← Back to Patent Explorer
US5886980A Expired / Lapsed US ⏱️ 0.0 years remaining

Bit stream based connection admission control system

Assignee: Mitsubishi Electric Research Laboratories Inc
•
Filing: 1996-08-23
•
Granted: 1999-03-23
•
Expires: 2016-08-23
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In a cell switched network such as an ATM network, a connection admission ntrol system is provided to establish connections which guarantee user requested end-to-end cell transmission delay bounds. The subject system uses, a bit stream approach to model the worst case cell generation pattern of a connection and provides mechanisms to construct new bit streams after the original ones are delayed, multiplexed, demultiplexed, or filtered within a network. Given arriving bit streams at a queueing point, a system is provided to obtain the worst-case cell queueing delay which is used to check if a connection can be established with the requested delay bounds. In one embodiment, the subject system uses the CBR/VBR traffic models as defined in the ATM Forum Traffic Management Specification Version 4.0 to derive the worst-case bit stream for a connection and calculates the worst case queueing delay based on the conventional static priority First In First Out, or FIFO, cell transmission scheduling at switches. The subject invention provides a simple and efficient way to support real-time CBR/VBR services as defined by the ATM Forum over existing ATM networks without requiring a sophisticated cell transmission scheduling mechanism at switches.

Inventors

  • 👤 Qin Zheng

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 02:23
CPC Classifications
H; H04; H04L; H04L12/00; H04L12/54; H04L12/56; H04L12/5601; H04L12/5602; H04Q; H04Q11/00; H04Q11/04; H04Q11/0428; H04Q11/0478; H04L2012/5629; H04L2012/5631; H04L2012/5632; H04L2012/5638; H04L2012/5646; H04L2012/5649; H04L2012/5651

Claims Analysis

Total Claims: 5
Claim 1
Independent Claim 141 words
In an ATM network, a connection admission control system for setting up a connection to transfer cells from source to a destination over said network which guarantees user-requested end-to-end cell transmission delay bounds, comprising: a number of queuing points associated with said connection, each queuing point having a delay associated therewith dependent upon arriving traffic at said queuing point; means at said queuing point for providing a bit stream that describes a worst case for said traffic at said queuing point thereby to provide a worst case description; means at said queuing point for calculating the associated delay based on said worst case description for said traffic at said queuing point, thus to establish a worst case end-to-end transmission delay bound for said connection; and, means responsive to said calculated delay for determining whether or not said connection can be established.
Claim 2
Dependent Claim 141 words
In an ATM network, a connection admission control system for setting up a connection to transfer cells from source to a destination over said network which guarantees user-requested end-to-end cell transmission delay bounds, comprising: a number of queuing points associated with said connection, each queuing point having a delay associated therewith dependent upon arriving traffic at said queuing point; means at said queuing point for providing a bit stream that describes a worst case for said traffic at said queuing point thereby to provide a worst case description; means at said queuing point for calculating the associated delay based on said worst case description for said traffic at said queuing point, thus to establish a worst case end-to-end transmission delay bound for said connection; and, means responsive to said calculated delay for determining whether or not said connection can be established.
Claim 3
Dependent Claim 42 words
The admission control system of claim 1, wherein said connection is a CBR/VBR connection and wherein said means for providing said bit stream includes means for describing the worst case traffic parameters of a CBR/VBR connection for traffic at said queuing point.
Claim 4
Dependent Claim 42 words
The admission control system of claim 2, wherein said means for providing said bit stream includes means for generating a new bit stream after the one associated with said worst case description is delayed, multiplexed, demultiplexed, or filtered within the said network.
Claim 5
Dependent Claim 27 words
The system of claim 1 and further including means for altering said worst case bit stream if said calculated delay does not meet said user-requested delay bound.

References Cited (Backward Citations)

US4984264A Cited
US5050161A Cited
US5267232A Cited
US5274644A Cited
US5392280A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2002-03-22 2002-09-21 2003-03-23 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2006-03-22 2006-09-21 2007-03-23 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2010-03-22 2010-09-21 2011-03-23 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag