US2665977A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Coke breeze bonded by portland cement
Assignee: Motors Liquidation Co
•
Filing: 1949-01-29
•
Granted: 1954-01-12
•
Expires: 1969-01-29
Abstract
No abstract record available.
Inventors
- 👤 Jr William A Engelhart
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-06 20:30
CPC Classifications
C; C10; C10L; C10L5/00; C10L5/02; C10L5/06; C10L5/10; C10L5/12
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
173 words
THE METHOD OF FORMING A FUEL BRICK ADAPTED FOR USE AS A FUNEL IN CUPOLA AND OTHER MELTING PROCESSES WHICH COMPRISES THOROUGHLY MIXING COKE BREEZE, PORTLAND CEMENT AND WATER IN THE FOLLOWING PROPORTIONS: ONE CUBIC YARD COKE BREEZE, 1.1 TO 2 CUBIC FEET PORTLAND CEMENT, AND 8 TO 16 GALLONS OF WATER, FILLING AN OPEN TOP MOLD WITH SAID MIXED COKE BREEZE, PORTLAND CEMENT AND WATER, RAPIDLY VIBRATING THE MOLD FOR FROM 10 TO 15 SECONDS, REMOVING THE FORMED GREEN BRICK FROM THE MOLD AND ALLOWING THE BRICK TO TAKE AN INITIAL SET FOR FROM 2 TO 3 HOURS, THEN GRADUALLY APPLYING STEAM TO A CLOSED CHAMBER IN WHICH THE BRICK IS PLACED UNTIL THE STREAM PRESSURE REACHES 90 TO 110 POUNDS PER SQUARE INCH, THE RATE OF APPLICATION OF STEAM BEING SUCH THAT THE STATED PRESSURE IS REACHED IN A PERIOD OF FROM TWO TO THREE HOURS, THEN HOLDING AT SAID PRESSURE FOR APPROXIMATELY 4 HOURS AND THEN REDUCING THE PRESSURE TO ATMOSPHERIC IN A TIME OF ABOUT 1/2 TO ONE HOUR.
Claim 2
Independent Claim
173 words
THE METHOD OF FORMING A FUEL BRICK ADAPTED FOR USE AS A FUNEL IN CUPOLA AND OTHER MELTING PROCESSES WHICH COMPRISES THOROUGHLY MIXING COKE BREEZE, PORTLAND CEMENT AND WATER IN THE FOLLOWING PROPORTIONS: ONE CUBIC YARD COKE BREEZE, 1.1 TO 2 CUBIC FEET PORTLAND CEMENT, AND 8 TO 16 GALLONS OF WATER, FILLING AN OPEN TOP MOLD WITH SAID MIXED COKE BREEZE, PORTLAND CEMENT AND WATER, RAPIDLY VIBRATING THE MOLD FOR FROM 10 TO 15 SECONDS, REMOVING THE FORMED GREEN BRICK FROM THE MOLD AND ALLOWING THE BRICK TO TAKE AN INITIAL SET FOR FROM 2 TO 3 HOURS, THEN GRADUALLY APPLYING STEAM TO A CLOSED CHAMBER IN WHICH THE BRICK IS PLACED UNTIL THE STREAM PRESSURE REACHES 90 TO 110 POUNDS PER SQUARE INCH, THE RATE OF APPLICATION OF STEAM BEING SUCH THAT THE STATED PRESSURE IS REACHED IN A PERIOD OF FROM TWO TO THREE HOURS, THEN HOLDING AT SAID PRESSURE FOR APPROXIMATELY 4 HOURS AND THEN REDUCING THE PRESSURE TO ATMOSPHERIC IN A TIME OF ABOUT 1/2 TO ONE HOUR.
References Cited (Backward Citations)
US190724A
Cited
US824680A
Cited
US830953A
Cited
US1075135A
Cited
US1236447A
Cited
US1453746A
Cited
US1770627A
Cited
US2068793A
Cited
GB430233A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1957-01-11 | 1957-07-13 | 1958-01-12 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1961-01-11 | 1961-07-13 | 1962-01-12 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1965-01-11 | 1965-07-13 | 1966-01-12 | $7700.00 | Window Closed / Lapsed |