Manufacturing process of porous resin mold containing continuous holes and casting mold
Abstract
Abstract The first invention relates to a novel manufacturing process of mold containing continuous holes and used for filter materials, gas dispersive materials, and mold materials. By this invention, the epoxy resin mixture including an epoxy compound having one or more epoxy groups in each molecule, a hardener which reacts with and hardens the epoxy compound, emulsifiers, water or water-surface active agent, and fillers respectively is used as the molding material. As the emulsifier, at least two kinds of three different kinds of nonionic emulsifiers of 4-8, 8-17, and 11-15.6 HLB respectively are used together. This is the primary feature of the invention and no molding materials including such emulsifiers are known so far. The molding material is cured to a desired shape to prepare a mold containing continuous holes and for molding, conventional methods such as hardening after casting, for example, are adopted. The second invention relates to a novel casting mold suitable be for slip discharge casting. By slip discharge casting, slip is supplied to the casting space of a mold having continuous holes, and the slip is pressurized to discharge the moisture content in the slip outside the casting mold to obtain hollow mold. The molding material used for this invention is prepared by process of the 1st invention so as to include 20-50 parts by weight of hardener to 100 parts by weight of the epoxy compound, 30 parts by weight or less of emulsifier to 100 parts by weight in total of the epoxy compound and the hardener, 1-20 parts by weight of water or water-surface active agent, and 30-75 parts by weight filler in the mixture used for molding. The casting mold of this invention can be obtained by curing the material for molding to a desired shape.
Inventors
- 👤 Saihachi Inoue
- 👤 Shigeru Kiriyama
- 👤 Kazuhiro Imada
Bibliographic Details
Claims Analysis
Total Claims: 9References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1991-11-08 | 1992-05-09 | 1992-11-08 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1995-11-08 | 1996-05-09 | 1996-11-08 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1999-11-08 | 2000-05-09 | 2000-11-08 | $7700.00 | Window Closed / Lapsed |