Claims Analysis
Total Claims: 9
Claim 1
Independent Claim
283 words
An in-situ method for producing a crude heavy hydrocarbon material from an underground carbonaceous formation, comprising the serial steps of: (a) drilling a borehole, (b) creating a void space at or near the bottom of the borehole, by a cutting means and a removing means, (c) maintaining the integrity of the formation to avoid collapse of the formation, (d) enlarging the void space in both the horizontal and vertical directions, thereby enlarging the void space in the approximate shape of a cylinder to obtain a processing chamber, (e) continuing the cutting action of step (d) with the cutting means being traversed upwardly and rotationally, thus fracturing (cutting) the underground carbonaceous formation, to the upper limits of the formation, (f) forming a slurry filling at least a portion of the fractured space in the formation, (g) inserting a pipe system comprising a bundle of spring-loaded guide tubes into the slurry, the bundle being retained in a closed position by an end cap, with each guide tube enclosing a smaller diameter flexible tube, the flexible tubes being connected to a source of liquid processing material, (h) lowering the guide tube bundle to the bottom (floor) of the slurry, (i) releasing the end cap, thus allowing the distal ends of the guide tubes to move outwardly in a generally horizontal direction normal to the axis of the bundle, thus inserting the guide tubes in the slurry, (j) introducing processing material through the inner flexible tubes, with the processing material contacting and separating, at least partially, the heavy hydrocarbon material from the remainder of the carbonaceous material, forming lighter and heavier phases in the mixture, and (k) removing the lighter phase which contains the heavy hydrocarbon material.
Claim 2
Dependent Claim
283 words
An in-situ method for producing a crude heavy hydrocarbon material from an underground carbonaceous formation, comprising the serial steps of: (a) drilling a borehole, (b) creating a void space at or near the bottom of the borehole, by a cutting means and a removing means, (c) maintaining the integrity of the formation to avoid collapse of the formation, (d) enlarging the void space in both the horizontal and vertical directions, thereby enlarging the void space in the approximate shape of a cylinder to obtain a processing chamber, (e) continuing the cutting action of step (d) with the cutting means being traversed upwardly and rotationally, thus fracturing (cutting) the underground carbonaceous formation, to the upper limits of the formation, (f) forming a slurry filling at least a portion of the fractured space in the formation, (g) inserting a pipe system comprising a bundle of spring-loaded guide tubes into the slurry, the bundle being retained in a closed position by an end cap, with each guide tube enclosing a smaller diameter flexible tube, the flexible tubes being connected to a source of liquid processing material, (h) lowering the guide tube bundle to the bottom (floor) of the slurry, (i) releasing the end cap, thus allowing the distal ends of the guide tubes to move outwardly in a generally horizontal direction normal to the axis of the bundle, thus inserting the guide tubes in the slurry, (j) introducing processing material through the inner flexible tubes, with the processing material contacting and separating, at least partially, the heavy hydrocarbon material from the remainder of the carbonaceous material, forming lighter and heavier phases in the mixture, and (k) removing the lighter phase which contains the heavy hydrocarbon material.
Claim 3
Dependent Claim
126 words
The method of claim 1 wherein (a) the underground formation is about 300 feet or more below the surface, (b) the cutting means is an hydraulic cutting means, (c) the removing means is a pumping means, (d) the integrity of the formation is maintained by the pressure of gas introduced into the void space, (e) the void space is enlarged by an hydraulic jetting means, (f) the void space has an arching roof, dome-like in character, thereby assisting in maintaining the integrity of the formation, (g) the heavy hydrocarbon material is selected from the group consisting of bitumen, heavy oil, and gilsonite, and (h) the underground formation is selected from the group consisting of tar sand or oil sand formation, heavy oil formation, and gilsonite formation.
Claim 4
Dependent Claim
98 words
The method of claim 2 wherein (a) the gas pressure is in approximate balance with the overburden and formation pressure, and (b) the gas used for pressuring is selected from the group of gases that is non-reactive, or of low reactivity, with the formation, the equipment used in the borehole, or the processing materials, (c) the enlarged void space has a radius of about 30-200 feet, (d) the initial void space has a height of approximately 20-25% that of the pay zone of the underground formation, and (e) the hydraulic cutting means uses water as the hydraulic fluid.
Claim 5
Dependent Claim
67 words
The method of claim 1 wherein (a) the pipe system comprises a plurality of flexible and arcuate-shaped pipes, aligned radially along a common axis, (b) the outermost ends of the outwardly-flared pipes are cut at an angle, (c) the pipe system is spring-loaded in the closed position, (d) the heavy hydrocarbon material is bitumen, and (e) the underground formation is a tar sand or oil sand formation.
Claim 6
Dependent Claim
39 words
The method of claim 1 wherein the integrity of the formation is maintained by lining the surface of the created void space by a plugging agent, a material that seals, fills, and plugs various imperfections in the exposed formation.
Claim 7
Dependent Claim
79 words
The method of claim 1 wherein (a) the processing material is selected from the group consisting of water, lower hydrocarbons, the alcohol, halide, and ester derivatives of said lower hydrocarbons, and mixtures thereof, (b) the processing material further comprises a promoter selected from the group consisting of sodium hydroxide, surfactant, and mixtures thereof, and (c) the processing temperature ranges from about 175° F. (about 80° C.) to about the boiling point of the liquid at the given cell pressure.
Claim 8
Dependent Claim
43 words
The method of claim 6 wherein (a) the pH of the processing mixture ranges from about 8 to about 9, and (b) a gas is added to the processing material introduced, said gas forming a froth that aids in separation of the bitumen.
Claim 9
Dependent Claim
12 words
The process of claim 1 wherein steps (j) and (k) are repeated.