← Back to Patent Explorer
US5434805A Expired / Lapsed US ⏱️ 0.0 years remaining

Test timing program automatic generator

Assignee: Mitsubishi Electric Corp
•
Filing: 1992-09-11
•
Granted: 1995-07-18
•
Expires: 2012-09-11
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A test timing condition setting program generator for automatically generating a test timing condition program. Waveforms indicating product inspection specifications are input using a waveform input editor, a timing value being attached to each waveform. Using the timing values, an intermediate data generation unit generates intermediate data. Though format of the intermediate data is converted into a test program format acceptable to a particular semiconductor tester by a translator, thereby automatically generating a source program of a test timing condition setting program.

Inventors

  • 👤 Sachiko Iwasaki

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 06:33
CPC Classifications
G; G01; G01R; G01R31/00; G01R31/28; G01R31/317; G01R31/3181; G01R31/3183; G01R31/318307; G01R31/318342; G01R31/319; G01R31/31903; G01R31/31912; G01R31/31917; G01R31/31922; G06; G06F; G06F2201/00; G06F2201/865

Claims Analysis

Total Claims: 10
Claim 1
Independent Claim 211 words
An automatic test timing condition setting program generator for automatically generating a test timing condition setting program which defines a test timing condition of a test program for a semiconductor device, comprising: input means for inputting product inspection specification data, said product inspection specification data being data describing to a timing of test signals which are given to said semiconductor device during a test of said semiconductor device, said product inspection specification data including set time data which defines a test start timing; memory means for storing information about a predetermined check item regarding which said product inspection specification data is checked; intermediate data generating means for checking said product inspection specification data which is inputted using said input means with regard to said check item which is stored in said memory means and, when said check item is satisfied, converting said product inspection specification data into intermediate data in accordance with said set time data, said intermediate data being written in terms of timing in which said test start timing is used as a reference timing; and conversion means for converting a format of said intermediate data into a test program format acceptable to a particular semiconductor tester thereby producing a source program of said test timing condition setting program.
Claim 2
Dependent Claim 211 words
An automatic test timing condition setting program generator for automatically generating a test timing condition setting program which defines a test timing condition of a test program for a semiconductor device, comprising: input means for inputting product inspection specification data, said product inspection specification data being data describing to a timing of test signals which are given to said semiconductor device during a test of said semiconductor device, said product inspection specification data including set time data which defines a test start timing; memory means for storing information about a predetermined check item regarding which said product inspection specification data is checked; intermediate data generating means for checking said product inspection specification data which is inputted using said input means with regard to said check item which is stored in said memory means and, when said check item is satisfied, converting said product inspection specification data into intermediate data in accordance with said set time data, said intermediate data being written in terms of timing in which said test start timing is used as a reference timing; and conversion means for converting a format of said intermediate data into a test program format acceptable to a particular semiconductor tester thereby producing a source program of said test timing condition setting program.
Claim 3
Dependent Claim 49 words
A device of claim 1, further comprising another memory means for storing format conversion data defining details of format conversion, wherein. said conversion means converts said format of said intermediate data into said test program format in accordance with said format conversion data stored in said another memory means.
Claim 4
Dependent Claim 14 words
A device of claim 1, wherein said semiconductor device comprises a memory integrated circuit.
Claim 5
Dependent Claim 82 words
A device of claim 1, wherein said input means includes a waveform input editor for inputting waveforms of said test signals, said waveforms of said test signal being inputted as image information; inspection standard information is attached to each one of said waveforms inputted as image information using said input means, said inspection standard information being indicative of a time duration between preselected timings; and said waveform input editor generates said product inspection specification data in accordance with said inspection standard information.
Claim 6
Dependent Claim 53 words
A device of claim 4, wherein said waveform input editor comprises: an input unit for inputting data on said waveforms and inspection standard information; and a product inspection specification generating unit for generating said product inspection specification data in accordance with said data on said inspection standard information inputted through said input unit.
Claim 7
Dependent Claim 33 words
A device of claim 5, wherein said product inspection specification generating unit further generates product inspection specification waveform data which is data on said waveforms to which said inspection standard information is attached.
Claim 8
Dependent Claim 65 words
A device of claim 1, wherein said test signals include a reference signal designated as a reference for timing division; and said intermediate data generating means carries out timing division of said test signals in such a manner that a timing of said timing division is in accordance with a timing of said reference signal, and generates said intermediate data suitable to said test signals.
Claim 9
Dependent Claim 60 words
A device of claim 7, wherein said intermediate data generating means checks said product inspection specification data for each said test signals as timing-divided to find whether said check item is satisfied, and if said check item is not satisfied, amends said product inspection specification data so that said check item can be satisfied and then produces said intermediate data.
Claim 10
Dependent Claim 13 words
A device of claim 7, wherein said reference signal comprises a strobe signal.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1998-07-17 1999-01-16 1999-07-18 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2002-07-17 2003-01-16 2003-07-18 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2006-07-17 2007-01-16 2007-07-18 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag