← Back to Patent Explorer
US3226817A Expired / Lapsed US ⏱️ 0.0 years remaining

Continuous method for fabricating tubing

Assignee: INTERNAT NIKOH CORP
•
Filing: 1963-04-17
•
Granted: 1966-01-04
•
Expires: 1983-04-17
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Edward J Simborg
  • 👤 John A Henricks

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-07 10:02
CPC Classifications
B; B21; B21C; B21C37/00; B21C37/06; B21C37/08; B21C37/09; B21C37/30; Y; Y10; Y10T; Y10T29/00; Y10T29/49; Y10T29/49826; Y10T29/49828; Y10T29/49829; Y10T29/49888; Y10T29/53; Y10T29/53313; Y10T29/53348; Y10T29/53357

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 200 words
THE METHOD OF CONTINUOUSLY FABRICATING GALVANIZED STEEL TUBING WHICH COMPRISES THE STEPS OF: INTERCONNECTING THE LEADING EDGE OF ONE END OF A FLAT STEEL STOCK WITH THE TRAILING EDGE OF ONE END OF ANOTHER FLAT STEEL STOCK BY PASSAGE OF THE LATTER THROUGH A LOOPING STORAGE SYSTEM; CHEMICALLY CLEANING AND DEGREASING THE STEEL STOCK WITH A SYNTHETIC DETERGENT SYSTEM COMPRISING A BORAX AND POLYPHOSPHATE BASE; FORMING THE CONTINUOUS LENGTH OF FLAT STOCK THUS PRODUCED INTO A TUBULAR CONFIGURATION; WELDING THE ABUTTING EDGES OF THE TUBULAR CONFIGURATION INTO A LONGITUDINAL SEAM OF FORMED TUBING; CLEANING AND FLUXING THE EXTERIOR SURFACE OF THE FORMED TUBING, THE SAID CLEANING INCLUDING THE STEP OF ABRASIVE IMPACTION OF THE TUBING; PREHEATING THE FORMED TUBING TO A RANGE OF FROM 500* F. TO 800*F. BY PASSAGE THEREOF INTERIORLY OF AN ELECTRICALLY INSULATED INDUCTION HEATING COIL; APPLYING A PREDETERMINED THICKNESS OF MOLTEN ZINC TO THE FORMED TUBING BY PASSAGE OF THE TUBING THROUGH A PREDETERMINED LEVEL OF MOLTEN ZINC CONTAINING 0.2% TO 0.3% ALUMINUM AND BY REMOVING EXCESS MOLTEN ZINC FROM THE COATED TUBING BY COUNTERCURRENT GASEOUS BLASTS; COOLING THE COATED TUBING; FORMING A PROTECTIVE ZINC CHROMATE FINISH ON THE COATED TUBING; AND SIZING THE COATED TUBING.
Claim 2
Independent Claim 200 words
THE METHOD OF CONTINUOUSLY FABRICATING GALVANIZED STEEL TUBING WHICH COMPRISES THE STEPS OF: INTERCONNECTING THE LEADING EDGE OF ONE END OF A FLAT STEEL STOCK WITH THE TRAILING EDGE OF ONE END OF ANOTHER FLAT STEEL STOCK BY PASSAGE OF THE LATTER THROUGH A LOOPING STORAGE SYSTEM; CHEMICALLY CLEANING AND DEGREASING THE STEEL STOCK WITH A SYNTHETIC DETERGENT SYSTEM COMPRISING A BORAX AND POLYPHOSPHATE BASE; FORMING THE CONTINUOUS LENGTH OF FLAT STOCK THUS PRODUCED INTO A TUBULAR CONFIGURATION; WELDING THE ABUTTING EDGES OF THE TUBULAR CONFIGURATION INTO A LONGITUDINAL SEAM OF FORMED TUBING; CLEANING AND FLUXING THE EXTERIOR SURFACE OF THE FORMED TUBING, THE SAID CLEANING INCLUDING THE STEP OF ABRASIVE IMPACTION OF THE TUBING; PREHEATING THE FORMED TUBING TO A RANGE OF FROM 500* F. TO 800*F. BY PASSAGE THEREOF INTERIORLY OF AN ELECTRICALLY INSULATED INDUCTION HEATING COIL; APPLYING A PREDETERMINED THICKNESS OF MOLTEN ZINC TO THE FORMED TUBING BY PASSAGE OF THE TUBING THROUGH A PREDETERMINED LEVEL OF MOLTEN ZINC CONTAINING 0.2% TO 0.3% ALUMINUM AND BY REMOVING EXCESS MOLTEN ZINC FROM THE COATED TUBING BY COUNTERCURRENT GASEOUS BLASTS; COOLING THE COATED TUBING; FORMING A PROTECTIVE ZINC CHROMATE FINISH ON THE COATED TUBING; AND SIZING THE COATED TUBING.

References Cited (Backward Citations)

US1012048A Cited
US1124727A Cited
US1687309A Cited
US2011135A Cited
US2197622A Cited
US3122114A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1969-01-03 1969-07-05 1970-01-04 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1973-01-03 1973-07-05 1974-01-04 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1977-01-03 1977-07-05 1978-01-04 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag