← Back to Patent Explorer
US2630405A Expired / Lapsed US ⏱️ 0.0 years remaining

Fuel and process for preparaing same

Assignee: Shell Development Co
•
Filing: 1948-04-30
•
Granted: 1953-03-03
•
Expires: 1968-04-30
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Lloyd C Fetterly

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-07 23:04
CPC Classifications
C; C10; C10L; C10L1/00

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 61 words
THE PROCESS FOR THE PREPARATION OF AN ENGINE FUEL HAVING IMPROVED STARTABILITY, HIGH ENDPOINT AND LOW POUR POINT COMPRISING SEPARATELY TREATING TWO PETROLEUM DISTILLATES, THE FIRST OF WHICH HAS A BOILING RANGE WITHIN THE LIMITS 275*-425* F., AND THE SECOND OF WHICH HAS A BOILING RANGE WITHIN THE LIMITS 415*-660* F., WITH AT LEAST ONE COMPLEX-FORMING AGENT HAVING THE GENERAL CONFIGURATION
Claim 2
Dependent Claim 45 words
A NOVEL ENGING FUEL HAVING IMPROVED STARTABILITY, HIGH END-POINT AND LOW POUR POINT CONSISTING ESSENTIALLY OF 5-15% OF SUBSTANTIALLY NORMAL HYDROCARBONS HAVING A BOILING RANGE WITHIN THE LIMITS 275*-425* F., AND 85-95% OF SUBSTANTIALLY NON-NORMAL HYDROCARBONS HAVING A BOILING RANGE WITHIN THE LIMITS 415*-660* F.

References Cited (Backward Citations)

US2025409A Cited
US2090007A Cited
US2049062A Cited
US2096218A Cited
US2361054A Cited
US2312360A Cited
US2361080A Cited
US2366490A Cited
US2403267A Cited
US2433943A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1956-03-02 1956-09-01 1957-03-03 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1960-03-02 1960-09-01 1961-03-03 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1964-03-02 1964-09-01 1965-03-03 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag