US5484018A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method for accessing bypassed production zones
Assignee: Halliburton Co
•
Filing: 1994-08-16
•
Granted: 1996-01-16
•
Expires: 2014-08-16
Abstract
Abstract A method for establishing production of oil or gas from a secondary production zone which is above a primary production zone in a well in which a settable material is placed in the annulus between the casing and the tubing above the secondary production zone and allowed to set up, and the secondary zone is then perforated with a through-tubing perforating gun.
Inventors
- 👤 Travis W. Cavender
- 👤 Joseph R. Murphey
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 17:16
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/11; E21B43/116; E21B33/00; E21B33/10; E21B33/13; E21B33/14; E21B43/14
Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
189 words
A method for establishing production of oil or gas from a secondary production zone which is above a primary production zone in a well having a casing and a concentric production tubing with an annular space between the casing and the tubing, comprising isolating the primary production zone, perforating the tubing at a level below the secondary production zone and above the primary production zone to provide a circulation path including the tubing, the perforations and the annular space, circulating a completion fluid through said circulation path to clean the tubing and the annulus, pumping into the tubing an annulus pack-off treatment comprising, in sequence, a liquid spacer material having a relatively low density, a liquid settable material having a density greater than said spacer material and a second liquid spacer material having a density greater than the settable material, all of said materials having a density less than the completion fluid, placing the settable material in the annular space and allowing it to set up, and perforating the secondary zone with a through-tubing perforating gun, said settable material being positioned so that it is entirely above the perforations.
Claim 2
Independent Claim
189 words
A method for establishing production of oil or gas from a secondary production zone which is above a primary production zone in a well having a casing and a concentric production tubing with an annular space between the casing and the tubing, comprising isolating the primary production zone, perforating the tubing at a level below the secondary production zone and above the primary production zone to provide a circulation path including the tubing, the perforations and the annular space, circulating a completion fluid through said circulation path to clean the tubing and the annulus, pumping into the tubing an annulus pack-off treatment comprising, in sequence, a liquid spacer material having a relatively low density, a liquid settable material having a density greater than said spacer material and a second liquid spacer material having a density greater than the settable material, all of said materials having a density less than the completion fluid, placing the settable material in the annular space and allowing it to set up, and perforating the secondary zone with a through-tubing perforating gun, said settable material being positioned so that it is entirely above the perforations.
Claim 3
Independent Claim
128 words
A method for establishing production of oil or gas from a secondary production zone which is above a primary production zone in a well having a casing and a concentric production tubing with an annular space between the casing and the tubing, comprising placing a settable material in the annular space above the secondary production zone and allowing it to set up, and perforating the secondary zone through a portion of the annular space which is free of settable material with a through-tubing perforating gun, the settable material being pumped down the tubing, preceded by a spacer material which has a density less than the density of the settable material and followed by a spacer material which has a density greater than the density of the settable material.
Claim 4
Independent Claim
128 words
A method for establishing production of oil or gas from a secondary production zone which is above a primary production zone in a well having a casing and a concentric production tubing with an annular space between the casing and the tubing, comprising placing a settable material in the annular space above the secondary production zone and allowing it to set up, and perforating the secondary zone through a portion of the annular space which is free of settable material with a through-tubing perforating gun, the settable material being pumped down the tubing, preceded by a spacer material which has a density less than the density of the settable material and followed by a spacer material which has a density greater than the density of the settable material.
Claim 5
Dependent Claim
35 words
A method as defined by claim 2 in which a completion fluid having a density greater than the density of the spacer materials and the settable material is in the tubing and the annular space.
Claim 6
Independent Claim
115 words
A method for establishing production of oil or gas from a secondary production zone which is above a primary production zone in a well having a casing and a concentric production tubing with an annular space between the casing and the tubing, comprising forming perforations in the tubing at a level below the secondary zone, pumping a settable material downwardly through the tubing and through said perforations to the annular space above the secondary production zone, allowing the settable material to set up, and perforating the secondary zone with a through-tubing perforating gun prior to placing the settable material, and the settable material is pumped through the perforations to its position in the annular space.
Claim 7
Independent Claim
115 words
A method for establishing production of oil or gas from a secondary production zone which is above a primary production zone in a well having a casing and a concentric production tubing with an annular space between the casing and the tubing, comprising forming perforations in the tubing at a level below the secondary zone, pumping a settable material downwardly through the tubing and through said perforations to the annular space above the secondary production zone, allowing the settable material to set up, and perforating the secondary zone with a through-tubing perforating gun prior to placing the settable material, and the settable material is pumped through the perforations to its position in the annular space.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1999-01-15 | 1999-07-17 | 2000-01-16 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2003-01-15 | 2003-07-17 | 2004-01-16 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2007-01-15 | 2007-07-17 | 2008-01-16 | $7700.00 | Window Closed / Lapsed |