Claims Analysis
Total Claims: 23
Claim 1
Independent Claim
106 words
A method of squeeze cementing for filling channels in casing cement between a wellbore and a casing therein, said casing and said casing cement having perforations therethrough to establish fluid communication between said wellbore and a formation adjacent said perforations, said perforations also in fluid communication with said channels; said method comprising: isolating said wellbore adjacent said perforations: flowing squeeze cement down said wellbore, through said perforations, and into said channels; flowing a cement contaminating liquid down said wellbore and mixing said contaminating liquid with said squeeze cement remaining in said wellbore after said channels are filled; and removing the contaminated squeeze cement from said wellbore.
Claim 2
Independent Claim
106 words
A method of squeeze cementing for filling channels in casing cement between a wellbore and a casing therein, said casing and said casing cement having perforations therethrough to establish fluid communication between said wellbore and a formation adjacent said perforations, said perforations also in fluid communication with said channels; said method comprising: isolating said wellbore adjacent said perforations: flowing squeeze cement down said wellbore, through said perforations, and into said channels; flowing a cement contaminating liquid down said wellbore and mixing said contaminating liquid with said squeeze cement remaining in said wellbore after said channels are filled; and removing the contaminated squeeze cement from said wellbore.
Claim 3
Dependent Claim
21 words
The method of claim 1 including: allowing the squeeze cement in said channels to harden prior to removing said contaminated cement.
Claim 4
Dependent Claim
50 words
The method of claim 2 wherein the step of isolating said wellbore comprises: filling said wellbore from the bottom thereof to a point below the lowermost of said perforations with a packing liquid; said packing liquid having a density equal to or greater than the density of said squeeze cement.
Claim 5
Dependent Claim
14 words
The method of claim 2 wherein said packing fluid comprises a heavily-weighted brine solution.
Claim 6
Dependent Claim
13 words
The method of claim 2 wherein said packing fluid comprises a heavily-weighted mud.
Claim 7
Dependent Claim
25 words
The method of claim 3 wherein said contaminating liquid is mixed with said squeeze cement in a volume ratio of at least 1 to 1.
Claim 8
Dependent Claim
38 words
The method of claim 6 wherein the step of allowing said squeeze cement to harden comprises: shutting in the wellbore and maintaining a pressure on the contaminating cement in access to the normal shutin pressure in the wellbore.
Claim 9
Independent Claim
179 words
A method of squeeze cementing a well wherein said well has a casing throughout the wellbore, casing cement between said casing and the wellbore of said well, perforations through said casing and said casing cement to establish fluid communication between the interior of said casing and a formation adjacent said perforations, channels in said casing cement in fluid communication with at least some of said perforations, a well tubing string in said casing extending from the surface to the proximity of said perforations, and a packer means for sealing between said tubing and said casing above said perforations, said method comprising: isolating said casing adjacent said perforations; lowering a coiled tubing down said well tubing string to a point adjacent said peforations; flowing uncontaminated squeeze cement through said coiled tubing and through said perforations into said channels; flowing a cement contaminating liquid down said coiled tubing to mix with the squeeze cement remaining in said casing; allowing said uncontaminated squeeze cement in said channels to harden; and removing said contaminated squeeze cement from said casing through said coiled tubing.
Claim 10
Independent Claim
179 words
A method of squeeze cementing a well wherein said well has a casing throughout the wellbore, casing cement between said casing and the wellbore of said well, perforations through said casing and said casing cement to establish fluid communication between the interior of said casing and a formation adjacent said perforations, channels in said casing cement in fluid communication with at least some of said perforations, a well tubing string in said casing extending from the surface to the proximity of said perforations, and a packer means for sealing between said tubing and said casing above said perforations, said method comprising: isolating said casing adjacent said perforations; lowering a coiled tubing down said well tubing string to a point adjacent said peforations; flowing uncontaminated squeeze cement through said coiled tubing and through said perforations into said channels; flowing a cement contaminating liquid down said coiled tubing to mix with the squeeze cement remaining in said casing; allowing said uncontaminated squeeze cement in said channels to harden; and removing said contaminated squeeze cement from said casing through said coiled tubing.
Claim 11
Dependent Claim
21 words
The method of claim 8 including: allowing the uncontaminated cement in said channels to harden prior to removing said contaminated cement.
Claim 12
Dependent Claim
57 words
The method of claim 8 wherein the step of isolating the casing comprises: flowing a packing liquid down said coiled tubing to fill the casing from the bottom of the wellbore to a point below the lowermost of said perforations, said packing liquid having a density equal to or greater than the density of said squeeze cement.
Claim 13
Dependent Claim
14 words
The method of claim 10 wherein said packing fluid comprises a heavily-weighted brine solution.
Claim 14
Dependent Claim
13 words
The method of claim 10 wherein said packing fluid comprises a heavily-weighted mud.
Claim 15
Dependent Claim
44 words
The method of claim 10 including: flowing an incompressible loading liquid down said coiled tubing prior to the step of flowing said squeeze cement to load said well tubing and said casing between said packer means and said packing liquid with said loading liquid.
Claim 16
Dependent Claim
85 words
The method of claim 12 wherein the step of flowing uncontaminated squeeze cement comprises: shutting off flow through said well tubing string; lowering said coiled tubing to the top of said packing fluid; flowing said squeeze cement through said coiled tubing while raising said coiled tubing in said casing; opening flow through said well tubing string upon a sustained increase in flow pressure of said squeeze cement; and raising said coiled tubing to dump any remaining squeeze cement from said coiled tubing into said casing.
Claim 17
Dependent Claim
63 words
The method of claim 14 wherein the step of flowing a cement contaminating liquid comprises: lowering said coiled tubing through said squeeze cement remaining in said casing and into said packing liquid; and flowing said cement contaminating liquid through said coiled tubing while lowering said coiled tubing through said squeeze cement to allow said cement contaminating liquid to mix with said squeeze cement.
Claim 18
Dependent Claim
26 words
The method of claim 15 wherein said cement contaminating liquid is mixed with said squeeze cement in a volume ratio of at least 1 to 1.
Claim 19
Dependent Claim
18 words
The method of claim 16 wherein said cement contaminating liquid comprises: an aqueous mixture of bentonite and borax.
Claim 20
Dependent Claim
48 words
The method of claim 16 wherein the step allowing the uncontaminated squeeze cement to harden comprises: shutting off flow through said well tubing while maintaining the pressure on the contaminated squeeze cement remaining in said casing at a value higher than the normal shutin pressure of the well.
Claim 21
Dependent Claim
41 words
The method of claim 18 wherein the step of removing the contaminated squeeze cement comprises: lowering said coiled tubing through said contaminated squeeze cement, and flowing water down said tubing to force said contaminated squeeze cement upward through said coiled tubing.
Claim 22
Dependent Claim
17 words
The method of claim 19 including: removing said packing liquid from said casing through said coiled tubing.
Claim 23
Dependent Claim
20 words
The method of claim 20 including: re-perforating said casing after said contaminated squeeze cement and said packing liquid is removed.