US3331204A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Standby afterburner operation system
Assignee: General Electric Co
•
Filing: 1966-02-07
•
Granted: 1967-07-18
•
Expires: 1986-02-07
Abstract
No abstract record available.
Inventors
- 👤 Pender L Love
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-30 06:10
CPC Classifications
F; F02; F02K; F02K1/00; F02K1/06; F02K1/15; F02K1/16; F02K1/17; F02K3/00; F02K3/08; F02K3/10
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
197 words
IN A TURBOJET ENGINE WHICH IS TO BE CONTROLLED BY A THROTTLE LEVER FOR AIRCRAFT PROPULSION, SAID ENGINE COMPRISING A MAIN COMBUSTOR FOR PRODUCING PRIMARY THRUST AND AN AFTERBURNER FOR PRODUCING AUGMENTED THRUST, MEANS FOR SCHEDULING FLOW OF FUEL TO SAID COMBUSTOR AS A FUNCTION OF LEVER MOVEMET IN A GIVEN DIRECTION TO INCREASE THE RATE OF ENGINE OPERATION TO A MAXIMUM VALUE IN PROVIDING PRIMARY THRUST FOR THE AIRCRAFT, MEANS FOR SCHEDULING FLOW OF FUEL TO SAID AFTERBURNER IN RESPONSE TO MOVEMENT OF SAID LEVER BEYOND A POSITION SCHEDULING SUBSTANTIALLY MAXIMUM FUEL FLOW TO SAID COMBUSTOR, MEANS FOR ACTUATING SAID AFTERBURNER SCHEDULING MEANS IN RESPONSE TO OPERATING OF SAID ENGINE AT APPROXIMATELY A MAXIMUM RATE, THE IMPROVEMENT WHICH CONSISTS OF MEANS FOR SELECTIVELY ACTUATING SAID AFTERBURNER SCHEDULING MEANS FOR DELIVERY OF FUEL TO SAID AFTERBURNER AT A RELATIVELY LOW RATE WHEN THE THROTTLE LEVER IS WITHIN GIVEN LIMITS SUBSTANTIALLY BELOW ITS MAXIMUM SCHEDULING POSITION WHEN THE RATE OF SAID ENGINE OPERATION IS BELOW A MAXIMUM RATE, WHEREBY SAID AFTERBURNER MAY BE PLACED IN A STANDBY STATE TO RAPIDLY PRODUCE MAXIMUM AUGMENTED THRUST WHEN SAID THROTTLE IS ADVANCED AT AN EXTREME RATE TO APPROXIMATELY ITS HIGHEST POSITION.
Claim 2
Dependent Claim
197 words
IN A TURBOJET ENGINE WHICH IS TO BE CONTROLLED BY A THROTTLE LEVER FOR AIRCRAFT PROPULSION, SAID ENGINE COMPRISING A MAIN COMBUSTOR FOR PRODUCING PRIMARY THRUST AND AN AFTERBURNER FOR PRODUCING AUGMENTED THRUST, MEANS FOR SCHEDULING FLOW OF FUEL TO SAID COMBUSTOR AS A FUNCTION OF LEVER MOVEMET IN A GIVEN DIRECTION TO INCREASE THE RATE OF ENGINE OPERATION TO A MAXIMUM VALUE IN PROVIDING PRIMARY THRUST FOR THE AIRCRAFT, MEANS FOR SCHEDULING FLOW OF FUEL TO SAID AFTERBURNER IN RESPONSE TO MOVEMENT OF SAID LEVER BEYOND A POSITION SCHEDULING SUBSTANTIALLY MAXIMUM FUEL FLOW TO SAID COMBUSTOR, MEANS FOR ACTUATING SAID AFTERBURNER SCHEDULING MEANS IN RESPONSE TO OPERATING OF SAID ENGINE AT APPROXIMATELY A MAXIMUM RATE, THE IMPROVEMENT WHICH CONSISTS OF MEANS FOR SELECTIVELY ACTUATING SAID AFTERBURNER SCHEDULING MEANS FOR DELIVERY OF FUEL TO SAID AFTERBURNER AT A RELATIVELY LOW RATE WHEN THE THROTTLE LEVER IS WITHIN GIVEN LIMITS SUBSTANTIALLY BELOW ITS MAXIMUM SCHEDULING POSITION WHEN THE RATE OF SAID ENGINE OPERATION IS BELOW A MAXIMUM RATE, WHEREBY SAID AFTERBURNER MAY BE PLACED IN A STANDBY STATE TO RAPIDLY PRODUCE MAXIMUM AUGMENTED THRUST WHEN SAID THROTTLE IS ADVANCED AT AN EXTREME RATE TO APPROXIMATELY ITS HIGHEST POSITION.
References Cited (Backward Citations)
US2774215A
Cited
US2737016A
Cited
US2737775A
Cited
US2958186A
Cited
US3243955A
Cited
US3060683A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1970-07-17 | 1971-01-16 | 1971-07-18 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1974-07-17 | 1975-01-16 | 1975-07-18 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1978-07-17 | 1979-01-16 | 1979-07-18 | $7700.00 | Window Closed / Lapsed |