US3358764A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method of fracturing subterranean strata
Assignee: Phillips Petroleum Co
•
Filing: 1965-07-16
•
Granted: 1967-12-19
•
Expires: 1985-07-16
Abstract
No abstract record available.
Inventors
- 👤 Harry W Parker
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-09 00:48
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/25; E21B43/26; E21B43/267
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
126 words
A PROCESS FOR FRACTURING AND PROPPING A SUBTERRANEAN STRATUM PENETRATED BY A WELL WHICH COMPRISES THE STEPS OF: (1) INJECTING A FRACTURING FLUID THRU SAID WELL INTO A SELECTED LEVEL OF SAID STRATUM AT SUFFICIENT PRESSURE TO FRACTURE AND RAISE THE OVERBURDEN; (2) DEPOSITING IN ALTERNATE CIRCUMFERENTIALLY SPACED AREAS OF THE RESULTING FRACTURE A RELATIVELY NONFLUIDIZABLE SOLID PARTICULATE PROPPING AGENT IN A CONCENTRATION SUPPORTING THE OVERBURDEN; (3) SEQUENTIALLY DEPOSITING IN INTERVENING, AREAS A READILY FLUIDIZABLE SOLID PARTICULATE PROPPING AGENT; AND (4) THEREAFTER, FLUIDIZING THE PROPPING AGENT OF STEP (3) AND DESTROYING THE PROPPING NATURE THEREOF SO AS TO LEAVE HIGHLY PERMEABLE FLOW PATHS FORMERLY OCCUPIED BY THE FLUIDIZABLE AGENT ALTERNATELY SPACED AROUND SAID WELL WITH RESPECT TO THE PROPPED AREAS RESULTING FROM STEPS (1) AND (2).
Claim 2
Dependent Claim
126 words
A PROCESS FOR FRACTURING AND PROPPING A SUBTERRANEAN STRATUM PENETRATED BY A WELL WHICH COMPRISES THE STEPS OF: (1) INJECTING A FRACTURING FLUID THRU SAID WELL INTO A SELECTED LEVEL OF SAID STRATUM AT SUFFICIENT PRESSURE TO FRACTURE AND RAISE THE OVERBURDEN; (2) DEPOSITING IN ALTERNATE CIRCUMFERENTIALLY SPACED AREAS OF THE RESULTING FRACTURE A RELATIVELY NONFLUIDIZABLE SOLID PARTICULATE PROPPING AGENT IN A CONCENTRATION SUPPORTING THE OVERBURDEN; (3) SEQUENTIALLY DEPOSITING IN INTERVENING, AREAS A READILY FLUIDIZABLE SOLID PARTICULATE PROPPING AGENT; AND (4) THEREAFTER, FLUIDIZING THE PROPPING AGENT OF STEP (3) AND DESTROYING THE PROPPING NATURE THEREOF SO AS TO LEAVE HIGHLY PERMEABLE FLOW PATHS FORMERLY OCCUPIED BY THE FLUIDIZABLE AGENT ALTERNATELY SPACED AROUND SAID WELL WITH RESPECT TO THE PROPPED AREAS RESULTING FROM STEPS (1) AND (2).
References Cited (Backward Citations)
US3259190A
Cited
US3181612A
Cited
US3235007A
Cited
US3241613A
Cited
US3254717A
Cited
US3237693A
Cited
US3266573A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1970-12-18 | 1971-06-19 | 1971-12-19 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1974-12-18 | 1975-06-19 | 1975-12-19 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1978-12-18 | 1979-06-19 | 1979-12-19 | $7700.00 | Window Closed / Lapsed |