Claims Analysis
Total Claims: 21
Claim 1
Independent Claim
109 words
1 . A method of completion of a well, comprising: attaching at least one auxiliary conduit or cable to a downhole assembly; providing an upper connection to said conduit or cable; running in said downhole assembly with said cable or conduit to a desired location in the well; tagging into said downhole assembly and said upper connection of said conduit or cable downhole on at least one subsequent trip into the well with a tubular having at least one auxiliary cable or conduit extending along its length from the surface; communicating through said auxiliary cable or conduit between the surface and the downhole assembly on a real time basis.
Claim 2
Dependent Claim
109 words
1 . A method of completion of a well, comprising: attaching at least one auxiliary conduit or cable to a downhole assembly; providing an upper connection to said conduit or cable; running in said downhole assembly with said cable or conduit to a desired location in the well; tagging into said downhole assembly and said upper connection of said conduit or cable downhole on at least one subsequent trip into the well with a tubular having at least one auxiliary cable or conduit extending along its length from the surface; communicating through said auxiliary cable or conduit between the surface and the downhole assembly on a real time basis.
Claim 3
Dependent Claim
67 words
2 . The method of claim 1 , further comprising: tagging into said downhole assembly on a subsequent trip with production tubing having at least one auxiliary cable or conduit which is also connectable to said upper connection of said cable or conduit on the downhole assembly; communicating during production through auxiliary cable or conduit between the surface and the downhole assembly on a real time basis.
Claim 4
Dependent Claim
37 words
3 . The method of claim 1 , further comprising: plugging said upper connection during said running in of the downhole assembly and auxiliary cable or conduit; unplugging said upper connection with another trip into the well.
Claim 5
Dependent Claim
16 words
4 . The method of claim 1 , further comprising: performing said tagging in without rotation.
Claim 6
Dependent Claim
19 words
5 . The method of claim 4 , further comprising: selectively locking said connections resulting from said tagging in.
Claim 7
Dependent Claim
38 words
6 . The method of claim 1 , further comprising: configuring said auxiliary conduit or cable adjacent said downhole assembly in a manor which permits monitoring or altering adjacent well conditions or the functioning of the downhole assembly.
Claim 8
Dependent Claim
33 words
7 . The method of claim 6 , further comprising: using a gravel pack screen and packer for said downhole assembly extending said cable or conduit through said packer to said upper connection.
Claim 9
Dependent Claim
19 words
8 . The method of claim 7 , further comprising: delivering gravel through said at least one of conduits.
Claim 10
Dependent Claim
16 words
9 . The method of claim 1 , further comprising: using fiber optic as said cable.
Claim 11
Dependent Claim
21 words
10 . The method of claim 9 , further comprising: using said fiber optic to measure strain on said downhole assembly.
Claim 12
Dependent Claim
26 words
11 . The method of claim 1 , further comprising: using said auxiliary cable or conduit to operate at least a portion of said downhole assembly.
Claim 13
Dependent Claim
26 words
12 . The method of claim 7 , further comprising: running in an outerjacket, assembled over said cable or conduit, together with said screen and packer.
Claim 14
Dependent Claim
33 words
13 . The method of claim 7 , further comprising: running in at least one fiber optic cable on said screen; using said fiber optic to determine fluid conditions flowing to said screen.
Claim 15
Dependent Claim
27 words
14 . The method of claim 13 , further comprising: providing a winding inlet channel for inflow to said screen; locating said fiber optic in said channel.
Claim 16
Dependent Claim
69 words
15 . The method of claim 1 , further comprising: running said auxiliary conduit or cable in a U-shaped path so as to provide a pair of upper connections; extending said U-shaped path to the surface as a result of said tagging, an auxiliary conductor or cable attached to a tubular run in from the surface, into each of said upper connections on a subsequent trip into the wellbore.
Claim 17
Dependent Claim
31 words
16 . The method of claim 1 , further comprising: running at least one cable and at least one conduit auxiliary to the downhole assembly; securing said cable to said conduit.
Claim 18
Dependent Claim
26 words
17 . The method of claim 1 , further comprising: providing an external through on said downhole assembly; mounting a fiber optic cable in said through.
Claim 19
Dependent Claim
30 words
18 . The method of claim 17 , further comprising: securely mounting said fiber optic cable to said through to allow real time sensing of strain on the downhole assembly.
Claim 20
Dependent Claim
18 words
19 . The method of claim 1 , further comprising: mounting a fiber optic cable inside said conduit.
Claim 21
Dependent Claim
53 words
20 . The method of claim 7 , further comprising: using a fiber optic cable to monitor the compaction of gravel per unit length of screen; using a plurality of conduits for gravel deposition at different locations of said screen; sensing downhole conditions during production through said screen using said fiber optic cable.