← Back to Patent Explorer
US4249609A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for forming channels of high fluid conductivity in formation parts around a borehole

Assignee: Shell Internationale Research Maatschappij BV
•
Filing: 1979-04-04
•
Granted: 1981-02-10
•
Expires: 1999-04-04
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for increasing the productivity of wells completed in soft acid-soluble producing formations, comprising the steps of: producing in such formation a fracture containing a viscous fluid; injecting an acid solution wherein the viscosity of the contained fluid is preferably at least 50 times greater than the acid solution into the formation to create acid etched fingering channels; injecting into the formation a fluid with a propping agent the viscosity of which is at least equal to the acid solution until propping agent is deposited in the fracture at least in those areas where channels have been etched; and lowering the pressure within the fracture to allow it to move towards a closed position. By controlling the viscosity ratios of viscous fluid to acid solution and carrying fluid to acid solution long fingering acid etched channels are created and propped such that the channel walls of the soft formation are propped open when the fluid pressure in the fracture is reduced.

Inventors

  • 👤 Rudolf Haafkens
  • 👤 Rafael F. Luque
  • 👤 Willem De Vries

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-09 06:46
CPC Classifications
C; C09; C09K; C09K8/00; C09K8/60; C09K8/62; C09K8/72; E; E21; E21B; E21B43/00; E21B43/25; E21B43/26; E21B43/267; E21B43/27

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 255 words
A method for forming channels of high fluid conductivity in a relatively soft acid-soluble formation about a cased well which penetrates such formation and which has its casing perforated along at least a part of the casing wall which faces such formation, comprising the steps of: (a) producing in the formation a fracture containing a viscous fluid which communicates with the perforations (b) injecting an acid solution through the perforations into the viscous fluid in the fracture at a pressure at which the fracture remains open, the viscosity ratio between the viscous fluid and the acid solution being chosen such that the viscous fluid is displaced in the fracture in an unstable manner by the acid solution; (c) continuing the injection of the acid solution through the perforations until channels have been etched in areas of the fracture walls; (d) injecting a viscous carrying fluid containing a propping agent through the perforations into the fracture at a pressure at which the fracture remains open, the viscosity of the carrying fluid being at least equal to the viscosity of the acid solution; (e) continuing the injection of the carrying fluid and the propping agent until propping agent is present in the fracture between at least part of those areas of the fracture walls wherein channels have been etched; and (f) lowering the fluid pressure in the fracture, thereby allowing the fracture walls to be displaced towards a closing position, in which position the walls of the channels are supported and held open by the propping agent.
Claim 2
Independent Claim 255 words
A method for forming channels of high fluid conductivity in a relatively soft acid-soluble formation about a cased well which penetrates such formation and which has its casing perforated along at least a part of the casing wall which faces such formation, comprising the steps of: (a) producing in the formation a fracture containing a viscous fluid which communicates with the perforations (b) injecting an acid solution through the perforations into the viscous fluid in the fracture at a pressure at which the fracture remains open, the viscosity ratio between the viscous fluid and the acid solution being chosen such that the viscous fluid is displaced in the fracture in an unstable manner by the acid solution; (c) continuing the injection of the acid solution through the perforations until channels have been etched in areas of the fracture walls; (d) injecting a viscous carrying fluid containing a propping agent through the perforations into the fracture at a pressure at which the fracture remains open, the viscosity of the carrying fluid being at least equal to the viscosity of the acid solution; (e) continuing the injection of the carrying fluid and the propping agent until propping agent is present in the fracture between at least part of those areas of the fracture walls wherein channels have been etched; and (f) lowering the fluid pressure in the fracture, thereby allowing the fracture walls to be displaced towards a closing position, in which position the walls of the channels are supported and held open by the propping agent.
Claim 3
Dependent Claim 18 words
The method according to claim 1, wherein step (f) further includes lowering the viscosity of the viscous fluids.
Claim 4
Dependent Claim 22 words
The method of claim 2, wherein the fluid pressure in the fracture and the viscosity of the viscous fluids are lowered simultaneously.
Claim 5
Dependent Claim 22 words
The method according to claim 1 wherein the viscosity ratio between the viscous fluid and the acid solution is at least 150.
Claim 6
Dependent Claim 15 words
The method according to claim 4, wherein the viscosity ratio is between 200 and 300.
Claim 7
Dependent Claim 19 words
The method according to claim 1 wherein the viscous fluid and the carrying fluid are of the same composition.
Claim 8
Dependent Claim 24 words
The method according to claim 1 wherein the viscosity of the carrying fluid is at least equal to the viscosity of the viscous fluid.
Claim 9
Dependent Claim 22 words
The method according to claim 1 wherein the viscosity of the carrying fluid is lower than the viscosity of the viscous fluid.
Claim 10
Dependent Claim 13 words
The method according to claim 1 wherein the formation substantially consists of chalk.
Claim 11
Dependent Claim 22 words
The method according to claim 1 wherein the relatively soft formation consists of a material having a Brinell hardness lower than 15.
Claim 12
Dependent Claim 16 words
The method according to claim 1 wherein the well lies in the plane of the fracture.

References Cited (Backward Citations)

US2689009A Cited
US3167124A Cited
US3167123A Cited
US3592266A Cited
US3727689A Cited
US3799266A Cited
US3960736A Cited
US3918524A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1984-02-10 1984-08-11 1985-02-10 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1988-02-10 1988-08-11 1989-02-10 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1992-02-10 1992-08-11 1993-02-10 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag