Method for surfacing poured material
Assignee: EUGENE T MCKIE
•
Filing: 1970-08-26
•
Granted: 1972-08-01
•
Expires: 1990-08-26
Abstract
Abstract A method for surfacing poured concrete material to make a slab with less manual labor and more strength by vibrating a straight edge guided at the proper height and supported on the building structure. The apparatus comprises vibrating straight edge for surfacing low slump concrete mix with less manual effort.
Inventors
- 👤 Eugene T Mckie
- 👤 John E Hamilton
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-31 19:50
CPC Classifications
E; E04; E04G; E04G21/00; E04G21/02; E04G21/10; E04F; E04F21/00; E04F21/02; E04F21/04
Claims Analysis
Total Claims: 8
Claim 1
Independent Claim
179 words
In a method for constructing a slab of synthetic material, such as concrete, at a predetermined elevation vertically spaced above a supporting surface, including the steps of: a. providing a plurality of laterally spaced support columns extending vertically upward from said supporting surface; b. supporting a material retaining floor form means between said vertically extending support columns adjacent said predetermined elevation above said supporting surface and below the ends of said columns; c. clamping laterally spaced guide rails onto said vertically extending support columns in substantially parallel relationship and at a predetermined vertically spaced elevation above said floor form means and independent of said form supporting means; d. pouring onto said floor form means an amount of workable synthetic materiaL sufficient to construct said slab; e. supporting a straight edge means from said guide rails at a position over and adjacent said poured material; and, f. manipulating said straight edge means along said guide rails into contact with and against said poured material a sufficient amount to work the top surface of said poured material to a predetermined elevation.
Claim 2
Dependent Claim
179 words
In a method for constructing a slab of synthetic material, such as concrete, at a predetermined elevation vertically spaced above a supporting surface, including the steps of: a. providing a plurality of laterally spaced support columns extending vertically upward from said supporting surface; b. supporting a material retaining floor form means between said vertically extending support columns adjacent said predetermined elevation above said supporting surface and below the ends of said columns; c. clamping laterally spaced guide rails onto said vertically extending support columns in substantially parallel relationship and at a predetermined vertically spaced elevation above said floor form means and independent of said form supporting means; d. pouring onto said floor form means an amount of workable synthetic materiaL sufficient to construct said slab; e. supporting a straight edge means from said guide rails at a position over and adjacent said poured material; and, f. manipulating said straight edge means along said guide rails into contact with and against said poured material a sufficient amount to work the top surface of said poured material to a predetermined elevation.
Claim 3
Dependent Claim
39 words
In a method for constructing a slab of synthetic material as described in claim 1 further including the step of, power vibrating said straight edge means while working the top surface of said poured material to said predetermined elevation.
Claim 4
Dependent Claim
34 words
In a method for constructing a slab of synthetic material as described in claim 1 further including the step of, adjusting the elevation of said spaced guide rails independent of said form support means.
Claim 5
Dependent Claim
256 words
In a method for constructing a series of vertically spaced slabs of synthetic material, such as concrete, with each of said slabs being located at a predetermined elevation above a supporting surface, including the steps of: a. providing a plurality of laterally spaced support columns extending vertically upward from said supporting surface; b. supporting a material retaining floor form means between said vertically extending support columns adjacent a first predetermined elevation above said supporting surface and below the ends of said columns; c. clamping laterally spaced guide rails onto said vertically extending support columns in substantially parallel relationship and at a predetermined vertically spaced distance above said floor form means and independent of said form supporting means; d. pouring onto said floor form means an amount of workable synthetic material sufficient to construct said slab; e. supporting a straight edge means from said guide rails at a position over and adjacent said poured material; f. manipulating said straight edge means along said guide rails into contact with and against said poured material a sufficient amount to work the top surface of said poured material to a first predetermined elevation; g. extending said laterally spaced vertical support columns above said first predetermined elevation to a second predetermined elevation; h. supporting a material retaining floor form means between said extended vertical support columns adjacent said second predetermined elevation; i. repeating steps (c-f) until a second slab is constructed at said second predetermined elevation; and, j. repeating steps (g-i) until the desired number of vertically spaced slabs are constructed.
Claim 6
Dependent Claim
256 words
In a method for constructing a series of vertically spaced slabs of synthetic material, such as concrete, with each of said slabs being located at a predetermined elevation above a supporting surface, including the steps of: a. providing a plurality of laterally spaced support columns extending vertically upward from said supporting surface; b. supporting a material retaining floor form means between said vertically extending support columns adjacent a first predetermined elevation above said supporting surface and below the ends of said columns; c. clamping laterally spaced guide rails onto said vertically extending support columns in substantially parallel relationship and at a predetermined vertically spaced distance above said floor form means and independent of said form supporting means; d. pouring onto said floor form means an amount of workable synthetic material sufficient to construct said slab; e. supporting a straight edge means from said guide rails at a position over and adjacent said poured material; f. manipulating said straight edge means along said guide rails into contact with and against said poured material a sufficient amount to work the top surface of said poured material to a first predetermined elevation; g. extending said laterally spaced vertical support columns above said first predetermined elevation to a second predetermined elevation; h. supporting a material retaining floor form means between said extended vertical support columns adjacent said second predetermined elevation; i. repeating steps (c-f) until a second slab is constructed at said second predetermined elevation; and, j. repeating steps (g-i) until the desired number of vertically spaced slabs are constructed.
Claim 7
Dependent Claim
43 words
In a method for constructing a series of slabs of synthetic material as described in claim 4 further including the step of power vibrating said straight edge means while working the top surface of said poured material to said series of predetermined elevations.
Claim 8
Dependent Claim
41 words
In a method for constructing a series of slabs of synthetic material as described in claim 4 further including the step of, adjusting the elevation of said guide rails independent of said form support means at each of said predetermined elevations.
References Cited (Backward Citations)
US1498665A
Cited
US1549811A
Cited
US2197278A
Cited
US2671697A
Cited
US2940299A
Cited
US3095789A
Cited
CH352485A
Cited
US3284973A
Cited
US3319391A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1975-08-01 | 1976-01-31 | 1976-08-01 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1979-08-01 | 1980-01-31 | 1980-08-01 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1983-08-01 | 1984-01-31 | 1984-08-01 | $7700.00 | Window Closed / Lapsed |