Patent US3604386A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3604386A Expired / Lapsed US ⏱️ 0.0 years remaining

Automatic installation for the transversal balancing of a ship

Assignee: FILOTECNICA SALMOIRAGHI SpA
•
Filing: 1969-12-19
•
Granted: 1971-09-14
•
Expires: 1989-12-19
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In an automatic installation for balancing a ship by means of the so-called ''''balanced tanks'''' method, the actual rate of flow of the liquid being transferred from either tank to the other is measured through the pressure differential between the two tanks. The differential between the ''''ordered'''' rate of flow and the actual rate of flow is computed by a comparison circuit. The instantaneous value of the differential rate of flow is used for adjusting the rate of flow of the variable delivery pump which is inserted in a conduit connecting the two tanks serially.

Inventors

  • 👤 Edmondo Turci

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 15:43
CPC Classifications
B; B63; B63B; B63B39/00; B63B39/02; B63B39/03; G; G05; G05D; G05D1/00; G05D1/08; G05D1/0875

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 168 words
An automatic installation for transversally balancing a ship, of the kind comprising at least a couple of tanks situated on the same perpendicular to the longitudinal vertical plane of symmetry of the ship and at equal distances from said plane, said tanks containing a liquid which can be transferred from either tank to the other at an instantaneous rate of flow which is determined by a signal, called ordered rate of flow signal, which is a function of the angle of tilt, of the speed of tilt and the acceleration of tilt of the ship with respect to the balanced trim thereof, characterized in that it comprises means for measuring the actual rate of flow through said duct and converting it into a signal analog to the ordered rate of flow signal and comparing the signal thus obtained with said ordered rate of flow signal so as to obtain a differential signal whose instantaneous value determines the instantaneous actuated rate of flow as given by said pumping means.
Claim 2
Dependent Claim 168 words
An automatic installation for transversally balancing a ship, of the kind comprising at least a couple of tanks situated on the same perpendicular to the longitudinal vertical plane of symmetry of the ship and at equal distances from said plane, said tanks containing a liquid which can be transferred from either tank to the other at an instantaneous rate of flow which is determined by a signal, called ordered rate of flow signal, which is a function of the angle of tilt, of the speed of tilt and the acceleration of tilt of the ship with respect to the balanced trim thereof, characterized in that it comprises means for measuring the actual rate of flow through said duct and converting it into a signal analog to the ordered rate of flow signal and comparing the signal thus obtained with said ordered rate of flow signal so as to obtain a differential signal whose instantaneous value determines the instantaneous actuated rate of flow as given by said pumping means.
Claim 3
Dependent Claim 50 words
An automatic installation according to claim 1, characterized in that the function of transfer between said actual rate of flow and the signal which can be compared with said ordered rate of flow signal is the inverse of the function between said differential signal and said actual rate of flow.
Claim 4
Dependent Claim 30 words
An automatic installation according to claim 3, characterized in that the measurement of the actual rate of flow is obtained by differentiation of the pressure differential between the two tanks.
Claim 5
Dependent Claim 56 words
An automatic installation according to claim 3, characterized in that said measurement is taken by means of an electronic device comprising a differential amplifier and a differentiator connected to one another in a cascade connection, the inputs of said differential amplifier being fed with signals obtained by translating the pressures in each of said two tanks.
Claim 6
Dependent Claim 26 words
An automatic installation according to claim 4, characterized in that the output signal of said differentiator is applied as a modulating signal to an AC-fed modulator.
Claim 7
Dependent Claim 20 words
An automatic installation according to claim 5, characterized in that the modulated signal issuing from said modulator is power amplified.
Claim 8
Dependent Claim 50 words
An automatic installation according to claims 1 to 6, characterized in that the rate-of-flow signal is derived from the tilt angle, the tilting speed and the Tilt acceleration of the ship by mixing the signals issuing from a bank indicator, a gyroscope and an angular accelerometer installed on said ship.

References Cited (Backward Citations)

US3306247A Cited
FR1470048A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1974-09-13 1975-03-15 1975-09-14 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1978-09-13 1979-03-15 1979-09-14 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1982-09-13 1983-03-15 1983-09-14 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag