Claims Analysis
Total Claims: 12
Claim 1
Independent Claim
118 words
A method of detecting underground tank leaks wherein the tank contains organic fluid comprising: (a) providing a plurality of spaced-apart boreholes in the ground adjacent said tank; (b) providing gas analysis means in each borehole for determining presence of volatile organic material; (c) providing a neutron activation gauge in boreholes found in step (b) to contain volatile organic material; (d) activating said gauge at spaced intervals along the length of said borehole and obtaining readings; (e) correlating the readings obtained in step (d) to each other to detect indices of probable tank leak and; (f) correlating the readings obtained in step (d) to each other for identifying particular borehole or boreholes indicating location of said probable tank leak.
Claim 2
Independent Claim
118 words
A method of detecting underground tank leaks wherein the tank contains organic fluid comprising: (a) providing a plurality of spaced-apart boreholes in the ground adjacent said tank; (b) providing gas analysis means in each borehole for determining presence of volatile organic material; (c) providing a neutron activation gauge in boreholes found in step (b) to contain volatile organic material; (d) activating said gauge at spaced intervals along the length of said borehole and obtaining readings; (e) correlating the readings obtained in step (d) to each other to detect indices of probable tank leak and; (f) correlating the readings obtained in step (d) to each other for identifying particular borehole or boreholes indicating location of said probable tank leak.
Claim 3
Dependent Claim
26 words
The method of claim 1 further including providing gas identification means in a particular borehole indicating presence of probable tank leak for identifying the organic material.
Claim 4
Dependent Claim
87 words
The method of claim 1, further including (g) periodically providing gas analysis means in each borehole for determining presence of volatile organic material; (h) providing a neutron activation gauge in boreholes found in step (g) to contain volatile organic material; (i) activating said gauge at spaced intervals along the length of said boreholes for determining location and concentration of volatile organic material; and (j) correlating the readings obtained in step (i) at each time period to other time periods for determining rate of said probable tank leak.
Claim 5
Independent Claim
103 words
A method of determining rate of leakage in an underground tank leaking organic material forming vapors in the soil adjacent the tank comprising (a) providing a plurality of spaced apart boreholes in the ground adjacent said tank; (b) providing gas analysis means in each borehole for determining presence of volatile organic material; (c) providing a neutron activation gauge in boreholes found in a step (b) to contain volatile organic material; (d) activating said gauge at spaced intervals along the length of said borehole, and obtaining readings; (e) repeating steps (c) and (d) periodically; and (f) correlating the readings for determining rate of leak.
Claim 6
Independent Claim
103 words
A method of determining rate of leakage in an underground tank leaking organic material forming vapors in the soil adjacent the tank comprising (a) providing a plurality of spaced apart boreholes in the ground adjacent said tank; (b) providing gas analysis means in each borehole for determining presence of volatile organic material; (c) providing a neutron activation gauge in boreholes found in a step (b) to contain volatile organic material; (d) activating said gauge at spaced intervals along the length of said borehole, and obtaining readings; (e) repeating steps (c) and (d) periodically; and (f) correlating the readings for determining rate of leak.
Claim 7
Dependent Claim
15 words
The method of claim 4 wherein the boreholes extend below the level of the tank.
Claim 8
Independent Claim
96 words
A method of detecting underground tank leaks, comprising the steps of: (a) providing a plurality of spaced-apart boreholes in the ground adjacent and around said tank; (b) providing a neutron activation gauge in said boreholes; (c) activating said gauge at spaced intervals along the length of each of said boreholes for reading detection of hydrocarbon material; (d) correlating the readings obtained in step (c) to each other to detect indices of a tank leak; and (e) utilizing gas chromatography in at least one of said boreholes indicating presence of leakage to identify volatile organic material therein.
Claim 9
Independent Claim
96 words
A method of detecting underground tank leaks, comprising the steps of: (a) providing a plurality of spaced-apart boreholes in the ground adjacent and around said tank; (b) providing a neutron activation gauge in said boreholes; (c) activating said gauge at spaced intervals along the length of each of said boreholes for reading detection of hydrocarbon material; (d) correlating the readings obtained in step (c) to each other to detect indices of a tank leak; and (e) utilizing gas chromatography in at least one of said boreholes indicating presence of leakage to identify volatile organic material therein.
Claim 10
Dependent Claim
12 words
The method of claim 6 wherein the boreholes extend below the tank.
Claim 11
Dependent Claim
39 words
The method of claim 6 wherein said correlating comprises establishing a base reading of said gauge indicating presence of non-leaking volatile organic material, and establishing a certain ratio above said base reading as indices of leaking volatile organic material.
Claim 12
Dependent Claim
26 words
The method of claim 6 wherein gas chromatography is utilized in all of the boreholes indicating presence of leakage to identify the volatile organic material therein.