Patent US4445575A successfully refreshed from Google Patents.
US4445575A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Borehole cementing over water
Assignee: Atlantic Richfield Co
•
Filing: 1981-12-14
•
Granted: 1984-05-01
•
Expires: 2001-12-14
Abstract
Abstract A borehole cementing process in which a quantity of water-like fluid is pumped into a borehole above drilling mud and the cement slurry is pumped into the borehole above at least a portion of the water-like fluid. Turbulent mixing of cement slurry and water at the interface creates an isolation zone preventing degradation of the bulk of the cement slug.
Inventors
- 👤 Thomas K. Perkins
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 13:49
CPC Classifications
E; E21; E21B; E21B33/00; E21B33/10; E21B33/13
Claims Analysis
Total Claims: 6
Claim 1
Independent Claim
99 words
In a process of cementing a portion of a borehole where said borehole is filled, below the portion to be cemented, with drilling mud of lower density than the cement, the improvement comprising: pumping a quantity of water-like fluid into said borehole above said drilling mud, said quantity being sufficient to fill at least about fifty feet of said borehole below that portion of said borehole which is to be filled with cement, and pumping a quantity of cement into said borehole above the portion of said water-like fluid filling said at least about fifty feet of said borehole.
Claim 2
Dependent Claim
99 words
In a process of cementing a portion of a borehole where said borehole is filled, below the portion to be cemented, with drilling mud of lower density than the cement, the improvement comprising: pumping a quantity of water-like fluid into said borehole above said drilling mud, said quantity being sufficient to fill at least about fifty feet of said borehole below that portion of said borehole which is to be filled with cement, and pumping a quantity of cement into said borehole above the portion of said water-like fluid filling said at least about fifty feet of said borehole.
Claim 3
Dependent Claim
114 words
In a process of cementing a portion of a borehole where said borehole is filled, below the portion to be cemented, with drilling mud of lower density than the cement, the improvement comprising: pumping a quantity of water-like fluid sufficient to fill at least about fifty feet of said borehole down a casing positioned in said borehole with its lower end at least about fifty feet below said portion to be cemented while circulating fluid back up the annulus between said casing and said borehole, raising said casing at least about fifty feet, pumping a quantity of cement down said casing while circulating fluid back up the annulus between said casing and said borehole.
Claim 4
Dependent Claim
114 words
In a process of cementing a portion of a borehole where said borehole is filled, below the portion to be cemented, with drilling mud of lower density than the cement, the improvement comprising: pumping a quantity of water-like fluid sufficient to fill at least about fifty feet of said borehole down a casing positioned in said borehole with its lower end at least about fifty feet below said portion to be cemented while circulating fluid back up the annulus between said casing and said borehole, raising said casing at least about fifty feet, pumping a quantity of cement down said casing while circulating fluid back up the annulus between said casing and said borehole.
Claim 5
Dependent Claim
82 words
In a process of cementing a portion of a borehole where said borehole is filled, below the portion to be cemented, with drilling mud of lower density than the cement, the improvement comprising: pumping a quantity of water-like fluid down an annulus between a casing in said borehole and the borehole wall, said quantity of water-like fluid being sufficient to fill at least about fifty feet of said annulus, and pumping a quantity of cement down said annulus above said water-like fluid.
Claim 6
Dependent Claim
82 words
In a process of cementing a portion of a borehole where said borehole is filled, below the portion to be cemented, with drilling mud of lower density than the cement, the improvement comprising: pumping a quantity of water-like fluid down an annulus between a casing in said borehole and the borehole wall, said quantity of water-like fluid being sufficient to fill at least about fifty feet of said annulus, and pumping a quantity of cement down said annulus above said water-like fluid.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1987-05-01 | 1987-10-31 | 1988-05-01 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1991-05-01 | 1991-10-31 | 1992-05-01 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1995-05-01 | 1995-10-31 | 1996-05-01 | $7700.00 | Window Closed / Lapsed |