← Back to Patent Explorer
US5435391A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for fracturing and propping a formation

Assignee: Mobil Oil AS
•
Filing: 1994-08-05
•
Granted: 1995-07-25
•
Expires: 2014-08-05
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for fracturing and propping a thick and/or non-homogeneous fracture interval of a subterranean formation which is traversed by a wellbore. A workstring is lowered into the wellbore and a fracturing fluid is flowed into one end of the fracture interval annulus (i.e. that portion of the well annulus which lies adjacent the fracture interval) to initiate a fracture. The flow of fracturing fluid is ceased and a slurry containing proppants is flowed into said one end of the fracture interval annulus. During flow of fracturing fluid and slurry into said one end of the annulus, both are delivered through alternate flowpaths to different levels within said fracture interval. Alternate slugs of fracturing fluid and slurry is continued through the same end of the annulus until all of the levels or zones within the fracture interval have been fractured and propped and in some instances, also gravel-packed.

Inventors

  • 👤 Lloyd G. Jones

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 20:29
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/25; E21B43/26; E21B43/267; E21B43/14; E21B43/261

Claims Analysis

Total Claims: 16
Claim 1
Independent Claim 196 words
A method for fracturing and propping a fracture interval of a subterranean formation which is traversed by a wellbore, said method comprising: positioning a workstring in the wellbore to form a well annulus between said workstring and said wellbore; flowing a first slug of fracturing fluid into one end of that portion of said well annulus which lies adjacent to said fracture interval to thereby initiate a fracture in said fracture interval; ceasing the flow of fracturing fluid; flowing a first slug of slurry containing proppants into said one end of said fracture interval annulus to deposit said proppants in said fracture; ceasing flow of said slurry; flowing at least a second slug of fracturing fluid into said one end of said fracture interval annulus and delivering said fracturing fluid through alternate flowpaths to different levels within said fracture interval to thereby enlarge and extend said fracture or to initiate a new fracture in said fracture interval; ceasing the flow of said second slug of fracturing fluid; and flowing at least a second slug of slurry containing proppants into said one end of said fracture interval annulus to deposit proppants in said enlarged and extended fracture.
Claim 2
Independent Claim 196 words
A method for fracturing and propping a fracture interval of a subterranean formation which is traversed by a wellbore, said method comprising: positioning a workstring in the wellbore to form a well annulus between said workstring and said wellbore; flowing a first slug of fracturing fluid into one end of that portion of said well annulus which lies adjacent to said fracture interval to thereby initiate a fracture in said fracture interval; ceasing the flow of fracturing fluid; flowing a first slug of slurry containing proppants into said one end of said fracture interval annulus to deposit said proppants in said fracture; ceasing flow of said slurry; flowing at least a second slug of fracturing fluid into said one end of said fracture interval annulus and delivering said fracturing fluid through alternate flowpaths to different levels within said fracture interval to thereby enlarge and extend said fracture or to initiate a new fracture in said fracture interval; ceasing the flow of said second slug of fracturing fluid; and flowing at least a second slug of slurry containing proppants into said one end of said fracture interval annulus to deposit proppants in said enlarged and extended fracture.
Claim 3
Dependent Claim 18 words
The method of claim 1 wherein said one end is the upper end of said fracture interval annulus.
Claim 4
Dependent Claim 34 words
The method of claim 1 including: isolating said portion of said annulus which lies adjacent said fracture interval prior to flowing said fracturing fluid into at least one end of the fracture interval annulus.
Claim 5
Dependent Claim 49 words
The method of claim 3 wherein said workstring includes a cross-over and wherein said fracturing fluid and said slurry are alternately flowed down said workstring, out of said cross-over, and into the upper end of said isolated fracture interval annulus to thereby alternately fracture and prop said fracture interval.
Claim 6
Dependent Claim 42 words
The method of claim 4 wherein said alternate flowpaths are provided by shunt tubes which are spaced radially around said workstring and which extend through said fracture interval, each of said shunt tubes having inlet and outlet openings spaced along its length.
Claim 7
Dependent Claim 18 words
The method of claim 1 wherein said fracturing fluid is a fracturing gel and said proppants are sand.
Claim 8
Dependent Claim 34 words
The method of claim 1 including: continuing to alternate flow of fracturing fluid and slurry through said one end of said fracture interval until substantially the entire said fracture interval is fractured and propped.
Claim 9
Independent Claim 212 words
A method for fracturing, propping, and gravel-packing a fracture interval of a subterranean formation which is traversed by a wellbore, said method comprising: positioning a workstring in the wellbore to form a well annulus between said workstring and said wellbore, said workstring including a gravel pack screen which lies adjacent said fracture interval to form a fracture interval annulus when said workstring is in place within said wellbore; flowing a fist slug of fracturing fluid into one end of that portion of said well annulus which lies adjacent to said fracture interval to thereby initiate a fracture in said fracture interval; ceasing flow of said fracturing fluid; flowing a first slug of slurry containing proppants into said one end of said fracture interval annulus to deposit proppants in said fracture; ceasing flow of said slurry; flowing at least a second slug of fracturing fluid into said one end of said fracture interval annulus and delivering said fracturing fluid through alternate flowpaths to levels within said fracture interval to thereby enlarge and extend said fracture; ceasing flow of said second slug of fracturing fluid; and flowing at least a second slug of slurry containing proppants into said one end of said fracture interval annulus to deposit proppants in said enlarged and extended fracture.
Claim 10
Independent Claim 212 words
A method for fracturing, propping, and gravel-packing a fracture interval of a subterranean formation which is traversed by a wellbore, said method comprising: positioning a workstring in the wellbore to form a well annulus between said workstring and said wellbore, said workstring including a gravel pack screen which lies adjacent said fracture interval to form a fracture interval annulus when said workstring is in place within said wellbore; flowing a fist slug of fracturing fluid into one end of that portion of said well annulus which lies adjacent to said fracture interval to thereby initiate a fracture in said fracture interval; ceasing flow of said fracturing fluid; flowing a first slug of slurry containing proppants into said one end of said fracture interval annulus to deposit proppants in said fracture; ceasing flow of said slurry; flowing at least a second slug of fracturing fluid into said one end of said fracture interval annulus and delivering said fracturing fluid through alternate flowpaths to levels within said fracture interval to thereby enlarge and extend said fracture; ceasing flow of said second slug of fracturing fluid; and flowing at least a second slug of slurry containing proppants into said one end of said fracture interval annulus to deposit proppants in said enlarged and extended fracture.
Claim 11
Dependent Claim 18 words
The method of claim 8 wherein said one end is the upper end of said fracture interval annulus.
Claim 12
Dependent Claim 32 words
The method of claim 8 including: isolating said portion of said annulus which lies adjacent said fracture interval prior to flowing said fracturing fluid into one end of the fracture interval annulus.
Claim 13
Dependent Claim 47 words
The method of claim 10 wherein said workstring includes a cross-over and wherein said fracturing fluid and said slurry are alternately flowed down said workstring, out of said cross-over, and into the top of said isolated fracture interval annulus to thereby fracture and prop said fracture interval.
Claim 14
Dependent Claim 42 words
The method of claim 8 wherein said alternate flowpaths are provided by shunt tubes which are spaced radially around said workstring and which extend through said fracture interval, each of said shunt tubes having inlet and outlet openings spaced along its length.
Claim 15
Dependent Claim 18 words
The method of claim 8 wherein said fracturing fluid is a fracturing gel and said proppants are sand.
Claim 16
Dependent Claim 36 words
The method of claim 8 including: continuing to alternate flow of fracturing fluid and slurry through said one end of said fracture interval until substantially the entire said fracture interval is fractured, propped, and gravel packed.

References Cited (Backward Citations)

US3730273A Cited
US4867241A Cited
US4842068A Cited
US4945991A Cited
US5082052A Cited
US5113935A Cited
US5161613A Cited
US5161618A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1998-07-24 1999-01-23 1999-07-25 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2002-07-24 2003-01-23 2003-07-25 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2006-07-24 2007-01-23 2007-07-25 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag