Abstract

Abstract A method for strengthening of carbon and low alloy steels and steels produced thereby wherein a carbon or low alloy steel is partially austenitized to produce a ferrite-austenite mixture, the resulting ferrite-austenite mixture is quenched to an intermediate temperature to render the austenite metastable, with the quenching being at a rate sufficient to avoid transformation of the austenite to ferrite and pearlite, and working the quenched steel at a temperature up to the maximum temperature at which bainite can exist whereby the ferrite-austenite mixture is converted to a ferrite-bainite mixture having high levels of machinability, strength and toughness.

Inventors

  • 👤 Michael J. Rowney

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-23 23:32
CPC Classifications
C; C21; C21D; C21D8/00

Claims Analysis

Total Claims: 58
Claim 1
Independent Claim 98 words
A method for the strengthening of carbon and low alloy steels comprising (1) partially austenitizing a carbon or low alloy steel to produce a ferrite-austenite mixture, (2) quenching the partially austenitized steel to an intermediate temperature above the M s temperature for the steel at a rate sufficient to avoid transformation of the austenite to ferrite and pearlite, and (3) working the quenched steel at a temperature ranging from ambient temperature up to a temperature at which bainite can exist whereby the ferrite-austenite mixture is converted to a ferrite-bainite mixture having high levels of machinability, strength and toughness.
Claim 2
Independent Claim 98 words
A method for the strengthening of carbon and low alloy steels comprising (1) partially austenitizing a carbon or low alloy steel to produce a ferrite-austenite mixture, (2) quenching the partially austenitized steel to an intermediate temperature above the M s temperature for the steel at a rate sufficient to avoid transformation of the austenite to ferrite and pearlite, and (3) working the quenched steel at a temperature ranging from ambient temperature up to a temperature at which bainite can exist whereby the ferrite-austenite mixture is converted to a ferrite-bainite mixture having high levels of machinability, strength and toughness.
Claim 3
Dependent Claim 17 words
A method as defined in claim 1 wherein the steel contains at least 10% by volume ferrite.
Claim 4
Dependent Claim 15 words
A method as defined in claim 1 wherein the steel is a hypoeutectoid carbon steel.
Claim 5
Dependent Claim 20 words
A method as defined in claim 1 wherein the steel is a carbon steel containing from 0.1 to 0.7% carbon.
Claim 6
Dependent Claim 24 words
A method as defined in claim 1 wherein the steel is a low alloy steel containing less than 5% total alloying elements by weight.
Claim 7
Dependent Claim 20 words
A method as defined in claim 1 wherein the steel partially austenitized is a steel formed of ferrite and pearlite.
Claim 8
Dependent Claim 16 words
A method as defined in claim 1 wherein the steel is an AISI/SAE Grade 1144 steel.
Claim 9
Dependent Claim 23 words
A method as defined in claim 1 wherein the steel is partially austenitized at a temperature ranging from about 1340° to 1680° F.
Claim 10
Dependent Claim 24 words
A method as defined in claim 1 wherein the steel is partially austenitized by rapid heating by passing an electric current through the steel.
Claim 11
Dependent Claim 20 words
A method as defined in claim 1 wherein the steel is partially austenitized by heating in less than 10 minutes.
Claim 12
Dependent Claim 49 words
A method as defined in claim 9 wherein the electric current is passed through the steel to heat the steel until the increase in temperature of the steel ceases, and then the amount of current passed through the steel is adjusted to maintain the steel at a constant temperature.
Claim 13
Dependent Claim 58 words
A method as defined in claim 9 wherein the electric current is passed through the steel until the increase in temperature of the steel ceases, and then the flow of electric current is stopped after a pre-determined temperature is reached and a pre-determined time has passed from the time when the increase in temperature of the steel ceased.
Claim 14
Dependent Claim 13 words
A carbon or low alloy steel produced by the method of claim 1.
Claim 15
Dependent Claim 21 words
A steel as defined in claim 13 wherein the steel is a carbon steel containing carbon up to 0.7% by weight.
Claim 16
Dependent Claim 23 words
A steel as defined in claim 13 wherein the steel is a low alloy steel containing less than 5% by weight alloying elements.
Claim 17
Dependent Claim 25 words
A steel as defined in claim 15 wherein the alloying element is selected from the group consisting of chromium, molybdenum, nickel, manganese and combinations thereof.
Claim 18
Independent Claim 110 words
A method for the strengthening of carbon and low alloy steels comprising: (1) partially austenitizing a hypoeutectoid carbon steel or low alloy steel by rapid heating to produce a ferrite-austenite mixture, (2) quenching the partially austenitized steel to an intermediate temperature above the M s temperature for the steel at a rate sufficient to avoid transformation of the austenite to ferrite and pearlite, (3) working the quenched steel at a temperature ranging from ambient temperature up to a temperature at which bainite can exist, and (4) cooling the steel whereby the ferrite-austenite mixture is converted to a ferrite-bainite mixture, with such conversion being accelerated and extended during working and/or cooling.
Claim 19
Independent Claim 110 words
A method for the strengthening of carbon and low alloy steels comprising: (1) partially austenitizing a hypoeutectoid carbon steel or low alloy steel by rapid heating to produce a ferrite-austenite mixture, (2) quenching the partially austenitized steel to an intermediate temperature above the M s temperature for the steel at a rate sufficient to avoid transformation of the austenite to ferrite and pearlite, (3) working the quenched steel at a temperature ranging from ambient temperature up to a temperature at which bainite can exist, and (4) cooling the steel whereby the ferrite-austenite mixture is converted to a ferrite-bainite mixture, with such conversion being accelerated and extended during working and/or cooling.
Claim 20
Dependent Claim 17 words
A method as defined in claim 17 wherein the steel contains at least 10% by volume ferrite.
Claim 21
Dependent Claim 20 words
A method as defined in claim 17 wherein the steel is a carbon steel containing from 0.1 to 0.7% carbon.
Claim 22
Dependent Claim 24 words
A method as defined in claim 17 wherein the steel is a low alloy steel containing less than 5% total alloying elements by weight.
Claim 23
Dependent Claim 20 words
A method as defined in claim 17 wherein the steel partially austenitized is a steel formed of ferrite and pearlite.
Claim 24
Dependent Claim 16 words
A method as defined in claim 17 wherein the steel is an AISI/SAE Grade 1144 steel.
Claim 25
Dependent Claim 24 words
A method as defined in claim 17 wherein the steel is partially austenitized by rapid heating by passing an electric current through the steel.
Claim 26
Dependent Claim 49 words
A method as defined in claim 23 wherein the electric current is passed through the steel to heat the steel until the increase in temperature of the steel ceases, and then the amount of current passed through the steel is adjusted to maintain the steel at a constant temperature.
Claim 27
Dependent Claim 58 words
A method as defined in claim 23 wherein the electric current is passed through the steel until the increase in temperature of the steel ceases, and then the flow of electric current is stopped after a pre-determined temperature is reached and a pre-determined time has passed from the time when the increase in temperature of the steel ceased.
Claim 28
Dependent Claim 19 words
A method as defined in claim 17 wherein the steel is subjected to working by advancing through a die.
Claim 29
Dependent Claim 20 words
A method as defined in claim 17 wherein the steel is subjected to working at a temperature above ambient temperature.
Claim 30
Dependent Claim 23 words
A method as defined in claim 17 wherein the steel is subjected to working at a temperature ranging from 600° to 1100° F.
Claim 31
Dependent Claim 16 words
A method as defined in claim 17 which includes the step of strain relieving the steel.
Claim 32
Dependent Claim 15 words
A method as defined in claim 17 which includes the step of straightening the steel.
Claim 33
Independent Claim 107 words
A method for the strengthening of carbon and low alloy steels comprising: (1) partially austenitizing a hypoeutectoid carbon or low alloy steel by rapid heating in less than ten minutes to produce a ferrite-austenite mixture. (2) quenching the partially austenitized steel to an intermediate temperature above the M s temperature for the steel at a rate sufficient to avoid transformation of the austenite to ferrite and pearlite, and (3) working the quenched steel at a temperature ranging from ambient temperature up to a temperature at which bainite can exist whereby the ferrite-austenite mixture is converted to a ferrite-bainite mixture having high levels of machinability, strength and toughness.
Claim 34
Independent Claim 107 words
A method for the strengthening of carbon and low alloy steels comprising: (1) partially austenitizing a hypoeutectoid carbon or low alloy steel by rapid heating in less than ten minutes to produce a ferrite-austenite mixture. (2) quenching the partially austenitized steel to an intermediate temperature above the M s temperature for the steel at a rate sufficient to avoid transformation of the austenite to ferrite and pearlite, and (3) working the quenched steel at a temperature ranging from ambient temperature up to a temperature at which bainite can exist whereby the ferrite-austenite mixture is converted to a ferrite-bainite mixture having high levels of machinability, strength and toughness.
Claim 35
Dependent Claim 25 words
A method as defined in claim 31 wherein the steel is cooled to ambient temperature after quenching, and is subjected to working at ambient temperature.
Claim 36
Dependent Claim 38 words
A method as defined in claim 31 wherein the steel is cooled to room temperature after quenching, reheated to an elevated temperature above ambient temperature but below the critical temperature and subjected to working at said elevated temperature.
Claim 37
Dependent Claim 55 words
A method as defined in claim 31 wherein the steel is held after quenching for a time sufficient to enable the temperature of the steel to equalize over the cross section thereof, cooled to a temperature below the equalization temperature and subjected to working at a temperature above ambient temperature but below the equalization temperature.
Claim 38
Dependent Claim 17 words
A method as defined in claim 34 wherein the equalization temperature ranges from 600° to 1100° F.
Claim 39
Dependent Claim 51 words
A method as defined in claim 31 wherein the steel is held after quenching for a time sufficient for the temperature of the steel to equalize over the cross section thereof, heated to a temperature above the equalization temperature and subjected to working while at a temperature above the equalization temperature.
Claim 40
Dependent Claim 17 words
A method as defined in claim 36 wherein the equalization temperature ranges from 600° to 1100° F.
Claim 41
Dependent Claim 17 words
A method as defined in claim 31 wherein the steel contains at least 10% by volume ferrite.
Claim 42
Dependent Claim 16 words
A method as defined in claim 31 wherein the steel is an AISI/SAE Grade 1144 steel.
Claim 43
Dependent Claim 23 words
A method as defined in claim 31 wherein the steel is partially austenitized at a temperature ranging from about 1340° to 1680° F.
Claim 44
Dependent Claim 10 words
A steel produced by the method defined in claim 31.
Claim 45
Dependent Claim 10 words
A steel produced by the method defined in claim 17.
Claim 46
Independent Claim 117 words
A method for the strengthening of carbon and low alloy steels comprising: (1) partially austenitizing a hypoeutectoid carbon or low alloy steel by passing an electric current through the steel to rapidly heat the steel in less than ten minutes and produce a ferrite-austenite mixture, (2) quenching the partially austenitized steel to an intermediate temperature above the M s temperature for the steel at a rate sufficient to avoid transformation of the austenite to ferrite and pearlite, and (3) working the quenched steel at a temperature ranging from ambient temperature up to a temperature at which bainite can exist whereby the ferrite-austenite mixture is converted to a ferrite-bainite mixture having high levels of machinability, strength and toughness.
Claim 47
Independent Claim 117 words
A method for the strengthening of carbon and low alloy steels comprising: (1) partially austenitizing a hypoeutectoid carbon or low alloy steel by passing an electric current through the steel to rapidly heat the steel in less than ten minutes and produce a ferrite-austenite mixture, (2) quenching the partially austenitized steel to an intermediate temperature above the M s temperature for the steel at a rate sufficient to avoid transformation of the austenite to ferrite and pearlite, and (3) working the quenched steel at a temperature ranging from ambient temperature up to a temperature at which bainite can exist whereby the ferrite-austenite mixture is converted to a ferrite-bainite mixture having high levels of machinability, strength and toughness.
Claim 48
Dependent Claim 25 words
A method as defined in claim 43 wherein the steel is cooled to ambient temperature after quenching, and is subjected to working at ambient temperature.
Claim 49
Dependent Claim 38 words
A method as defined in claim 43 wherein the steel is cooled to room temperature after quenching, reheated to an elevated temperature above ambient temperature but below the critical temperature and subjected to working at said elevated temperature.
Claim 50
Dependent Claim 55 words
A method as defined in claim 43 wherein the steel is held after quenching for a time sufficient to enable the temperature of the steel to equalize over the cross section thereof, cooled to a temperature below the equalization temperature and subjected to working at a temperature above ambient temperature but below the equalization temperature.
Claim 51
Dependent Claim 17 words
A method as defined in claim 46 wherein the equalization temperature ranges from 600° to 1100° F.
Claim 52
Dependent Claim 51 words
A method as defined in claim 43 wherein the steel is held after quenching for a time sufficient for the temperature of the steel to equalize over the cross section thereof, heated to a temperature above the equalization temperature and subjected to working while at a temperature above the equalization temperature.
Claim 53
Dependent Claim 17 words
A method as defined in claim 43 wherein the steel contains at least 10% by volume ferrite.
Claim 54
Dependent Claim 24 words
A method as defined in claim 43 wherein the steel is a low alloy steel containing less than 5% total alloying elements by weight.
Claim 55
Dependent Claim 16 words
A method as defined in claim 43 wherein the steel is an AISI/SAE Grade 1144 steel.
Claim 56
Dependent Claim 49 words
A method as defined in claim 43 wherein the electric current is passed through the steel to heat the steel until the increase in temperature of the steel ceases, and then the amount of current passed through the steel is adjusted to maintain the steel at a constant temperature.
Claim 57
Dependent Claim 58 words
A method as defined in claim 43 wherein the electric current is passed through the steel until the increase in temperature of the steel ceases, and then the flow of electric current is stopped after a pre-determined temperature is reached and a pre-determined time has passed from the time when the increase in temperature of the steel ceased.
Claim 58
Dependent Claim 10 words
A steel produced by the method defined in claim 43.

References Cited (Backward Citations)

US3340102A Cited
US3240634A Cited
US3423252A Cited
US3444008A Cited
US3806378A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-05-08 1981-11-07 1982-05-09 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-05-08 1985-11-07 1986-05-09 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-05-08 1989-11-07 1990-05-09 $7700.00 Window Closed / Lapsed