US4117073A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Process for the production of preplasticized materials
Assignee: Bayer AG
•
Filing: 1975-10-14
•
Granted: 1978-09-26
•
Expires: 1995-10-14
Abstract
Abstract A process and apparatus for the production of materials preplasticized to their final density from high molecular weight powder-form completed mixtures, which are directly used as starting product for subsequent final processing, wherein the powder mixture is conveyed along a helical compression screw and subjected to accelerated compression and, at the same time, preplasticized at a temperature which corresponds to the material temperature required for final processing.
Inventors
- 👤 Heinrich Koch
- 👤 Josef Lehnen
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-31 22:22
CPC Classifications
B; B29; B29C; B29C48/00; B29C48/25; B29C48/36; B29C48/395; B29C48/285; B29C48/286; B29C48/288; B29C48/03; B29C48/07; B29C48/08
Claims Analysis
Total Claims: 5
Claim 1
Independent Claim
125 words
A process for the production of materials condensed to their final density from high molecular weight powder-form rubber mixtures, wherein the powder mixture is conveyed along a helical compression screw with decreasing helix diameter fitting closely within a conical casing and is thereby subjected to increasing compression through the application of additional shear forces in the outer zone of the helixes whilst at the same time the powder mixture is condensed and plasticized at a suitable temperature, the powder mixture being stirred and supplied to the helical compression screw by rotating pitched blades which prevent the formation of bridges in the supplied powder mixture, the gaseous constituents present in the powder mixture being continuously taken up by the mixture and carried off outwardly during compression.
Claim 2
Dependent Claim
125 words
A process for the production of materials condensed to their final density from high molecular weight powder-form rubber mixtures, wherein the powder mixture is conveyed along a helical compression screw with decreasing helix diameter fitting closely within a conical casing and is thereby subjected to increasing compression through the application of additional shear forces in the outer zone of the helixes whilst at the same time the powder mixture is condensed and plasticized at a suitable temperature, the powder mixture being stirred and supplied to the helical compression screw by rotating pitched blades which prevent the formation of bridges in the supplied powder mixture, the gaseous constituents present in the powder mixture being continuously taken up by the mixture and carried off outwardly during compression.
Claim 3
Dependent Claim
42 words
A process as claimed in claim 1, wherein the powder mixture is compressed to its final density in a helical compression zone with a constantly decreasing helix diameter, the conical shell surrounding the helixes forming an angle of from 10° to 60°.
Claim 4
Dependent Claim
23 words
A process as claimed in claim 1, wherein preplasticisation takes place at a temperature in the range from room temperature to 100° C.
Claim 5
Dependent Claim
31 words
A process as claimed in claim 1, wherein removal of the gaseous constituents from the powder mixture is continued after the material has been compressed to its final density and preplasticised.
References Cited (Backward Citations)
US2744287A
Cited
US2894280A
Cited
US3036335A
Cited
US3559240A
Cited
US3535737A
Cited
US3522627A
Cited
US3633494A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1981-09-25 | 1982-03-27 | 1982-09-26 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1985-09-25 | 1986-03-27 | 1986-09-26 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1989-09-25 | 1990-03-27 | 1990-09-26 | $7700.00 | Window Closed / Lapsed |