← Back to Patent Explorer
US7520326B1 Expired / Lapsed US ⏱️ 0.0 years remaining

Method and apparatus for performing down hole sand and gravel fracture packing operations

Assignee: SUPREME SERVICES & SPEC Co Inc
•
Filing: 2005-02-09
•
Granted: 2009-04-21
•
Expires: 2025-02-09
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An in-tubing or casing fracture packing assembly including a running tool, HDR sub assembly, a displaceable flow diversion valve by which a filter media slurry is pumped down the annulus of the assembly until a gravel pack is achieved. The HDR running tool allows the bottom hole assembly to be deployed without fear of premature release due to loads or manipulation during deployment, but allows for easy detachment once pumping is completed. An equalizing vent in the HDR sub assembly maintains equal pressure internally and externally. The flow diversion valve is autonomously tripped when the media has been properly placed, providing a positive indication at the surface. A portion of the assembly is removed and the packing assembly remains within the well bore after pumping is completed. An isolation seal is then placed on the sealing mandrel of the assembly and isolated to the tubing or casing wall.

Inventors

  • 👤 Ron C. Hill
  • 👤 Darrin T. Patin

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 16:00
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/02; E21B43/04; E21B43/045; E21B43/25; E21B43/26; E21B43/261

Claims Analysis

Total Claims: 22
Claim 1
Independent Claim 123 words
A down hole high density/high rate (HDR) completion tool assembly for use with fracture packing assemblies comprising: a) a tubular assembly having a production screen assembly including a bull plug attached at one end; b) a section of blank pipe and a centralizing sub joint attached to a flow diversion valve assembly; and c) a sealing mandrel attached to the centralizing sub joint; d) a equalizing vent assembly located above said production screen assembly detachable from said sealing mandrel; and e) a flow diversion valve assembly located between said production screen assembly and said retrievable equalizing vent assembly having a displaceable float insert assembly having a captured float therein said float insert assembly displaceable from said valve assembly to within said bull plug.
Claim 2
Dependent Claim 123 words
A down hole high density/high rate (HDR) completion tool assembly for use with fracture packing assemblies comprising: a) a tubular assembly having a production screen assembly including a bull plug attached at one end; b) a section of blank pipe and a centralizing sub joint attached to a flow diversion valve assembly; and c) a sealing mandrel attached to the centralizing sub joint; d) a equalizing vent assembly located above said production screen assembly detachable from said sealing mandrel; and e) a flow diversion valve assembly located between said production screen assembly and said retrievable equalizing vent assembly having a displaceable float insert assembly having a captured float therein said float insert assembly displaceable from said valve assembly to within said bull plug.
Claim 3
Dependent Claim 89 words
The down hole high density/high rate (HDR) completion tool assembly according to claim 1 wherein said flow diversion valve assembly comprises: a) a tubular subsection having an internal landing shoulder and o-ring; and b) a removable tubular insert member open at one end and having a removable cage member at the opposite end the tubular insert slideably located within said tubular subsection said float located within the tubular insert member captured by the removable cage member; and a collar assembly attached to the tubular insert member by shear pins.
Claim 4
Dependent Claim 39 words
The down hole high density/high rate (HDR) completion tool-assembly according to claim 2 wherein said tubular insert member is supported within the tubular subsection by the collar assembly in contact with the landing shoulder located within the tubular subsection.
Claim 5
Dependent Claim 124 words
The down hole high density/high rate (HDR) completion tool assembly according to claim 1 wherein said retrievable equalizing vent assembly comprises: a) a top sub coupling; b) a rod member attached at one end to the top sub coupling; c) a releasable sub section housing the rod member slidable upon a portion of the top sub coupling; d) a vent section attached at one end to the releasable sub section housing; e) a colleted member attached to the vent section having a displaceable donut member located therein slidably upon an end of the rod member opposite the top sub; and f) a sealing mandrel having means at one end for connecting to the colleted member and a threaded coupling means at the opposite end.
Claim 6
Dependent Claim 24 words
The down hole high density/high rate (HDR) completion tool assembly according to claim 4 wherein said displaceable donut provides support for the colleted member.
Claim 7
Dependent Claim 150 words
A down hole high density and high rate (HDR) completion tool assembly comprising: a) a bull plug; b) a production sand screen assembly attached to the bull plug; c) a flow diversion valve assembly having a displaceable float insert assembly displaceable between said valve assembly and said bull plug said flow diversion valve assembly attached to an end of the production sand screen assembly opposite said bull plug; d) a section of blank pipe attached to the flow diversion valve assembly; e) a centralizing assembly attached to the section of blank pipe; f) a sealing mandrel attached to said centralizer; g) a venting assembly having collet means at one end and a retrieving means at the opposite end, and an equalizing vent screen portion detachably attached to the sealing mandrel with said collet means; and h) a HDR running tool connected to the e venting assembly by said retrieving means.
Claim 8
Dependent Claim 150 words
A down hole high density and high rate (HDR) completion tool assembly comprising: a) a bull plug; b) a production sand screen assembly attached to the bull plug; c) a flow diversion valve assembly having a displaceable float insert assembly displaceable between said valve assembly and said bull plug said flow diversion valve assembly attached to an end of the production sand screen assembly opposite said bull plug; d) a section of blank pipe attached to the flow diversion valve assembly; e) a centralizing assembly attached to the section of blank pipe; f) a sealing mandrel attached to said centralizer; g) a venting assembly having collet means at one end and a retrieving means at the opposite end, and an equalizing vent screen portion detachably attached to the sealing mandrel with said collet means; and h) a HDR running tool connected to the e venting assembly by said retrieving means.
Claim 9
Dependent Claim 90 words
The down hole high density/high rate (HDR) completion tool assembly according to claim 6 wherein said flow diversion valve assembly further comprises: a) a tubular subsection having an internal landing shoulder and o-ring; b) a removable tubular insert member open at one end and having a removable cage member at the opposite end the insert slidably located within said tubular subsection; c) a float located within the tubular insert member captured by the removable cage member; and d) a collar assembly attached to the tubular insert member by shear pins.
Claim 10
Dependent Claim 41 words
The down hole fracture high density/high rate (HDR) completion tool assembly according to claim 7 wherein said tubular insert member is supported within the tubular subsection by the collar assembly in contact with the landing shoulder located within the tubular subsection.
Claim 11
Dependent Claim 124 words
The down hole high density/high rate (HDR) completion tool assembly according to claim 6 wherein said HDR sub assembly further comprises: a) a top sub coupling b) a rod member attached at one end to the top sub coupling; c) a releasable sub section housing the rod and slidable upon a portion of the top sub coupling; d) an equalizing vent section attached at one end to the releasable sub section housing; e) a colleted member attached to said equalizing vent section having said displaceable donut member located therein slidable upon an end of the rod opposite the top sub; and f) a sealing mandrel having means at one end for connecting to the colleted member and threaded coupling means at the opposite end.
Claim 12
Dependent Claim 71 words
The down hole high density/high rate (HDR) completion tool assembly according to claim 6 wherein said HDR running tool further comprises: a) a tubular control mandrel having a threaded coupling at one end, release ports and a ball check assembly at the opposite end; b) a colleted member attached to the control mandrel adjacent the ball check assembly; and c) a housing slidable upon the control mandrel surrounding the colleted member.
Claim 13
Independent Claim 214 words
A method for locating, setting, and deploying a down hole high density/high rate (HDR) completion tool assembly for gravel packing operations in a well-bore comprising the steps of: a) assembling a gravel packing tool string comprising: i) a tubular assembly having a production assembly including a bull plug attached at one end; ii) an equalizing vent assembly; iii) an autonomous displaceable flow diversion valve assembly having an insert assembly displaceable from said diversion valve assembly to within said bull plug said valve assembly placed in between the production screen assembly and the equalizing vent assembly; iv) a section of blank pipe and a centralizing sub joint attached to the flow diversion valve assembly; and v) a detachable HDR sub assembly attached to the centralizing sub joint; b) locating the gravel packing tool string assembly within a well-bore at a point of interest; c) conveying a gravel slurry down-hole to the gravel packing tool string assembly until pressure within the displaceable flow diversion valve assembly increases sufficiently to displace said insert portion of the diversion valve assembly and pressure within the section of blank pipe is equalized; d) removing the detachable HDR sub assembly from the gravel packing tool string assembly; and e) attaching a well-bore sealing means to said gravel packing tool string assembly.
Claim 14
Independent Claim 214 words
A method for locating, setting, and deploying a down hole high density/high rate (HDR) completion tool assembly for gravel packing operations in a well-bore comprising the steps of: a) assembling a gravel packing tool string comprising: i) a tubular assembly having a production assembly including a bull plug attached at one end; ii) an equalizing vent assembly; iii) an autonomous displaceable flow diversion valve assembly having an insert assembly displaceable from said diversion valve assembly to within said bull plug said valve assembly placed in between the production screen assembly and the equalizing vent assembly; iv) a section of blank pipe and a centralizing sub joint attached to the flow diversion valve assembly; and v) a detachable HDR sub assembly attached to the centralizing sub joint; b) locating the gravel packing tool string assembly within a well-bore at a point of interest; c) conveying a gravel slurry down-hole to the gravel packing tool string assembly until pressure within the displaceable flow diversion valve assembly increases sufficiently to displace said insert portion of the diversion valve assembly and pressure within the section of blank pipe is equalized; d) removing the detachable HDR sub assembly from the gravel packing tool string assembly; and e) attaching a well-bore sealing means to said gravel packing tool string assembly.
Claim 15
Dependent Claim 32 words
The method according to claim 11 wherein displacement of the insert portion of the diversion valve assembly provides an unobstructed annular path through said displaceable flow diversion valve into the screen assembly.
Claim 16
Dependent Claim 64 words
The method according to claim 11 further including the steps of establishing a seal within the well bore above the centralizing sub joint after packing operations are complete and removing the equalizing vent portion, after fracture packing and before packer sealing operations thereby leaving the sealing mandrel, centralizing sub section of blank pipe and the production screen assembly in place within the well bore.
Claim 17
Dependent Claim 81 words
The method according to claim 11 further comprising the step of utilizing an HDR running tool to place the gravel pack assembly and remove the HDR equalizing vent sub assembly, the running tool comprising, a tubular control mandrel having a threaded coupling at one end, release ports, and a ball check assembly at the opposite end, a colleted member attached to the control mandrel adjacent the ball check assembly, and a housing slidable upon the control mandrel surrounding the colleted member.
Claim 18
Dependent Claim 162 words
The method according to claim 11 further comprising the step of utilizing an HDR e-line running tool to place the gravel pack assembly and remove the HDR equalizing vent sub assembly, the HDR e-line running tool comprising a rod housing having a sliding rod located therein, a control mandrel having an intermediate transverse slotted portion threadably connected externally to the housing at one end and having a threaded connecting portion at the opposite end, an adapter member having a transverse slot connected to the sliding rod slidable within said control mandrel, a traversing pin extending though the transverse slot in the adapter member and through the transverse slotted portion in the control mandrel, a colleted member threadably connected to the threaded conning portion of the control mandrel, a housing slidable upon the control mandrel surrounding the colleted member, and a cover sleeve slidable upon the control mandrel attached to the housing surrounding the colleted member for covering and retaining the traversing pin.
Claim 19
Independent Claim 202 words
A method for locating, setting, and deploying a down hole high density/high rate (HDR) completion tool assembly for gravel packing operations—in a well-bore comprising the steps of: a) placing a high density and high rate completion setting and placement tool assembly, comprising a retrievable HDR assembly having an equalizing vent screen portion and a production screen portion having seal mandrel section, and a flow diversion valve assembly having a displaceable float insert attached thereto located between said production screen assembly and said HDR assembly, on location within a zone of interest within a well bore; b) conveying a filter media from the surface down the well bore; c) surrounding the high density and high rate completion assembly and filling fractured areas within the zone; d) displacing said displaceable float insert assembly from within said flow diversion valve and thus relocating the float insert assembly to the opposite end of the production screen assembly, thereby establishing an unobstructed full bore flow though the production screen assembly; e) detaching the equalizing vent screen portion of the HDR assembly from the sealing mandrel and removing it from the well bore; and f) attaching a sealing overshot and pack-off assembly to the seal mandrel for production.
Claim 20
Independent Claim 202 words
A method for locating, setting, and deploying a down hole high density/high rate (HDR) completion tool assembly for gravel packing operations—in a well-bore comprising the steps of: a) placing a high density and high rate completion setting and placement tool assembly, comprising a retrievable HDR assembly having an equalizing vent screen portion and a production screen portion having seal mandrel section, and a flow diversion valve assembly having a displaceable float insert attached thereto located between said production screen assembly and said HDR assembly, on location within a zone of interest within a well bore; b) conveying a filter media from the surface down the well bore; c) surrounding the high density and high rate completion assembly and filling fractured areas within the zone; d) displacing said displaceable float insert assembly from within said flow diversion valve and thus relocating the float insert assembly to the opposite end of the production screen assembly, thereby establishing an unobstructed full bore flow though the production screen assembly; e) detaching the equalizing vent screen portion of the HDR assembly from the sealing mandrel and removing it from the well bore; and f) attaching a sealing overshot and pack-off assembly to the seal mandrel for production.
Claim 21
Dependent Claim 62 words
The method according to claim 16 further includes the step of leaving the production screen portion of the HDR assembly, comprising the sealing mandrel, centralizer sub, the flow diversion valve assembly with displaced float insert, production screen and bull plug within the well bore, after placing the filter media for use in production operations upon removal of the equalizing vent screen assembly.
Claim 22
Dependent Claim 19 words
The method according to claim 17 further includes the step of attaching an isolation assembly to the sealing mandrel.

References Cited (Backward Citations)

US4671361A Cited
US4915172A Cited
US4969524A Cited
US6364017B1 Cited
US20060108115A1 Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2012-04-20 2012-10-20 2013-04-21 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2016-04-20 2016-10-20 2017-04-21 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2020-04-20 2020-10-20 2021-04-21 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag