US4409897A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Apparatus & method for selectively activating plural electrical loads at predetermined relative times
Assignee: Imperial Chemical Industries Ltd
•
Filing: 1981-10-01
•
Granted: 1983-10-18
•
Expires: 2001-10-01
Abstract
Abstract Separate electrical timing and load activation devices are provided for each of plural electrical loads and each device is connected to receive reference timing signals from a central unit. Each of the separate timing and load activation devices measures a reference time interval accurately defined by the reference timing signals and subsequently activates its associated electrical load after a respectively corresponding predetermined time delay which is determined as a function of the locally measured reference time interval.
Inventors
- 👤 Ian J. Kirby
- 👤 Michael I. Mitchell
- 👤 Andrew Stratton
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-30 20:13
CPC Classifications
H; H03; H03K; H03K5/00; H03K5/13; H03K5/131; F; F42; F42B; F42B3/00; F42B3/10; F42B3/12; F42B3/121; F42B3/122; F42D; F42D1/00; F42D1/04; F42D1/045; F42D1/05; F42D1/055; G; G01; G01V; G01V1/00; G01V1/02; G01V1/04; G01V1/06; G01V1/08; G04; G04F; G04F1/00; G04F1/005
Claims Analysis
Total Claims: 21
Claim 1
Independent Claim
100 words
A method for selectively activating a plurality of electrical loads at respectively corresponding predetermined relative times, said method comprising the steps of: generating reference timing signals at a central location; separately receiving and processing said reference timing signals at the site of each electrical load; said processing step at each site including the measurement of a respectively corresponding reference time interval defined by said reference timing signals and subsequently measuring a respectively corresponding predetermined time delay as a function of the earlier measured reference time interval; and activating each electrical load after its respectively corresponding predetermined time delay has elapsed.
Claim 2
Independent Claim
100 words
A method for selectively activating a plurality of electrical loads at respectively corresponding predetermined relative times, said method comprising the steps of: generating reference timing signals at a central location; separately receiving and processing said reference timing signals at the site of each electrical load; said processing step at each site including the measurement of a respectively corresponding reference time interval defined by said reference timing signals and subsequently measuring a respectively corresponding predetermined time delay as a function of the earlier measured reference time interval; and activating each electrical load after its respectively corresponding predetermined time delay has elapsed.
Claim 3
Dependent Claim
65 words
A method as in claim 1 further comprising the steps of: transmitting electrical energy from said central location to each of said sites in conjunction with the transmission of said reference timing signals, and receiving and storing said electrical energy at each of said sites, and using at least a portion of said stored energy at each site to activate the respectively associated electrical load.
Claim 4
Dependent Claim
29 words
A method as in claim 1 or 2 wherein the respectively corresponding predetermined time delays associated with each electrical load are all measured starting from a common reference time.
Claim 5
Dependent Claim
79 words
A method as in claim 1 or 2 wherein said reference timing signals comprise a sequence of accurately timed events and wherein said measurement step at each load site comprises: locally generating a source of clock pulses, counting clock pulses occurring between said first and second signals, and subsequently measuring said predetermined time delay by counting a number of clock pulses bearing a predetermined relationship to the number of clock pulses earlier counted between said first and second signals.
Claim 6
Dependent Claim
30 words
A method as in claim 1 or 2 wherein said electrical loads comprise electrical fuseheads disposed in blasting detonators whereby blasting charges are sequentially initiated at respectively corresponding relative times.
Claim 7
Independent Claim
120 words
A method of energizing an electrical load at a predetermined delay after a starting signal, said method comprising: feeding control signals at accurately timed intervals to a preset signal selecting system wherein two control signals characteristic of the desired delay are selected, generating first and second timing signals in response to each of said two selected control signals, feeding said first and second timing signals to timing means wherein the time interval between the said first and second timing signals is measured, generating a starting signal and, after a delay period from said starting signal that is determined by the time interval between said first and second timing signals as measured by the timing means, feeding energy to the load.
Claim 8
Independent Claim
120 words
A method of energizing an electrical load at a predetermined delay after a starting signal, said method comprising: feeding control signals at accurately timed intervals to a preset signal selecting system wherein two control signals characteristic of the desired delay are selected, generating first and second timing signals in response to each of said two selected control signals, feeding said first and second timing signals to timing means wherein the time interval between the said first and second timing signals is measured, generating a starting signal and, after a delay period from said starting signal that is determined by the time interval between said first and second timing signals as measured by the timing means, feeding energy to the load.
Claim 9
Dependent Claim
28 words
A method as in claim 6 wherein said control signals comprise accurately timed signals fed from a remote position to an expendable timing means adjacent to the load.
Claim 10
Dependent Claim
91 words
A method as in claim 6 or 7 wherein a series of electric fuseheads are energized in timed sequence by feeding said control signals simulatenously to a series of said signal selecting systems, each signal selecting system being associated with an individual electrical load of the series and preset individually to select two respectively corresponding control signals for each load in accordance with the desire energizing sequence whereby energy is fed successively to each load at a time determined by the interval between the particular control signals selected for the load.
Claim 11
Dependent Claim
74 words
A method as in claim 6 or 7 wherein said two characteristic control signals are selected by: counting the occurrences of control signals, determining when the count of control signals equals a first predetermined number thereby identifying the first characteristic control signal and generating the first timing signal, determining when the count of control signals equals a second predetermined number, said equality identifying the second characteristic control signal and generating the second timing signal.
Claim 12
Dependent Claim
21 words
A method as in claim 9 wherein said second predetermined number is the same for all of a series of loads.
Claim 13
Dependent Claim
31 words
A method as in claim 9 wherein said second predetermined number is greater than the first predetermined number by a respectively corresponding specified number for each of a series of loads.
Claim 14
Dependent Claim
62 words
A method as in claim 9 wherein said first predetermined numbers allocated to a series of loads comprise an ordered sequence of numbers and the second predetermined numbers for all loads have the same common value and the loads are energized in the numerical order of the complement of the first predetermined numbers relative to the common second predetermined number plus unity.
Claim 15
Dependent Claim
50 words
A method as in claim 9 wherein said first predetermined numbers allocated to a series of loads comprise an ordered sequence of numbers and the second predetermined numbers for all loads have the same common value and the loads are energized in the numerical order of the first predetermined numbers.
Claim 16
Dependent Claim
32 words
A method as in claim 9 wherein the counting of the control signals is performed by an electronic counter including preset means for determining when the count attains the said predetermined numbers.
Claim 17
Dependent Claim
132 words
A method as in claim 9 wherein the timing means comprises a clock pulse generator and a reversible counter adapted to count said clock pulses and the delay period between the starting signal and the energizing of the load is determined by: counting said clock pulses in one direction in response to the first timing signal, stopping said count in response to the second timing signal, generating the starting signal for the energizing sequence at a predetermined time after the second timing signal, starting a reverse count of clock pulses in response to said starting signal whereby the number of clock pulses is subtracted from the aforesaid number held in the counter, and feeding energy to the load when the count has returned to the count initially contained in the reversible counter.
Claim 18
Dependent Claim
39 words
A method as in claim 9 wherein said starting signal is generated by the occurrence of a predetermined control signal at a time later than the occurrence of the control signal from which the second timing signal is generated.
Claim 19
Dependent Claim
42 words
A method as in claim 6 or 7 wherein the energy for energizing the electrical load together with an additional energy required for the signal selecting system and timing means is supplied from a remote source of alternating or direct electrical current.
Claim 20
Dependent Claim
23 words
A method as in claim 17 wherein said control signals comprise interruptions of or modifications to said alternating or direct electrical current supply.
Claim 21
Dependent Claim
72 words
A method as in claim 17 wherein the load is an electrical fusehead and an energy store comprising a capacitor is charged from said source of alternating or direct current and is disposed adjacent to the fusehead, from which store the required energy is supplied even if the wires connecting the energy source to the fusehead assembly are broken after the generation of the starting signal but before the fusehead is fired.
References Cited (Backward Citations)
US2546686A
Cited
US3067684A
Cited
US3312869A
Cited
US3424924A
Cited
US3500746A
Cited
US3646371A
Cited
US3603844A
Cited
US3571605A
Cited
US3748955A
Cited
US3851589A
Cited
US4145970A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1986-10-17 | 1987-04-18 | 1987-10-18 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1990-10-17 | 1991-04-18 | 1991-10-18 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1994-10-17 | 1995-04-18 | 1995-10-18 | $7700.00 | Window Closed / Lapsed |