← Back to Patent Explorer
US3622656A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of manufacturing reinforced wall structure

Assignee: General Dynamics Corp
•
Filing: 1969-05-26
•
Granted: 1971-11-23
•
Expires: 1989-05-26
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A large buoy construction of relatively thin wall composite material, which walls are integrally formed and interconnected by a reinforcing matrix frame comprising reinforcing members sandwiched between layers of screens, to which the cement-type material can be applied by use of power equipment in a rapid application and thorough penetration into the matrix to accomplish onsite formless molding of integral, unitary structures having complex shapes and junctions.

Inventors

  • 👤 David B Dewey Jr
  • 👤 Norman W Schofield

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 23:28
CPC Classifications
B; B63; B63B; B63B1/00; B63B1/02; B63B1/04; B63B1/041; B63B22/00; B63B22/16; B63B5/00; B63B5/14; B63B5/16; B63B59/00; B63B59/02; Y; Y10; Y10S; Y10S425/00; Y10S425/121

Claims Analysis

Total Claims: 4
Claim 1
Independent Claim 37 words
The method as claimed in claim 1 including the step of, overlapping adjacent edges of adjacent layers of said screen material at intersections of said first reinforcing bars and said reinforcing member, and said second reinforcing bars.
Claim 2
Dependent Claim 150 words
The method as claimed in claim 1 including the steps of, rigidly securing a second reinforcing member to the upper ends of said plurality of second spaced reinforcing bars in said wall frame, laying a plurality of third spaced reinforcing bars on said second reinforcing member in intersecting relationship, placing third layers of relatively open screen material on the upper side of said third reinforcing bars and second layers of relatively dense screen material on the bottom side of said third reinforcing bars, projecting a cement mixture in a steam through said third layer of relatively open screen material and against said second layers of relatively dense screen material, projecting said cement mixture in a pattern in sufficient volume to fill the spaces in said third layers of relatively open screen material and said second layers of relatively dense screen material and the volume therebetween, and curing said cement mixture.
Claim 3
Dependent Claim 43 words
The method as claimed in claim 1 in which, said reinforcing member comprises a beam with holes therethrough along the length thereof of for receiving ones of said first reinforcing bars, and others of said first reinforcing bars aRe positioned below said beam.
Claim 4
Dependent Claim 54 words
The method as claimed in claim 1 in which, said plurality of first spaced reinforcing bars comprises a matrix of spaced, intersecting reinforcing bars, and said reinforcing member comprises at least two aligned and adjacently positioned reinforcing bars with said second spaced reinforcing bars being rigidly secured to one of said two aligned bars.

References Cited (Backward Citations)

US1324027A Cited
US1281408A Cited
US2187223A Cited
US2301760A Cited
US3402522A Cited
US3461639A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1974-11-22 1975-05-24 1975-11-23 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1978-11-22 1979-05-24 1979-11-23 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1982-11-22 1983-05-24 1983-11-23 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag