US6311772B1
Expired / Lapsed
US
⏱️ 0.0 years remaining
Hydrocarbon preparation system for open hole zonal isolation and control
Assignee: Baker Hughes Holdings LLC
•
Filing: 1999-10-26
•
Granted: 2001-11-06
•
Expires: 2019-10-26
Abstract
Abstract A system for enhancing hydrocarbon production in long and deviated subterranean wells. Gravel is placed in the annulus between the screen liner and the borehole, together with annular isolation elements. Selective flow control is achieved. Sequential control or commingled production is achievable from multiple producing intervals of the borehole. A differential valve is incorporated in the screen liner service string to allow for gravel placement across multiple screen-liner sections, separated by annular isolation elements in a continuous one stage placement operation, thereby reducing time and complexity of such operations.
Inventors
- 👤 Morten Myhre
- 👤 Benn A. Voll
- 👤 Martin P. Coronado
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-24 18:34
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/02; E21B43/08; E21B33/00; E21B33/10; E21B33/12; E21B33/124; E21B43/04; E21B43/045; E21B43/10; E21B43/14
Claims Analysis
Total Claims: 20
Claim 1
Independent Claim
87 words
A hydrocarbon production system comprising: a borehole in a hydrocarbon containing formation; a continuous, one stage, gravel pack having a plurality of isolated zones; at least one annular seal located between at least two zones of said plurality of zones; and a valve and seal located upstream of said at least one annular seal, said valve selectively allowing through passage of fluid from an annulus outside of a pipe upon which said at least one annular seal is located and to a space inside of said pipe.
Claim 2
Dependent Claim
87 words
A hydrocarbon production system comprising: a borehole in a hydrocarbon containing formation; a continuous, one stage, gravel pack having a plurality of isolated zones; at least one annular seal located between at least two zones of said plurality of zones; and a valve and seal located upstream of said at least one annular seal, said valve selectively allowing through passage of fluid from an annulus outside of a pipe upon which said at least one annular seal is located and to a space inside of said pipe.
Claim 3
Dependent Claim
22 words
A hydrocarbon production system as claimed in claim 1 wherein said valve and seal are adjacent said at least one annular seal.
Claim 4
Dependent Claim
47 words
A hydrocarbon production system as claimed in claim 2 wherein said gravel pack exists both upstream and downstream of said at least one annular seal while said at least one annular seal is free from said gravel pack and sealed against a formation wall or a casing.
Claim 5
Dependent Claim
26 words
A hydrocarbon production system as claimed in claim 3 wherein said at least one annular seal is an external casing packer or an open hole packer.
Claim 6
Dependent Claim
18 words
A hydrocarbon production system as claimed in claim 1 wherein said plurality of isolated zones are individually isolatable.
Claim 7
Dependent Claim
24 words
A hydrocarbon production system as claimed in claim 5 wherein each said at least one annular seal is adjacent a downhole blank pipe section.
Claim 8
Dependent Claim
21 words
A hydrocarbon production system as claimed in claim 6 wherein said valve of said valve and seal is selected pressure operable.
Claim 9
Dependent Claim
59 words
A gravel packing system to create a zonally isolated gravel pack comprising: a base pipe; a washpipe disposed within said basepipe a seal spanning an annulus between said basepipe and said washpipe a flow port communicating between a void defined within said washpipe and said annulus and located uphole of said seal; and a valve controlling said flow port.
Claim 10
Dependent Claim
59 words
A gravel packing system to create a zonally isolated gravel pack comprising: a base pipe; a washpipe disposed within said basepipe a seal spanning an annulus between said basepipe and said washpipe a flow port communicating between a void defined within said washpipe and said annulus and located uphole of said seal; and a valve controlling said flow port.
Claim 11
Dependent Claim
13 words
A system as claimed in claim 8 wherein said valve is hydraulically controlled.
Claim 12
Dependent Claim
18 words
A system as claimed in claim 9 wherein said valve includes a closure member connected to a piston.
Claim 13
Dependent Claim
48 words
A system as claimed in claim 10 wherein said piston bifurcates a chamber and one side of said chamber is exposed to pressure on a downhole side of said seal while a second side of said chamber is exposed to pressure on an uphole side of said seal.
Claim 14
Dependent Claim
40 words
A system as claimed in claim 11 wherein said valve opens said flow port when said pressure on the uphole side of the seal is greater than the pressure on the downhole side of the seal by a selected amount.
Claim 15
Dependent Claim
23 words
A gravel packing system as claimed in claim 8 wherein said gravel packing system allows selective control of pressure drop in individual zones.
Claim 16
Independent Claim
132 words
A method for building a gravel pack around an annular seal while leaving the annular seal unpacked comprising: installing a slotted base pipe having an annular seal mounted thereon; installing a washpipe inside said base pipe, said washpipe having an open end, and an openable valve; installing a seal in an annulus defined by said washpipe and said base pipe, said seal being located between said openable valve and said end of said washpipe, said seal being located radially inwardly of said annular seal; pumping gravel until a pressure differential in an annular area uphole of said seal is a predetermined amount greater than a pressure in an annular area downhole of said seal; opening said valve in response to said pressure differential and pumping gravel until said gravel pack is completed.
Claim 17
Independent Claim
132 words
A method for building a gravel pack around an annular seal while leaving the annular seal unpacked comprising: installing a slotted base pipe having an annular seal mounted thereon; installing a washpipe inside said base pipe, said washpipe having an open end, and an openable valve; installing a seal in an annulus defined by said washpipe and said base pipe, said seal being located between said openable valve and said end of said washpipe, said seal being located radially inwardly of said annular seal; pumping gravel until a pressure differential in an annular area uphole of said seal is a predetermined amount greater than a pressure in an annular area downhole of said seal; opening said valve in response to said pressure differential and pumping gravel until said gravel pack is completed.
Claim 18
Dependent Claim
14 words
A method as claimed in claim 14 wherein said opening said valve is automatic.
Claim 19
Dependent Claim
22 words
A method as claimed in claim 15 wherein said valve is piston operated and said pressure differential causes said valve to open.
Claim 20
Dependent Claim
30 words
A method for building a gravel pack as claimed in claim 14 wherein gravel in said pack skips over said annular seal leaving said annular seal substantially clear of gravel.
References Cited (Backward Citations)
US3710862A
Cited
US4105069A
Cited
US4273190A
Cited
US4401158A
Cited
US4341266A
Cited
US4627488A
Cited
US5211234A
Cited
US5333688A
Cited
US5375661A
Cited
US5392850A
Cited
US5921318A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 2004-11-05 | 2005-05-07 | 2005-11-06 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2008-11-05 | 2009-05-07 | 2009-11-06 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2012-11-05 | 2013-05-07 | 2013-11-06 | $7700.00 | Window Closed / Lapsed |