Abstract

Abstract A technique for providing auxiliary conduits in multi-trip completions is disclosed. The technique has particular applicability to liner mounted screens which are to be gravel packed. In the preferred embodiment, a protective shroud is run with the gravel pack screens with the auxiliary conduits disposed in between. The auxiliary conduits terminate in a quick connection at a liner top packer. The gravel packing equipment can optionally be secured in a flow relationship to the auxiliary conduits so as to control the gravel packing operation. Subsequent to the removal of the specialized equipment, the production tubing can be run with an auxiliary conduit or conduits for connection down hole to the auxiliary conduits coming from the liner top packer for a sealing connection. Thereafter, during production various data on the well can be obtained in real time despite the multiple trips necessary to accomplish completion. The various completion and/or production activities can also be accomplished using the auxiliary conduits such as actuation of down hole flow control devices, chemical injection, pressure measurement, distributed temperature sensing through fiber optics, as well as other down hole parameters.

Inventors

  • 👤 Christian Bayne
  • 👤 Benn Voll
  • 👤 J. Broome
  • 👤 James Zachman
  • 👤 Graeme Falconer
  • 👤 Michael Norris
  • 👤 Edward Zisk
  • 👤 David Bilberry
  • 👤 Steve Hodges

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 07:35
CPC Classifications
E; E21; E21B; E21B17/00; E21B17/02; E21B17/023; E21B17/026; E21B17/003; E21B43/00; E21B43/02; E21B43/08; E21B47/00; E21B47/12

Claims Analysis

Total Claims: 21
Claim 1
Independent Claim 109 words
1 . A method of completion of a well, comprising: attaching at least one auxiliary conduit or cable to a downhole assembly; providing an upper connection to said conduit or cable; running in said downhole assembly with said cable or conduit to a desired location in the well; tagging into said downhole assembly and said upper connection of said conduit or cable downhole on at least one subsequent trip into the well with a tubular having at least one auxiliary cable or conduit extending along its length from the surface; communicating through said auxiliary cable or conduit between the surface and the downhole assembly on a real time basis.
Claim 2
Dependent Claim 109 words
1 . A method of completion of a well, comprising: attaching at least one auxiliary conduit or cable to a downhole assembly; providing an upper connection to said conduit or cable; running in said downhole assembly with said cable or conduit to a desired location in the well; tagging into said downhole assembly and said upper connection of said conduit or cable downhole on at least one subsequent trip into the well with a tubular having at least one auxiliary cable or conduit extending along its length from the surface; communicating through said auxiliary cable or conduit between the surface and the downhole assembly on a real time basis.
Claim 3
Dependent Claim 67 words
2 . The method of claim 1 , further comprising: tagging into said downhole assembly on a subsequent trip with production tubing having at least one auxiliary cable or conduit which is also connectable to said upper connection of said cable or conduit on the downhole assembly; communicating during production through auxiliary cable or conduit between the surface and the downhole assembly on a real time basis.
Claim 4
Dependent Claim 37 words
3 . The method of claim 1 , further comprising: plugging said upper connection during said running in of the downhole assembly and auxiliary cable or conduit; unplugging said upper connection with another trip into the well.
Claim 5
Dependent Claim 16 words
4 . The method of claim 1 , further comprising: performing said tagging in without rotation.
Claim 6
Dependent Claim 19 words
5 . The method of claim 4 , further comprising: selectively locking said connections resulting from said tagging in.
Claim 7
Dependent Claim 38 words
6 . The method of claim 1 , further comprising: configuring said auxiliary conduit or cable adjacent said downhole assembly in a manor which permits monitoring or altering adjacent well conditions or the functioning of the downhole assembly.
Claim 8
Dependent Claim 33 words
7 . The method of claim 6 , further comprising: using a gravel pack screen and packer for said downhole assembly extending said cable or conduit through said packer to said upper connection.
Claim 9
Dependent Claim 19 words
8 . The method of claim 7 , further comprising: delivering gravel through said at least one of conduits.
Claim 10
Dependent Claim 16 words
9 . The method of claim 1 , further comprising: using fiber optic as said cable.
Claim 11
Dependent Claim 21 words
10 . The method of claim 9 , further comprising: using said fiber optic to measure strain on said downhole assembly.
Claim 12
Dependent Claim 26 words
11 . The method of claim 1 , further comprising: using said auxiliary cable or conduit to operate at least a portion of said downhole assembly.
Claim 13
Dependent Claim 26 words
12 . The method of claim 7 , further comprising: running in an outerjacket, assembled over said cable or conduit, together with said screen and packer.
Claim 14
Dependent Claim 33 words
13 . The method of claim 7 , further comprising: running in at least one fiber optic cable on said screen; using said fiber optic to determine fluid conditions flowing to said screen.
Claim 15
Dependent Claim 27 words
14 . The method of claim 13 , further comprising: providing a winding inlet channel for inflow to said screen; locating said fiber optic in said channel.
Claim 16
Dependent Claim 69 words
15 . The method of claim 1 , further comprising: running said auxiliary conduit or cable in a U-shaped path so as to provide a pair of upper connections; extending said U-shaped path to the surface as a result of said tagging, an auxiliary conductor or cable attached to a tubular run in from the surface, into each of said upper connections on a subsequent trip into the wellbore.
Claim 17
Dependent Claim 31 words
16 . The method of claim 1 , further comprising: running at least one cable and at least one conduit auxiliary to the downhole assembly; securing said cable to said conduit.
Claim 18
Dependent Claim 26 words
17 . The method of claim 1 , further comprising: providing an external through on said downhole assembly; mounting a fiber optic cable in said through.
Claim 19
Dependent Claim 30 words
18 . The method of claim 17 , further comprising: securely mounting said fiber optic cable to said through to allow real time sensing of strain on the downhole assembly.
Claim 20
Dependent Claim 18 words
19 . The method of claim 1 , further comprising: mounting a fiber optic cable inside said conduit.
Claim 21
Dependent Claim 53 words
20 . The method of claim 7 , further comprising: using a fiber optic cable to monitor the compaction of gravel per unit length of screen; using a plurality of conduits for gravel deposition at different locations of said screen; sensing downhole conditions during production through said screen using said fiber optic cable.

USPTO Annuity & Maintenance Windows