Claims Analysis
Total Claims: 9
Claim 1
Independent Claim
218 words
A method of treating a downhole formation in a horizontal or deviated wellbore having multiple zones of porosity comprising the steps of: step 1; flowing or pumping a carrier fluid downhole to the lowermost zone of porosity, thereby subjecting each of the multiple zones of porosity to the carrier fluid; step 2; admixing a blocking agent with said carrier fluid and thereby translocating the blocking agent to a location where the blocking agent is free to flow along the lower end of the borehole and seal the zones of porosity, wherein said blocking agent comprises a mixture of acid soluble material which is relatively insoluble in said carrier fluid; that is of a size to block the pores or fractures of the zones of porosity and thereby prevent or restrict flow into the zones; step 3; opening a selected zone of said multiple zones of porosity by spotting a solution of acid downhole within said selected zone of porosity to be opened whereby the solution of acid degrades the blocking agent and the solubilized blocking agent becomes admixed with the carrier fluid and is translocated from the borehole by the carrier fluid; step 4; conveying a treatment fluid to the selected zone downhole and pressuring the treatment fluid into the opened selected zone until the zone is treated.
Claim 2
Independent Claim
218 words
A method of treating a downhole formation in a horizontal or deviated wellbore having multiple zones of porosity comprising the steps of: step 1; flowing or pumping a carrier fluid downhole to the lowermost zone of porosity, thereby subjecting each of the multiple zones of porosity to the carrier fluid; step 2; admixing a blocking agent with said carrier fluid and thereby translocating the blocking agent to a location where the blocking agent is free to flow along the lower end of the borehole and seal the zones of porosity, wherein said blocking agent comprises a mixture of acid soluble material which is relatively insoluble in said carrier fluid; that is of a size to block the pores or fractures of the zones of porosity and thereby prevent or restrict flow into the zones; step 3; opening a selected zone of said multiple zones of porosity by spotting a solution of acid downhole within said selected zone of porosity to be opened whereby the solution of acid degrades the blocking agent and the solubilized blocking agent becomes admixed with the carrier fluid and is translocated from the borehole by the carrier fluid; step 4; conveying a treatment fluid to the selected zone downhole and pressuring the treatment fluid into the opened selected zone until the zone is treated.
Claim 3
Dependent Claim
39 words
The method of claim 1 wherein the zone treated is again blocked with the acid soluble material and the process of claim 1 steps 3 and 4 are repeated to discretely treat a second selected zone of the borehole.
Claim 4
Dependent Claim
47 words
The method of claim 2 wherein the second zone treated is again blocked with acid soluble material and the process of claim 2 repeated to discretely treat a third selected zone of the borehole and, a plurality of selected zones of wellbore are treated using this method.
Claim 5
Dependent Claim
51 words
The method of claim 1 and further including the steps of leaving the zone treated unblocked and repeating the process of claim 1, steps 3 through 4 to treat a second zone using the artificially elevated pressure created by treatment of the first zone to thereby differentially treat the second zone.
Claim 6
Dependent Claim
19 words
The method of claim 4 and further including the steps of sequentially differentially treating a plurality of selected zones.
Claim 7
Independent Claim
215 words
A method of treating a downhole formation in a horizontal or deviated wellbore having multiple zones of porosity comprising the steps of: step 1; flowing or pumping a carrier fluid downhole to the lowermost zone of porosity, thereby subjecting each of the multiple zones of porosity to the carrier fluid; step 2; admixing a blocking agent with said carrier fluid and thereby translocating the blocking agent to a location where the blocking agent is free to flow along the lower end of the borehole and seal the zones of porosity, wherein said blocking agent comprises a mixture of acid soluble material which is relatively insoluble in said carrier fluid; that is of a size to block the pores or fractures of the zones of porosity and thereby prevent or restrict flow into the zones; step 3; opening a selected zone of said multiple zones of porosity by spotting a solution of acid downhole within said selected zone of porosity to be opened whereby the solution of acid degrades the blocking agent and the degraded blocking agent becomes admixed with the carrier fluid in each discrete zone of porosity; step 4; conveying a treatment fluid to the selected zone downhole and simultaneously forcing the treatment fluid into the opened selected zones until the zones are treated.
Claim 8
Independent Claim
215 words
A method of treating a downhole formation in a horizontal or deviated wellbore having multiple zones of porosity comprising the steps of: step 1; flowing or pumping a carrier fluid downhole to the lowermost zone of porosity, thereby subjecting each of the multiple zones of porosity to the carrier fluid; step 2; admixing a blocking agent with said carrier fluid and thereby translocating the blocking agent to a location where the blocking agent is free to flow along the lower end of the borehole and seal the zones of porosity, wherein said blocking agent comprises a mixture of acid soluble material which is relatively insoluble in said carrier fluid; that is of a size to block the pores or fractures of the zones of porosity and thereby prevent or restrict flow into the zones; step 3; opening a selected zone of said multiple zones of porosity by spotting a solution of acid downhole within said selected zone of porosity to be opened whereby the solution of acid degrades the blocking agent and the degraded blocking agent becomes admixed with the carrier fluid in each discrete zone of porosity; step 4; conveying a treatment fluid to the selected zone downhole and simultaneously forcing the treatment fluid into the opened selected zones until the zones are treated.
Claim 9
Dependent Claim
48 words
The method of claim 6 and further including the step of removing the residual blocking agent from the borehole by circulating a solution of acid in the borehole and into contact with the remaining acid soluble material and thereby solubilizing and enabling the removal of said blocking material.