US5062484A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method of gravel packing a subterranean well
Assignee: Marathon Oil Co
•
Filing: 1990-08-24
•
Granted: 1991-11-05
•
Expires: 2010-08-24
Abstract
Abstract A method of gravel packaging a well penetrating and in fluid communication with a subterranean formation or zone by sealing the apertures of a gravel pack liner, except near the bottom of the liner, against entry of slurry fluid. This prevents gravel from clogging the apertures or bridging the annulus between the liner and the well bore. An immobile gel provides the sealing function, and a breaker eventually breaks the gel, thereby permitting removal of the gel and unblocking the apertures. The gel is formed from a suitable liquid composition containing the gel breaker, and may be applied to the liner prior to lowering the liner and wash pipe into the well bore.
Inventors
- 👤 Donald E. Schroeder, Jr.
- 👤 David O. Falk
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-09 03:43
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/02; E21B43/08; E21B43/088; C; C09; C09K; C09K8/00; C09K8/60; C09K8/84; C09K8/86; C09K8/88; C09K8/887; E21B43/04; E21B43/045
Claims Analysis
Total Claims: 28
Claim 1
Independent Claim
99 words
A method of gravel packing a well bore penetrating a subterranean formation comprising: blocking a first group of apertures in a liner with an immobile gel; positioning said liner within the well bore thereby defining a first annulus between said liner and the well bore; transporting a slurry comprised of gravel suspended in a fluid into said first annulus, said fluid flowing through a second group of apertures in said liner while said gravel is deposited within said first annulus to form a gravel pack; and thereafter removing substantially all of said gel from said first group of apertures.
Claim 2
Independent Claim
99 words
A method of gravel packing a well bore penetrating a subterranean formation comprising: blocking a first group of apertures in a liner with an immobile gel; positioning said liner within the well bore thereby defining a first annulus between said liner and the well bore; transporting a slurry comprised of gravel suspended in a fluid into said first annulus, said fluid flowing through a second group of apertures in said liner while said gravel is deposited within said first annulus to form a gravel pack; and thereafter removing substantially all of said gel from said first group of apertures.
Claim 3
Dependent Claim
23 words
The method of claim 1 wherein said gel is removed from said first group of apertures by breaking the gel to a liquid.
Claim 4
Dependent Claim
27 words
The method of claim 1 wherein said first group of apertures are located above said second group of apertures when said liner is positioned within the well.
Claim 5
Dependent Claim
29 words
The method of claim 1 further comprising: positioning a wash pipe within said liner thereby defining a second annulus therebetween, said immobile gel being positioned in said second annulus.
Claim 6
Dependent Claim
23 words
The method of claim 4 wherein said gel is removed from said first group of apertures by breaking the gel to a liquid.
Claim 7
Dependent Claim
20 words
The method of claim 4 wherein the gel comprises a carboxylate-containing polymer crosslinked with a chromic carboxylate complex crosslinking agent.
Claim 8
Dependent Claim
12 words
The method of claim 6 wherein the polymer is an acrylamide polymer.
Claim 9
Dependent Claim
27 words
The method of claim 7 wherein the polymer is a polymer selected from polyacrylamide or partially hydrolyzed polyacrylamide, and the crosslinking agent comprises a chromic acetate complex.
Claim 10
Dependent Claim
35 words
The method of claim 1 wherein said liner has a screen secured thereto and positioned to cover said first and said second group of apertures, said immobile gel positioned between said screen and said liner.
Claim 11
Dependent Claim
23 words
The method of claim 9 wherein said gel is removed from said first group of apertures by breaking the gel to a liquid.
Claim 12
Dependent Claim
20 words
The method of claim 9 wherein the gel comprises a carboxylatecontaining polymer crosslinked with a chromic carboxylate complex crosslinking agent.
Claim 13
Dependent Claim
12 words
The method of claim 11 wherein the polymer is an acrylamide polymer.
Claim 14
Dependent Claim
27 words
The method of claim 12 wherein the polymer is a polymer selected from polyacrylamide or partially hydrolyzed polyacrylamide, and the crosslinking agent comprises a chromic acetate complex.
Claim 15
Dependent Claim
184 words
In a method of gravel packing a well bore in a subterranean fluid-producing zone wherein a tubular liner having apertures therein is positioned within the well bore so as to define a first annulus therebetween, a crossover tool is provided for directing a slurry of gravel to the first annulus, and a wash pipe is positioned within the liner so as to define a second annulus therebetween, the improvement comprising: providing an immobile gel above a predetermined point along the length of the liner to block the apertures above said predetermined point against the flow of fluid therethrough, leaving unblocked the apertures in the liner below said predetermined point, the immobile gel containing a gel breaker capable of breaking the gel to liquid form; introducing a slurry comprising gravel suspended in a fluid into the first annulus, the fluid of the slurry flowing through the unblocked apertures and into the wash pipe and the gravel of the slurry being deposited in the first annulus; allowing the gel breaker to break the immobile gel to a liquid; and removing the liquid from the block apertures.
Claim 16
Dependent Claim
184 words
In a method of gravel packing a well bore in a subterranean fluid-producing zone wherein a tubular liner having apertures therein is positioned within the well bore so as to define a first annulus therebetween, a crossover tool is provided for directing a slurry of gravel to the first annulus, and a wash pipe is positioned within the liner so as to define a second annulus therebetween, the improvement comprising: providing an immobile gel above a predetermined point along the length of the liner to block the apertures above said predetermined point against the flow of fluid therethrough, leaving unblocked the apertures in the liner below said predetermined point, the immobile gel containing a gel breaker capable of breaking the gel to liquid form; introducing a slurry comprising gravel suspended in a fluid into the first annulus, the fluid of the slurry flowing through the unblocked apertures and into the wash pipe and the gravel of the slurry being deposited in the first annulus; allowing the gel breaker to break the immobile gel to a liquid; and removing the liquid from the block apertures.
Claim 17
Dependent Claim
15 words
The method of claim 14 wherein said immobile gel is positioned within the second annulus.
Claim 18
Dependent Claim
43 words
The method of claim 15 wherein the step of providing the immobile gel comprises: introducing a liquid composition capable of gelling to an immobile state into the second annulus, said liquid composition containing a gel breaker, and allowing the liquid composition to gel.
Claim 19
Dependent Claim
36 words
The method of claim 14 wherein the tubular liner has a screen secured thereto which covers the apertures, said immobile gel being positioned between the exterior of said screen and the interior of said tubular liner.
Claim 20
Dependent Claim
45 words
The method of claim 17 wherein the step of providing the immobile gel comprises: introducing a liquid composition capable of gelling to an immobile state between the screen and the liner, said liquid composition containing a gel breaker, and allowing the liquid composition to gel.
Claim 21
Dependent Claim
20 words
The method of claim 14 wherein the gel comprises a carboxylate-containing polymer crosslinked with a chromic carboxylate complex crosslinking agent.
Claim 22
Independent Claim
129 words
A method of gravel packing a well penetrating a subterranean zone comprising: positioning a wash pipe within a gravel pack liner having apertures therein; forming an immobile gel in an upper portion of an annular space which is adjacent to a gravel pack liner thereby blocking a first upper group of apertures in said liner to fluid flow; introducing a slurry comprising gravel suspended in a fluid into an annulus between the liner and the well, the slurry fluid flowing through a second lower group of apertures in said liner and into a wash pipe positioned within said liner, the gravel being deposited in the annulus between the liner and the well bore; causing the immobile gel to revert to a liquid; and removing the liquid from said liner.
Claim 23
Independent Claim
129 words
A method of gravel packing a well penetrating a subterranean zone comprising: positioning a wash pipe within a gravel pack liner having apertures therein; forming an immobile gel in an upper portion of an annular space which is adjacent to a gravel pack liner thereby blocking a first upper group of apertures in said liner to fluid flow; introducing a slurry comprising gravel suspended in a fluid into an annulus between the liner and the well, the slurry fluid flowing through a second lower group of apertures in said liner and into a wash pipe positioned within said liner, the gravel being deposited in the annulus between the liner and the well bore; causing the immobile gel to revert to a liquid; and removing the liquid from said liner.
Claim 24
Dependent Claim
17 words
The method of claim 20 wherein said annular space is between said liner and said wash pipe.
Claim 25
Dependent Claim
31 words
The method of claim 21 wherein said annular space is sealed at a point intermediate the length thereof to divide the annular space into an upper portion and a lower portion.
Claim 26
Dependent Claim
39 words
The method of claim 20 wherein a screen is secured to said liner to cover said first and said second group of apertures, said annular space being between the exterior of said screen and the interior of said liner.
Claim 27
Dependent Claim
22 words
The method of claim 20 wherein the gravel pack liner is positioned in the well bore after said immobile gel has matured.
Claim 28
Dependent Claim
32 words
The method of claim 20 wherein the immobile gel is caused to revert to the liquid by a gel breaker included in a liquid composition from which said immobile gel is matured.
References Cited (Backward Citations)
US3216497A
Cited
US3277962A
Cited
US3268001A
Cited
US3361203A
Cited
US3675717A
Cited
US3880233A
Cited
US3999608A
Cited
US4018283A
Cited
US4335788A
Cited
US4552215A
Cited
US4703799A
Cited
US4730674A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1994-11-04 | 1995-05-06 | 1995-11-05 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1998-11-04 | 1999-05-06 | 1999-11-05 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2002-11-04 | 2003-05-06 | 2003-11-05 | $7700.00 | Window Closed / Lapsed |