Abstract

Abstract Traffic control for controlling the occurrence of congestion in an ATM switchboard and assuring the throughput of VCs using the same output port. A buffer occupancy value measuring section measures the queue length of each output port buffer and stores the data in a buffer occupancy value table. A back-pressure outputting section outputs a transmission restart signal when a queue length in the buffer occupancy table is equal to or less than a first threshold, a transmission control signal when the queue length is between the first threshold and a second threshold, and a transmission stop signal when the queue length is equal to or more than the second threshold as the appropriate back pressure signal. A cell transmission control section transmits an ATM cell without comparing the cell transmission time with the present time if the instruction of a back pressure signal corresponding to a destination port indicates "restart" and transmits an ATM cell only if the transmission time is earlier than the present time if the instruction indicates "control".

Inventors

  • 👤 Masayuki Shinohara

Bibliographic Details

Application Number —
Jurisdiction EP
Data Source google_patents
Last Synchronized 2026-10-24 12:14
CPC Classifications
H; H04; H04L; H04L49/00; H04L49/10; H04L49/104; H04L49/105; H04L12/00; H04L12/54; H04L12/56; H04L12/5601; H04L12/5602; H04L49/30; H04L49/3081; H04L49/50; H04L49/501; H04L49/503; H04L49/505; H04L49/506; H04Q; H04Q11/00; H04Q11/04; H04Q11/0428; H04Q11/0478; H04Q3/00; H04Q3/64; H04Q3/645; H04L2012/5629; H04L2012/5631; H04L2012/5632; H04L2012/5635; H04L2012/5636; H04L2012/5678; H04L2012/5681; H04L49/20; H04L49/55; H04L49/552; H04Q2213/00; H04Q2213/13103; H04Q2213/13164; H04Q2213/13166; H04Q2213/1329

Claims Analysis

Total Claims: 24
Claim 1
Independent Claim 171 words
A switch control circuit of an ATM switchboard for switching ATM cells transferred in an asynchronous mode between an input port and an output port, said circuit comprising an input port buffer and an output port buffer provided correspondingly to said input port and said output port respectively to perform ATM cell exchange between said input port and said output port; a back-pressure function for outputting any one of a transmission restart signal, transmission stop signal, and transmission control signal in accordance with said occupancy value of said output port buffer in order to prevent cells from being unused by said output port buffer; and cell transmission control means to transmit said ATM cells at a preset first rate to an output port, when said transmission restart signal is input from said back-pressure function corresponding to said output port and to transmit said ATM cells at a preset second rate to an output port when said transmission control signal is input from said back pressure function corresponding to said output port.
Claim 2
Dependent Claim 40 words
The switch control circuit according to claim 1, wherein said back pressure function is constituted so as to output any one of said transmission restart signal, said transmission stop signal, and said transmission control signal correspondingly to said output port.
Claim 3
Dependent Claim 85 words
The switch control circuit according to claim 1, wherein said back pressure function is constituted so as to output said transmission restart signal when the occupancy value of said output port buffer is less than a preset first threshold, said transmission control signal when the occupancy value of said output port buffer is between said first threshold and a preset second threshold, and said transmission stop signal when the occupancy value of said output port buffer is equal to or more than said second threshold.
Claim 4
Dependent Claim 70 words
The switch control circuit according to claim 1, wherein said cell transmission control means includes comparison means for comparing the present time with a scheduled transmission time computed in accordance with said second rate when transmitting said ATM cells at said second rate and means for performing control by said comparison means so as to transmit said ATM cells when said scheduled transmission time is earlier than said present time.
Claim 5
Dependent Claim 57 words
The switch control circuit according to claim 1, wherein said cell transmission control means includes means for performing control so as to transmit said ATM cells at the maximum rate in order of scheduled transmission time computed in accordance with said second rate independently of the present time when transmitting said ATM cells at said first rate.
Claim 6
Dependent Claim 28 words
The switch control circuit according to claim 1, wherein said cell transmission control means includes time computing means for computing a scheduled transmission time of an ATM cell.
Claim 7
Dependent Claim 64 words
The switch control circuit according to claim 1, wherein said cell transmission control means has a list in which said ATM cells to be transmitted are arranged in order of scheduled transmission time and in which said cell transmission control controls the transmission of an ATM cell at the head of the list in accordance with a signal obtained from said back pressure function.
Claim 8
Dependent Claim 68 words
The switch control circuit according to claim 3, wherein said back pressure function first checks whether said output port buffer has an occupancy value less than said first threshold, then checks whether said output port buffer has an occupancy value between said first threshold and said second threshold, and finally checks whether said output port buffer has an occupancy value equal to or more than said second threshold.
Claim 9
Dependent Claim 74 words
The switch control circuit according to claim 8, wherein said back pressure function outputs a transmission stop signal corresponding to said output port buffer to said cell transmission control means when said output port buffer has an occupancy value equal to or more than the said second threshold and thereafter, outputs any one of said transmission restart signal, said transmission stop signal, and said transmission control signal corresponding to each output port buffer again.
Claim 10
Dependent Claim 56 words
The switch control circuit according to claim 8, wherein said back pressure function outputs any one of said transmission restart signal, said transmission stop signal, and said transmission control signal corresponding to each output port buffer again when not one of said output buffers has an occupancy value equal to or more than said second threshold.
Claim 11
Dependent Claim 62 words
The switch control circuit according to claim 7, wherein said transmission control means stop the transmission of said ATM cells and controls the transmission of an ATM cell next located in said list in accordance with a signal obtained from said back pressure function when said transmission stop signal is input to said cell transmission control means by said back pressure function.
Claim 12
Dependent Claim 73 words
The switch control circuit according to claim 7, wherein said cell transmission control means decides that a case in which said transmission restart signal, said transmission stop signal, or said transmission control signal is not input to said cell transmission control means by said back pressure function is an error and controls the transmission of the next ATM cell in said list in accordance with a signal obtained from said back pressure function.
Claim 13
Dependent Claim 131 words
A switch control method for an ATM switchboard for switching an ATM cell transferred in an asynchronous mode between an input port and an output port, the method comprising the first step of outputting any one of a transmission restart signal, transmission stop signal, and transmission control signal in accordance with the occupancy value of said output port buffer in order to prevent cells in said output port buffer from being discarded and the second step of performing control so as to transmit said ATM cell at a preset first rate to an output port when said transmission restart signal is input in said first step and transmitting said ATM cell to an output port at a preset second rate when said transmission control signal is input in said first step.
Claim 14
Dependent Claim 128 words
A traffic control method for controlling congestion in an ATM switchboard, comprising: measuring the queue length of each output port buffer and storing the buffer occupancy value in a buffer occupancy table; outputting a back-pressure control signal wherein said back-pressure control signal is a transmission restart signal when the buffer occupancy value is equal to or less than a threshold, is a transmission control signal when the buffer value is between the first threshold and a second threshold, and is a transmission stop signal when the buffer value exceeds a second threshold value; transmitting a cell without examining its transmission scheduled time if the back-pressure signal indicates "restart" for the destination port; and transmitting a cell only at its scheduled transmission time if the back-pressure signal indicates "control".
Claim 15
Dependent Claim 84 words
The switch control method according to claim 13, wherein said first step is constituted so as to output said transmission restart signal when the occupancy value of said output port buffer is less than a preset first threshold, said transmission control signal when the occupancy value of said output port buffer is between said first threshold and a preset second threshold, and said transmission stop signal when the occupancy value of said output port buffer is equal to or more than said second threshold.
Claim 16
Dependent Claim 63 words
The switch control method according to claim 13, wherein said second step includes comparing the present time with a schedule transmission time computed in accordance with said second rate when transmitting said ATM cells at said second rate and performing control so as to transmit said ATM cells when said scheduled transmission time is earlier than said present time in said third step.
Claim 17
Dependent Claim 46 words
The switch control method according to claim 13, wherein said second step includes transmitting said ATM cells at the highest rate of scheduled transmission time computed in accordance with said second rate independently of the present time when transmitting said ATM cells at said first rate.
Claim 18
Dependent Claim 32 words
The switch control method according to claim 13, wherein said second step includes transmitting said ATM cells and thereafter computing the scheduled transmission time of the next ATM cell to be transmitted.
Claim 19
Dependent Claim 59 words
The switch control method according to claim 13, wherein said second step includes generating a list by arranging said ATM cells to be transmitted in order of scheduled transmission time and the eighth step of controlling the transmission of an ATM cell located at the head of the list in accordance with a signal obtained from said first step.
Claim 20
Dependent Claim 68 words
The switch control method according to claim 13, wherein said first step first includes checking whether said output port buffer has an occupancy value less than said first threshold, then checks whether said output port buffer has an occupancy value between said first threshold and said second threshold, and finally checks whether said output port buffer has an occupancy value equal to or more than said second threshold.
Claim 21
Dependent Claim 68 words
The switch control method according to claim 20, wherein said first step includes outputting a transmission stop signal corresponding to said output port buffer when said output port buffer has - an occupancy value equal to or more than said second threshold and thereafter, outputs any one of said transmission restart signal, said transmission stop signal, and said transmission control signal corresponding to each output port buffer again.
Claim 22
Dependent Claim 56 words
The switch control method according to claim 20, wherein said first step includes outputting again any one of said transmission restart signal, said transmission stop signal, and said transmission control signal corresponding to each output port buffer when not one of said output buffers has an occupancy value equal to or more than said second threshold.
Claim 23
Dependent Claim 50 words
The switch control method according to claim 19, wherein said second step includes stopping the transmission of said ATM cells when said transmission stop signal is input and controls the transmission of an ATM cell next located in said list in accordance with a signal obtained from said first step.
Claim 24
Dependent Claim 59 words
The switch control method according to claim 19, wherein said second step decides that a case in which said transmission restart signal, said transmission stop signal, or said transmission control signal is not input is an error and controls the transmission of the next ATM cell in said list in accordance with a signal obtained from said first step.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Maintenance schedule is calculated for granted US utility patents.

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag