Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
220 words
A method of measuring the shear stress required at the walls of a well bore to erode drilling fluid deposits formed thereon as a result of the well bore containing a drilling fluid and penetrating one or more permeable formations, which method comprises the steps of: (a) introducing a drilling fluid into a test apparatus (20) having a permeable section (24,26) simulating a permeable section of a well bore: (b) maintaining said drilling fluid in a static state in said permeable section (24,26) at a pressure and for a time period such that drilling fluid deposits are formed therein; (c) circulating said drilling fluid through said permeable section (24,26) at progressively increasing flow rates and maintaining each of said flow rates for a time whereby a pressure drop of said drilling fluid through said permeable section stabilizes while measuring said flow rate, said pressure drop, the viscosity, the temperature and the density of said drilling fluid; (d) determining the stabilized pressure drop measured in step (c) below which no significant erosion of said deposits takes place by calculating and comparing the well bore size equivalents to said stabilized pressure drops; and (e) determining the minimum shear stress required to erode said drilling fluid deposits corresponding to the pressure drop below which no significant erosion takes place determined in step (d).
Claim 2
Dependent Claim
37 words
A method according to claim 1, which further comprises the step of determining the erodability of the drilling fluid deposits formed by said drilling fluid based on the minimum shear stress determined in accordance with step (e).
Claim 3
Dependent Claim
38 words
A method according to claim 1 or 2, wherein the drilling fluid is maintained in said permeable section (24,26) in a static state in accordance with step (b) for a time of from 4 hours to 48 hours.
Claim 4
Dependent Claim
42 words
A method according to claim 1,2 or 3. wherein the pressure at which the drilling fluid is maintained in said permeable section (24,26) in a static state in accordance with step (b), is from 100 to 500 psig (0.69 to 3.4MPa gauge).
Claim 5
Dependent Claim
75 words
A method according to claim 1,2,3 or 4, wherein introducing said drilling fluid into said test apparatus (20) in accordance with step (a) comprises circulating said drilling fluid through said permeable section (24,26) at a flow rate and for a time whereby the pressure drop of said drilling fluid through said permeable section (24,26) stabilizes prior to maintaining said drilling fluid in a static state in said permeable section (24,26) in accordance with step (b).
Claim 6
Dependent Claim
29 words
A method according to claim 5, wherein said flow rates at which said drilling fluid is circulated in steps (a) and (c) are from 0.5 bpm to 5 bpm.
Claim 7
Independent Claim
33 words
A method according to any of claims 1 to 6, wherein the drilling fluid is circulated through the permeable section (24,26) in accordance with step (c) at three or more progressive flow rates.
Claim 8
Independent Claim
121 words
A method according to any of claims 1 to 7, wherein the well bore size equivalents to the stabilized pressure drops are determined in accordance with step (d) based on the relationship: D e = 2fLV²ρ g c Δp wherein: D e is the equivalent diameter through which the drilling fluid is flowing; f is the friction factor of the drilling fluid based on the drilling fluid viscosity and temperature; L is the length of the flowing area; V is the velocity of the drilling fluid; ρ is the drilling fluid density; g c is the gravitational constant; and Δp is the stabilized pressure drop across the length of the flowing area (L); where the above variables are in consistent units.
Claim 9
Independent Claim
123 words
A method according to any of claims 1 to 8, wherein said minimum shear stress required to erode said drilling fluid deposits which occurs at the pressure drop below which no significant erosion takes place is determined in accordance with step (e) based on the relationship: τ w = D e Δp bne 4L wherein: τ w is the minimum shear stress at the wall required to erode said drilling fluid deposits; D e is the equivalent diameter through which the drilling fluid is flowing; ΔP bne is the pressure drop across the length of the flowing area (L) below which no significant erosion takes place; and L is the length of the flowing area; where the above variables are in consistent units.
Claim 10
Independent Claim
100 words
A method according to any of claims 1 to 9, wherein the erodability of the drilling fluid deposits formed by said drilling fluid is determined based on the relationship: E df = 1.991 X 10²⁴Aa (4a²)(12h²)τ w wherein: E df is the erodability of the drilling fluid deposits; τ w is the minimum shear stress at the wall required to erode the drilling fluid deposits; A is 3 x 10⁻²⁰ joules; a is the average radius of particles in the drilling fluid deposits; and h is the separation distance between particle surfaces; where the above variables are in consistent units.