Abstract A method for cementing a casing or a liner traversing earth formations comprising the supplemental injection of cement at a pressure greater than the pore pressure in the earth formations during a cementing operation to enchance the effectiveness of the cement integrity by maintaining hydrostatic pressure in an annulus between the pipe and the borehole at a location where the pore pressure of the earth formations is apt to impair the cement integrity in the annulus thereby preventing annular migration of gas or liquids in the cement seal between the earth formations and a liner or casing.
Inventors
- 👤 Edward T. Wood
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-09 01:36
CPC Classifications
E; E21; E21B; E21B33/00; E21B33/10; E21B33/13; E21B33/14; E21B33/12; E21B33/124; E21B33/1243; E21B33/127
Claims Analysis
Total Claims: 8
Claim 1
Independent Claim
230 words
A method for cementing a string of pipe in a borehole traversing earth formations comprising the steps of: positioning a string of pipe in a borehole where the string of pipe has a plurality of selectively operable pressure responsive communication passages between the interior of the string of pipe and the exterior of the string of pipe in spaced apart locations along the length of the string of pipe so that the communication passages are proximate to earth formations having fluid or gas under pore pressure; injecting a cement slurry from the earth's surface under pumping pressure through the interior of the string of pipe to move the cement slurry up into the annulus between the string of pipe and the borehole to a desired level in the annulus between the string of pipe and the borehole while maintaining the level of cement slurry in the interior of the string of pipe above the said one location; discontinuing the pumping pressure when the cement slurry reaches the desired level on the annulus; and thereafter, opening the communication passages in sequence and providing cement slurry under pressure through the communication passages sufficient to maintain hydrostatic pressure on the cement slurry in the annulus at the location of a communication passage at a pressure higher than pore pressure until the cement has cured for preventing fluid or gas migration in the annulus.
Claim 2
Independent Claim
230 words
A method for cementing a string of pipe in a borehole traversing earth formations comprising the steps of: positioning a string of pipe in a borehole where the string of pipe has a plurality of selectively operable pressure responsive communication passages between the interior of the string of pipe and the exterior of the string of pipe in spaced apart locations along the length of the string of pipe so that the communication passages are proximate to earth formations having fluid or gas under pore pressure; injecting a cement slurry from the earth's surface under pumping pressure through the interior of the string of pipe to move the cement slurry up into the annulus between the string of pipe and the borehole to a desired level in the annulus between the string of pipe and the borehole while maintaining the level of cement slurry in the interior of the string of pipe above the said one location; discontinuing the pumping pressure when the cement slurry reaches the desired level on the annulus; and thereafter, opening the communication passages in sequence and providing cement slurry under pressure through the communication passages sufficient to maintain hydrostatic pressure on the cement slurry in the annulus at the location of a communication passage at a pressure higher than pore pressure until the cement has cured for preventing fluid or gas migration in the annulus.
Claim 3
Dependent Claim
28 words
The method as set forth in claim 1 wherein the passages are opened in an upward direction sequence beginning from the lowermost end of the string of pipe.
Claim 4
Independent Claim
241 words
A method for cementing a string of pipe in a borehole traversing earth formations comprising the steps of: positioning a string of pipe in a borehole where the string of pipe has a communication passage between the interior of the string of pipe and the exterior of the string of pipe in at least one location intermediate of the length of the string of pipe so that the communication passage is proximate to earth formations having fluid or gas under pore pressure and where the string of pipe has an inflatable packet located above the communication passage; injecting a cement slurry from the earth's surface under pumping pressure through the interior of the string of pipe to move the cement slurry up into the annulus between the string of pipe and the borehole to a desired level in the annulus between the string of pipe and the borehole while maintaining the level of cement slurry in the interior of the string of pipe above the said one location; discontinuing the pumping pressure when the cement slurry reaches the desired level on the annulus; and inflating the inflatable packer into contact with the well bore and providing cement slurry under pressure through the communication passage sufficient to maintain hydrostatic pressure on the cement slurry in the annulus at said one location at a pressure higher than pore pressure until the cement has cured for preventing fluid or gas migration in the annulus.
Claim 5
Independent Claim
241 words
A method for cementing a string of pipe in a borehole traversing earth formations comprising the steps of: positioning a string of pipe in a borehole where the string of pipe has a communication passage between the interior of the string of pipe and the exterior of the string of pipe in at least one location intermediate of the length of the string of pipe so that the communication passage is proximate to earth formations having fluid or gas under pore pressure and where the string of pipe has an inflatable packet located above the communication passage; injecting a cement slurry from the earth's surface under pumping pressure through the interior of the string of pipe to move the cement slurry up into the annulus between the string of pipe and the borehole to a desired level in the annulus between the string of pipe and the borehole while maintaining the level of cement slurry in the interior of the string of pipe above the said one location; discontinuing the pumping pressure when the cement slurry reaches the desired level on the annulus; and inflating the inflatable packer into contact with the well bore and providing cement slurry under pressure through the communication passage sufficient to maintain hydrostatic pressure on the cement slurry in the annulus at said one location at a pressure higher than pore pressure until the cement has cured for preventing fluid or gas migration in the annulus.
Claim 6
Dependent Claim
39 words
The method as set forth in claim 3 wherein the communication passage is opened in response to pressure in the interior of the pipe and the inflatable packer is inflated by cement slurry prior to opening the communication passage.
Claim 7
Dependent Claim
23 words
The method as set forth in claim 3 wherein the string of pipe has a second inflatable packer located below the communication passage.
Claim 8
Dependent Claim
41 words
The method as set forth in claim 5 wherein the communication passage is opened in response to pressure in the interior of the pipe and the inflatable packers are inflated into contact with a wellbore prior to the cement slurry hardening.
References Cited (Backward Citations)
US2029380A
Cited
US2173034A
Cited
US2986217A
Cited
US3055424A
Cited
US3062285A
Cited
US3335795A
Cited
US3865188A
Cited
US4155404A
Cited
US4450912A
Cited
US4420159A
Cited
US4440226A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1990-04-06 | 1990-10-06 | 1991-04-07 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1994-04-06 | 1994-10-06 | 1995-04-07 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1998-04-06 | 1998-10-06 | 1999-04-07 | $7700.00 | Window Closed / Lapsed |