US2665977A Expired / Lapsed US ⏱️ 0.0 years remaining

Coke breeze bonded by portland cement

Assignee: Motors Liquidation Co
•
Filing: 1949-01-29
•
Granted: 1954-01-12
•
Expires: 1969-01-29
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Jr William A Engelhart

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-06 20:30
CPC Classifications
C; C10; C10L; C10L5/00; C10L5/02; C10L5/06; C10L5/10; C10L5/12

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 173 words
THE METHOD OF FORMING A FUEL BRICK ADAPTED FOR USE AS A FUNEL IN CUPOLA AND OTHER MELTING PROCESSES WHICH COMPRISES THOROUGHLY MIXING COKE BREEZE, PORTLAND CEMENT AND WATER IN THE FOLLOWING PROPORTIONS: ONE CUBIC YARD COKE BREEZE, 1.1 TO 2 CUBIC FEET PORTLAND CEMENT, AND 8 TO 16 GALLONS OF WATER, FILLING AN OPEN TOP MOLD WITH SAID MIXED COKE BREEZE, PORTLAND CEMENT AND WATER, RAPIDLY VIBRATING THE MOLD FOR FROM 10 TO 15 SECONDS, REMOVING THE FORMED GREEN BRICK FROM THE MOLD AND ALLOWING THE BRICK TO TAKE AN INITIAL SET FOR FROM 2 TO 3 HOURS, THEN GRADUALLY APPLYING STEAM TO A CLOSED CHAMBER IN WHICH THE BRICK IS PLACED UNTIL THE STREAM PRESSURE REACHES 90 TO 110 POUNDS PER SQUARE INCH, THE RATE OF APPLICATION OF STEAM BEING SUCH THAT THE STATED PRESSURE IS REACHED IN A PERIOD OF FROM TWO TO THREE HOURS, THEN HOLDING AT SAID PRESSURE FOR APPROXIMATELY 4 HOURS AND THEN REDUCING THE PRESSURE TO ATMOSPHERIC IN A TIME OF ABOUT 1/2 TO ONE HOUR.
Claim 2
Independent Claim 173 words
THE METHOD OF FORMING A FUEL BRICK ADAPTED FOR USE AS A FUNEL IN CUPOLA AND OTHER MELTING PROCESSES WHICH COMPRISES THOROUGHLY MIXING COKE BREEZE, PORTLAND CEMENT AND WATER IN THE FOLLOWING PROPORTIONS: ONE CUBIC YARD COKE BREEZE, 1.1 TO 2 CUBIC FEET PORTLAND CEMENT, AND 8 TO 16 GALLONS OF WATER, FILLING AN OPEN TOP MOLD WITH SAID MIXED COKE BREEZE, PORTLAND CEMENT AND WATER, RAPIDLY VIBRATING THE MOLD FOR FROM 10 TO 15 SECONDS, REMOVING THE FORMED GREEN BRICK FROM THE MOLD AND ALLOWING THE BRICK TO TAKE AN INITIAL SET FOR FROM 2 TO 3 HOURS, THEN GRADUALLY APPLYING STEAM TO A CLOSED CHAMBER IN WHICH THE BRICK IS PLACED UNTIL THE STREAM PRESSURE REACHES 90 TO 110 POUNDS PER SQUARE INCH, THE RATE OF APPLICATION OF STEAM BEING SUCH THAT THE STATED PRESSURE IS REACHED IN A PERIOD OF FROM TWO TO THREE HOURS, THEN HOLDING AT SAID PRESSURE FOR APPROXIMATELY 4 HOURS AND THEN REDUCING THE PRESSURE TO ATMOSPHERIC IN A TIME OF ABOUT 1/2 TO ONE HOUR.

References Cited (Backward Citations)

US190724A Cited
US824680A Cited
US830953A Cited
US1075135A Cited
US1236447A Cited
US1453746A Cited
US1770627A Cited
US2068793A Cited
GB430233A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1957-01-11 1957-07-13 1958-01-12 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1961-01-11 1961-07-13 1962-01-12 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1965-01-11 1965-07-13 1966-01-12 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag