method according to 26 and further comprising the step of mixing gravel with a gravel pack fluid and flowing said gravel in said gravel pack fluid in said gravel pack fluid flow path until the gravel is deposited in said well below said isolator (11) and exterior of said communicating means (12), and returning the gravel pack fluid through the interior of the communicating means (12) and within said return fluid flow path uphole to the top of the well.
Claim 40
Independent Claim
81 words
A method according to 26 and further comprising the step of mixing gravel with a gravel pack fluid and flowing said gravel in said gravel pack fluid in said gravel pack fluid flow path until the gravel is deposited in said well below said isolator (11) and exterior of said communicating means (12), and returning the gravel pack fluid through the interior of the communicating means (12) and within said return fluid flow path uphole to the top of the well.
Claim 41
Independent Claim
46 words
A method according to 27, further comprising the step: with the isolator (11) still in sealingly engaged position, of forming a production flow path from the production zone (PZ), through the deposited gravel, through the communicating means (12) and uphole to the top of the well.
Claim 42
Independent Claim
46 words
A method according to 27, further comprising the step: with the isolator (11) still in sealingly engaged position, of forming a production flow path from the production zone (PZ), through the deposited gravel, through the communicating means (12) and uphole to the top of the well.