Patent US4780130A successfully refreshed from Google Patents.
US4780130A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Process to increase yield of fines in gas atomized metal powder using melt overpressure
Assignee: Verizon Laboratories Inc
•
Filing: 1987-07-22
•
Granted: 1988-10-25
•
Expires: 2007-07-22
Abstract
Abstract A method for increasing the yield of fine and ultrafine powder from a metal or metal alloy, including such high surface tension metals and alloys as copper, Fe-based alloys, Cu-Al-Fe alloys and Ni-Cr-Fe-B-Si alloys. A pressurized stream of molten metal is atomized by a cone of impinging gas streams, the apex of the gas cone being less than 50 mm from the melt outlet and 11-24 mm from the gas orifices. The gas velocity is greater than 100 m/sec, and the mass flow ratio of melt to gas is less than 0.10. The melt stream is pressurized by introducing pressurizing gas to an overpressure zone above the melt, e.g. in a sealed crucible.
Inventors
- 👤 Ramaswamy V. Raman
- 👤 Howard Surette
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-05 18:10
CPC Classifications
B; B22; B22F; B22F9/00; B22F9/02; B22F9/06; B22F9/08; B22F9/082; B22F2009/088
Claims Analysis
Total Claims: 14
Claim 1
Independent Claim
287 words
A method for producing powder from a metal or metal alloy comprising the steps of: delivering a metal or metal alloy melt from a crucible means having a 1-15 mm diameter melt delivery orifice in the bottom thereof to an atomizing zone through the melt delivery orifice as a generally vertically oriented melt stream at a melt mass flow rate M; providing an overpressure zone above the melt contained in the crucible means; directing one or more streams of atomizing gas at a total atomizing gas mass flow rate G and an atomizing gas velocity greater than or equal to 100 m/sec from an annular gas orifice means concentric with the melt orifice toward the melt stream, so that the gas streams converge to generally define a cone the apex of which coincides with the melt stream axis, and the gas streams impinge upon the melt stream at the atomizing zone at an average impingement angle of 20°-32.5° from the vertical to atomize the melt, wherein the apex of the gas stream cone is less than 50 mm from the melt orifice and 11-24 mm from the gas orifice means; establishing an initial pressure level in the overpressure zone and controlling the pressure level above the melt during atomization to establish and maintain a predetermined pressure P m of the melt measured at the melt delivery orifice and a predetermined melt mass flow rate M, so that P m is greater than P g , where P g is the pressure of the atomizing gas measured at the melt delivery orifice, and so that the ratio M/G is less than or equal to 0.10; and solidifying the atomized melt to produce a metal or metal alloy powder.
Claim 2
Independent Claim
287 words
A method for producing powder from a metal or metal alloy comprising the steps of: delivering a metal or metal alloy melt from a crucible means having a 1-15 mm diameter melt delivery orifice in the bottom thereof to an atomizing zone through the melt delivery orifice as a generally vertically oriented melt stream at a melt mass flow rate M; providing an overpressure zone above the melt contained in the crucible means; directing one or more streams of atomizing gas at a total atomizing gas mass flow rate G and an atomizing gas velocity greater than or equal to 100 m/sec from an annular gas orifice means concentric with the melt orifice toward the melt stream, so that the gas streams converge to generally define a cone the apex of which coincides with the melt stream axis, and the gas streams impinge upon the melt stream at the atomizing zone at an average impingement angle of 20°-32.5° from the vertical to atomize the melt, wherein the apex of the gas stream cone is less than 50 mm from the melt orifice and 11-24 mm from the gas orifice means; establishing an initial pressure level in the overpressure zone and controlling the pressure level above the melt during atomization to establish and maintain a predetermined pressure P m of the melt measured at the melt delivery orifice and a predetermined melt mass flow rate M, so that P m is greater than P g , where P g is the pressure of the atomizing gas measured at the melt delivery orifice, and so that the ratio M/G is less than or equal to 0.10; and solidifying the atomized melt to produce a metal or metal alloy powder.
Claim 3
Dependent Claim
105 words
A method according to claim 1 wherein: the step of establishing the initial overpressure zone pressure level comprises sealing the melt crucible from the surrounding atmosphere, including releasably sealing the melt delivery orifice to prevent melt flow therethrough, to provide the overpressure zone, and injecting a gas into the overpressure zone to establish the initial overpressure zone pressure level before the melt delivery orifice seal is released to allow melt flow; and the step of controlling the overpressure zone pressure level comprises adjusting the pressure level of the gas in the overpressure zone as needed during atomization to maintain the predetermined P m and M.
Claim 4
Dependent Claim
19 words
A method according to claim 2 wherein the initial overpressure zone pressure level is about 2 to 20 psig.
Claim 5
Dependent Claim
79 words
A method according to claim 2 wherein the melt delivery orifice comprises a melt delivery tube including a lower tip, the melt tube tip having a 1-15 mm diameter outlet and a tapered outer surface in the shape of an inverted truncated cone, the outer surface having a taper angle of about 20°-32.5° from the vertical and about 0°-5.0° less than the gas stream impingement angle; and P m and P g are measured at themelt tube tip outlet.
Claim 6
Dependent Claim
28 words
A method according to claim 4 wherein the gas orifice means is an annular gas nozzle including an annular gas jet slit concentric with the melt delivery tube.
Claim 7
Dependent Claim
33 words
A method according to claim 4 wherein the gas orifice means is an annular gas nozzle including an annular array, concentric with the melt delivery tube, of 12 or more gas jet orifices.
Claim 8
Dependent Claim
15 words
A method according to claim 4 wherein the atomizing gas is N 2 or Ar.
Claim 9
Dependent Claim
12 words
A method according to claim 4 wherein the atomizing gas is He.
Claim 10
Dependent Claim
13 words
A method according to claim 4 wherein the atomizing gas is forming gas.
Claim 11
Dependent Claim
17 words
A method according to claim 4 wherein the atomizing gas is a mixture of Ar and He.
Claim 12
Dependent Claim
33 words
A method according to claim 4 wherein the gas flow rate G is controlled by controlling the ga flow cross-sectional area and the pressure of the atomizing gas in the gas orifice means.
Claim 13
Dependent Claim
36 words
A method according to claim 11 wherein the pressure of the atomizing gas in the gas orifice means is about 7-144 atm, and the total gas flow area is about 5 to 15 mm 2 .
Claim 14
Dependent Claim
21 words
A method according to claim 4 wherein the apex of the gas stream cone is 10-21 mm from the melt orifice.
References Cited (Backward Citations)
US1635653A
Cited
US2402441A
Cited
GB609560A
Cited
US2997245A
Cited
US3344469A
Cited
US3253783A
Cited
BE666175A
Cited
US3430289A
Cited
US3501802A
Cited
US3639548A
Cited
US3533136A
Cited
US3592391A
Cited
US3752611A
Cited
US3695795A
Cited
US4021167A
Cited
US3817503A
Cited
US3901492A
Cited
JPS5123463A
Cited
US3988084A
Cited
US4272463A
Cited
US4080126A
Cited
GB2007129A
Cited
US4385878A
Cited
US4382903A
Cited
US4386896A
Cited
US4374633A
Cited
US4416600A
Cited
US4575325A
Cited
GB2154902A
Cited
US4619597A
Cited
US4631013A
Cited
US4632170A
Cited
US4619845A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1991-10-25 | 1992-04-25 | 1992-10-25 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1995-10-25 | 1996-04-25 | 1996-10-25 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1999-10-25 | 2000-04-25 | 2000-10-25 | $7700.00 | Window Closed / Lapsed |