Recuperator for thermal power installation
Abstract
Abstract A recuperator ( 10 ) in a thermal power installation such as, for example, a gas turbine installation or air storage power installation, having turbines ( 15 a, 15 b ) and a generator (G), has sectors (S 1 -S 4 ) with tubes for the circulation of air. Hot exhaust gases from the turbines ( 15 a, 15 b ) are supplied to the recuperator ( 10 ) for the purpose of heating the air flowing through the sectors (S 1 -S 4 ). According to the invention, the recuperator ( 10 ) has one or a plurality of external heat storage devices (HS 1, HS 2, HS 3 ) which are connected between the (S 1 -S 4 ) of the recuperator ( 10 ) and are heated during the normal operation of the power installation. During an outage period of the power installation, air is circulated through the installation components ( 10, 15 a, 15 b, 19 ), a temperature distribution being maintained in these components with temperature differences which are smaller than a critical magnitude with respect to transient thermal stresses in the components of the recuperator. After an outage period, the power installation can be started up to full load in a short time and without risk with respect to transient thermal stresses in the recuperator ( 10 ), turbines ( 15 a, 15 b ) and combustion chamber ( 19 ).
Inventors
- 👤 Franz Kreitmeier
Bibliographic Details
Claims Analysis
Total Claims: 7References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 2007-02-23 | 2007-08-25 | 2008-02-24 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2011-02-23 | 2011-08-25 | 2012-02-24 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2015-02-23 | 2015-08-25 | 2016-02-24 | $7700.00 | Window Closed / Lapsed |