Claims Analysis
Total Claims: 44
Claim 1
Independent Claim
326 words
A gravel pack system for gravel packing a formation, which comprises: a screen assembly; a crossover assembly within said screen assembly, said screen assembly and crossover assembly forming interference collar and indicator collet means for positioning said crossover assembly within said screen assembly; said screen assembly comprising: a packer for setting and sealing said screen assembly within said well, a ported extension below said packer, a portion of said interference collar and indicator collet means disposed below said ported extension, and a production screen below said portion of said interference collar and indicator collet means; said crossover assembly comprising: a crossover means having an extension tube and outer cylinder for passing fluid downwardly through said extension tube to a lower port and outside said crossover assembly and for passing fluid upwardly through said outer cylinder to an upper port, a wash pipe section, another portion of said interference collar and indicator collet means disposed on said section, and a circulating valve, said circulating valve positioned between said outer cylinder and said wash pipe section for controlling passage of fluid from said wash pipe upwardly to said outer cylinder and upper port; said crossover assembly having a plurality of positions within said screen assembly including a lower circulating position for passing a gravel slurry through said extension tube and lower port and into the formation and returning fluid through said wash pipe section, outer cylinder and upper port, an upper squeeze position for passing a gravel slurry through said extension tube and lower port and forcing the gravel slurry into the formation by closing said circulation valve, and an upper circulating position for passing a gravel slurry through said extension tube and lower port and into the formation and returning fluid through said wash pipe section, outer cylinder and upper port; said interference collar and collet means positioning said crossover assembly within said screen assembly for each of said lower circulating, upper squeeze and upper circulating positions.
Claim 2
Dependent Claim
326 words
A gravel pack system for gravel packing a formation, which comprises: a screen assembly; a crossover assembly within said screen assembly, said screen assembly and crossover assembly forming interference collar and indicator collet means for positioning said crossover assembly within said screen assembly; said screen assembly comprising: a packer for setting and sealing said screen assembly within said well, a ported extension below said packer, a portion of said interference collar and indicator collet means disposed below said ported extension, and a production screen below said portion of said interference collar and indicator collet means; said crossover assembly comprising: a crossover means having an extension tube and outer cylinder for passing fluid downwardly through said extension tube to a lower port and outside said crossover assembly and for passing fluid upwardly through said outer cylinder to an upper port, a wash pipe section, another portion of said interference collar and indicator collet means disposed on said section, and a circulating valve, said circulating valve positioned between said outer cylinder and said wash pipe section for controlling passage of fluid from said wash pipe upwardly to said outer cylinder and upper port; said crossover assembly having a plurality of positions within said screen assembly including a lower circulating position for passing a gravel slurry through said extension tube and lower port and into the formation and returning fluid through said wash pipe section, outer cylinder and upper port, an upper squeeze position for passing a gravel slurry through said extension tube and lower port and forcing the gravel slurry into the formation by closing said circulation valve, and an upper circulating position for passing a gravel slurry through said extension tube and lower port and into the formation and returning fluid through said wash pipe section, outer cylinder and upper port; said interference collar and collet means positioning said crossover assembly within said screen assembly for each of said lower circulating, upper squeeze and upper circulating positions.
Claim 3
Dependent Claim
29 words
A gravel pack system according to claim 1 wherein said screen assembly further includes: a seal sub below said production screen, and a tattletale screen below said seal sub.
Claim 4
Dependent Claim
24 words
A gravel pack system according to claim 2 wherein said screen assembly further includes: a sump packer at the bottom of said screen assembly.
Claim 5
Dependent Claim
34 words
A gravel pack system according to claim 1 wherein said circulating valve includes: means for passage of fluid from inside said valve to outside said valve and back into the inside of said valve.
Claim 6
Dependent Claim
32 words
A gravel pack system according to claim 1 wherein said circulating valve includes: a tubular extension having ports; and a circulating body having seal means circumferentially around the outside of said valve.
Claim 7
Dependent Claim
52 words
The gravel pack system of claim 1 wherein said another portion of said interference collar and indicator collet means interferes with said portion of said interference collar and indicator collet means as said crossover assembly is positioned within said screen assembly to form said lower circulating, upper squeeze, and upper circulating positions.
Claim 8
Dependent Claim
40 words
The gravel pack system of claim 6 wherein one of said portions of said interference collar and indicator collet means is seated on the other of said portions at each of said lower circulating, upper squeeze, and upper circulating positions.
Claim 9
Dependent Claim
36 words
The gravel pack system of claim 6 wherein said portions of said interference collar and indicator means interfere a predetermined amount causing a predetermined amount of force to position said crossover assembly within said screen assembly.
Claim 10
Dependent Claim
87 words
A screen assembly for a gravel pack system within a well which comprises: a packer for setting and sealing said packer within a well, a ported extension disposed below said packer, a production screen disposed below said ported extension; a seal bore and interference collar means disposed below said ported extension and above said production screen, said seal bore and interference collar means having a plurality of seal bores and a plurality of interference collars, said interference collars disposed between said seal bores and said production screen.
Claim 11
Dependent Claim
87 words
A screen assembly for a gravel pack system within a well which comprises: a packer for setting and sealing said packer within a well, a ported extension disposed below said packer, a production screen disposed below said ported extension; a seal bore and interference collar means disposed below said ported extension and above said production screen, said seal bore and interference collar means having a plurality of seal bores and a plurality of interference collars, said interference collars disposed between said seal bores and said production screen.
Claim 12
Dependent Claim
26 words
A screen assembly according to claim 9 which further includes: a seal sub below said production screen, and a tell tale screen below said seal sub.
Claim 13
Dependent Claim
19 words
A screen assembly according to claim 10 which further includes: a sump packer at the bottom of said assembly.
Claim 14
Independent Claim
173 words
A method for gravel packing a formation in a well which comprises: running a screen assembly having a packer, crossover tool, and production screen into the wall and setting the packer above the formation to form an annulus adjacent the formation; sequentially raising the crossover tool to perform the steps of lower squeeze opening the flow of gravel to the annulus and formation and closing the production screen and the flow of returns to the surface; lower circulation opening the flow of gravel to the annulus and formation, maintaining the production screen closed, and opening the flow of returns to the surface; upper squeeze opening the flow of gravel to the annulus and formation and through the production screen and closing the flow of returns to the surface; upper circulation opening the flow of gravel to the annulus and formation and opening the production screen for flow of the returns to the surface; and reverse circulation closing the annulus and opening the crossover tool for the reverse flow of fluid to the surface.
Claim 15
Independent Claim
173 words
A method for gravel packing a formation in a well which comprises: running a screen assembly having a packer, crossover tool, and production screen into the wall and setting the packer above the formation to form an annulus adjacent the formation; sequentially raising the crossover tool to perform the steps of lower squeeze opening the flow of gravel to the annulus and formation and closing the production screen and the flow of returns to the surface; lower circulation opening the flow of gravel to the annulus and formation, maintaining the production screen closed, and opening the flow of returns to the surface; upper squeeze opening the flow of gravel to the annulus and formation and through the production screen and closing the flow of returns to the surface; upper circulation opening the flow of gravel to the annulus and formation and opening the production screen for flow of the returns to the surface; and reverse circulation closing the annulus and opening the crossover tool for the reverse flow of fluid to the surface.
Claim 16
Dependent Claim
325 words
A gravel pack system for gravel packing a formation in a well, comprising: a screen assembly including a packer adapted for sealing the annulus between said assembly and the wall above the formation and a screen disposed on said packer adapted for positioning adjacent the formation; a crossover assembly reciprocally received within said screen assembly and adapted for suspension within the well on a pipe string, said crossover assembly having a first flow bore; said crossover assembly and screen assembly forming an upper crossover valve, a lower crossover valve, a circulation valve, and a screen valve; said upper crossover valve opening and closing a first flow path between said first flow bore and the upper annulus above said packer; said lower crossover valve opening and closing a second flow path between a second flow bore of the pipe string and the lower annulus below said packer; said circulation valve opening and closing a second flow path through said first flow bore; said screen valve opening and closing a third flow path through said screen between said first flow bore and the lower annulus below said packer; said crossover assembly having a lower circulating position within said screen assembly for passing a gravel slurry through said second flow path and into the formation and returning fluid through said first flow path, an upper squeeze position within said screen assembly for closing fluid flow to the surface through said first flow path and forcing the gravel slurry through said second flow path and into the formation, and an upper circulating position within said screen assembly for passing gravel slurry through said second flow path and into the formation and returning fluid through said third and first flow paths; said crossover assembly selectively opening and closing said valves and being positioned within said screen assembly for said lower circulating, upper squeeze, and upper circulating positions upon only an upward movement of said crossover assembly within said screen assembly.
Claim 17
Dependent Claim
325 words
A gravel pack system for gravel packing a formation in a well, comprising: a screen assembly including a packer adapted for sealing the annulus between said assembly and the wall above the formation and a screen disposed on said packer adapted for positioning adjacent the formation; a crossover assembly reciprocally received within said screen assembly and adapted for suspension within the well on a pipe string, said crossover assembly having a first flow bore; said crossover assembly and screen assembly forming an upper crossover valve, a lower crossover valve, a circulation valve, and a screen valve; said upper crossover valve opening and closing a first flow path between said first flow bore and the upper annulus above said packer; said lower crossover valve opening and closing a second flow path between a second flow bore of the pipe string and the lower annulus below said packer; said circulation valve opening and closing a second flow path through said first flow bore; said screen valve opening and closing a third flow path through said screen between said first flow bore and the lower annulus below said packer; said crossover assembly having a lower circulating position within said screen assembly for passing a gravel slurry through said second flow path and into the formation and returning fluid through said first flow path, an upper squeeze position within said screen assembly for closing fluid flow to the surface through said first flow path and forcing the gravel slurry through said second flow path and into the formation, and an upper circulating position within said screen assembly for passing gravel slurry through said second flow path and into the formation and returning fluid through said third and first flow paths; said crossover assembly selectively opening and closing said valves and being positioned within said screen assembly for said lower circulating, upper squeeze, and upper circulating positions upon only an upward movement of said crossover assembly within said screen assembly.
Claim 18
Dependent Claim
49 words
The gravel pack system of claim 13 wherein said crossover assembly includes a wash pipe extending below said circulation valve and further including positioning means for positioning said crossover assembly within said screen assembly to selectively actuate said upper crossover valve, lower crossover valve, circulation valve, and screen valve.
Claim 19
Dependent Claim
34 words
The gravel pack system of claim 14 wherein said positioning means includes interference means disposed on said assemblies for causing interference between said assemblies as said crossover assembly is raised within said screen assembly.
Claim 20
Dependent Claim
55 words
The gravel pack system of claim 15 wherein said interference means includes a plurality of interference collars disposed on said screen assembly and at least one indicator collet disposed on said crossover assembly; said indicator collet interfering with at least one of said interference collars as said crossover assembly is raised within said screen assembly.
Claim 21
Dependent Claim
32 words
The gravel pack system of claim 16 wherein said indicator collet contracts to pass through said one of said interference collars and expands after passing through said one of said interference collars.
Claim 22
Dependent Claim
32 words
The gravel pack system of claim 17 wherein said one of said interference collars supportingly engages said indicator collet after having passed therethrough to support said crossover assembly within said screen assembly.
Claim 23
Dependent Claim
28 words
The gravel pack system of claim 14 wherein said positioning means includes support means for supporting said crossover assembly within said screen assembly upon achieving the desired position.
Claim 24
Dependent Claim
82 words
The gravel pack system of claim 14 further including means for positioning said crossover assembly within said screen assembly at a lower squeeze position, whereby said upper crossover valve is closed, said lower crossover valve is open, said circulation valve is open, and said screen valve is closed such that fluid may pass down the pipe string, through said lower crossover valve, into said lower portion of the annulus between said screen assembly and casing below said packer and into the formation.
Claim 25
Dependent Claim
93 words
The gravel pack system of claim 14 further including means for positioning said crossover assembly within said screen assembly at said lower circulating position, whereby said upper crossover valve and lower crossover valve and circulation valve are open and said screen valve is closed such that slurry may pass down through the pipe string, through said lower crossover valve, into said lower portion of the annulus between said screen assembly and casing, up the flow bore of said wash pipe to the annulus between said pipe string and said casing above said packer.
Claim 26
Dependent Claim
72 words
The gravel pack system of claim 14 further including means for positioning said crossover assembly within said screen assembly at said upper squeeze position, whereby said lower crossover valve is open and said circulation valve is closed such that said fluid may pass down the pipe string, through said lower crossover valve, into that portion of the annulus between said screen assembly and said casing below, said packer and into the formation.
Claim 27
Dependent Claim
91 words
The gravel pack system of claim 14 further including means for positioning said crossover assembly within said screen assembly at said upper circulating position, whereby said upper crossover valve, lower crossover valve screen valve, and circulation valve are open such that slurry may pass down through the pipe string, through said lower crossover valve, into that portion of the annulus between said screen assembly and said casing below said packer, up the flow bore of said wash pipe to the annulus between said pipe string and said casing above said packer.
Claim 28
Dependent Claim
73 words
The gravel pack system of claim 14 further including means for positioning said crossover assembly within said screen assembly at a reverse circulation position; a seal on said crossover assembly is in sealing engagement with the seal bore of said packer for flow of fluid down the annulus between said pipe string and said casing and through lower crossover valve ports of said crossover assembly for flow of fluid up said pipe string.
Claim 29
Dependent Claim
38 words
The gravel pack system of claim 13 wherein said upper crossover valve includes a seal disposed on said crossover assembly positioned for sealing engagement with a seal bore on said packer at a predetermined position between said assemblies.
Claim 30
Dependent Claim
36 words
The gravel pack system of claim 13 wherein said lower crossover valve includes a plurality of seals on said crossover assembly alignable with one or more of a plurality of seal bores in said screen assembly.
Claim 31
Dependent Claim
24 words
The gravel pack system of claim 13 wherein said circulation valve includes crossover ports in said crossover assembly and ports in said screen assembly.
Claim 32
Dependent Claim
34 words
The gravel pack system of claim 13 wherein said screen valve includes a seal sub disposed on said production screen of said screen assembly for sealing engagement with the end of said wash pipe.
Claim 33
Dependent Claim
31 words
The gravel pack system of claim 13 wherein said screen valve includes a seal disposed on said washpipe for sealing engagement with a seal bore sub disposed on said screen assembly.
Claim 34
Dependent Claim
273 words
A gravel pack system for gravel packing a formation in a well, comprising: a screen assembly including a packer adapted for sealing the annulus between said assembly and the well above the formation and a screen disposed on said packer adapted for positioning adjacent the formation; a crossover assembly reciprocally received within said screen assembly and adapted for suspension within the well on a pipe string, said crossover assembly having a flow bore; said crossover assembly sand screen assembly forming a crossover valve and a circulation valve; said crossover valve opening and closing a first flow path between the bore of the pipe string and the annulus below said packer; said circulation valve opening and closing a second flow path from the annulus above said packer, through said flow bore to the annulus below said packer; said crossover assembly having a lower circulating position within said screen assembly for passing a gravel slurry through said first flow path and into the formation and returning fluid through said second flow path, an upper squeeze position within said screen assembly for closing fluid flow through said second flow path to the surface and forcing the gravel slurry through said first flow path and into the formation, and an upper circulating position within said screen assembly for passing gravel slurry through said first flow path and into the formation and returning fluid through said second flow path; said crossover assembly selectively opening and closing said valves and being positioned within said screen assembly for said lower circulating, upper squeeze, and upper circulating positions upon only an upward movement of said crossover assembly within said screen assembly.
Claim 35
Dependent Claim
273 words
A gravel pack system for gravel packing a formation in a well, comprising: a screen assembly including a packer adapted for sealing the annulus between said assembly and the well above the formation and a screen disposed on said packer adapted for positioning adjacent the formation; a crossover assembly reciprocally received within said screen assembly and adapted for suspension within the well on a pipe string, said crossover assembly having a flow bore; said crossover assembly sand screen assembly forming a crossover valve and a circulation valve; said crossover valve opening and closing a first flow path between the bore of the pipe string and the annulus below said packer; said circulation valve opening and closing a second flow path from the annulus above said packer, through said flow bore to the annulus below said packer; said crossover assembly having a lower circulating position within said screen assembly for passing a gravel slurry through said first flow path and into the formation and returning fluid through said second flow path, an upper squeeze position within said screen assembly for closing fluid flow through said second flow path to the surface and forcing the gravel slurry through said first flow path and into the formation, and an upper circulating position within said screen assembly for passing gravel slurry through said first flow path and into the formation and returning fluid through said second flow path; said crossover assembly selectively opening and closing said valves and being positioned within said screen assembly for said lower circulating, upper squeeze, and upper circulating positions upon only an upward movement of said crossover assembly within said screen assembly.
Claim 36
Dependent Claim
43 words
The gravel pack system of claim 30 wherein said crossover assembly includes a wash pipe extending below said circulation valve and further including positioning means for position said crossover assembly within said screen assembly to selectively actuate said crossover valve and circulation valve.
Claim 37
Dependent Claim
65 words
The gravel pack system of claim 30 further including means for positioning said crossover assembly within said screen assembly at a lower squeeze position, whereby said crossover valve is open and said circulation valve is closed, such that fluid may pass down the pipe string, through said crossover valve, into the annulus between said screen assembly and casing below said packer and into the formation.
Claim 38
Dependent Claim
80 words
The gravel pack system of claim 30 further including means for positioning said crossover assembly within said screen assembly at said lower circulating position, whereby said crossover valve and circulation valve are open such that slurry may pass down through the pipe string, through said crossover valve, into the annulus between said screen assembly and casing below said packer, up the flow bore of said wash pipe to the annulus between said pipe string and said casing above said packer.
Claim 39
Dependent Claim
70 words
The gravel pack system of claim 30 further including means for positioning said crossover assembly within said screen assembly at said upper squeeze position, whereby said crossover valve is open and said circulation valve is closed such that said fluid may pass down the pipe string, through said crossover valve, into that portion of the annulus between said screen assembly and said casing below said packer and into the formation.
Claim 40
Dependent Claim
84 words
The gravel pack system of claim 30 further including means for positioning said crossover assembly within said screen assembly at said upper circulating position, whereby said crossover valve and circulation valve are open such that slurry may pass down through the pipe string, through said crossover valve, into that portion of the annulus between said screen assembly and said casing below said packer, up the flow bore of said wash pipe to the annulus between said pipe string and said casing above said packer.
Claim 41
Dependent Claim
68 words
The gravel pack system of claim 30 further including means for positioning said crossover assembly within said screen assembly at a reverse circulation position; a seal on said crossover assembly is in sealing engagement with the seal bore of said packer for flow of fluid down the annulus between said pipe string and said casing and through said crossover valve for flow of fluid up said pipe string.
Claim 42
Dependent Claim
51 words
The gravel pack system of claim 30 wherein said crossover assembly and screen assembly also form a screen valve for opening and closing a flow path through said screen between said flow bore and the annulus below said packer upon the upward movement of said crossover assembly within said screen assembly.
Claim 43
Independent Claim
173 words
A method for gravel packing a formation in a well which comprises: running a screen assembly having a packer, crossover tool, and production screen into the well and setting the packer above the formation to form an annulus adjacent the formation; sequentially raising the crossover tool to perform the steps of lower squeeze opening the flow of gravel to the annulus and formation and closing the production screen and the flow of returns to the surface; lower circulation opening the flow of gravel to the annulus and formation, maintaining the production screen closed, and opening the flow of returns to the surface; upper circulation opening the flow of gravel to the annulus and formation and opening the production screen for flow of the returns to the surface; upper squeeze opening the flow of gravel to the annulus and formation and through the production screen and closing the flow of returns to the surface; and reverse circulation closing the annulus and opening the crossover tool for the reverse flow of fluid to the surface.
Claim 44
Independent Claim
173 words
A method for gravel packing a formation in a well which comprises: running a screen assembly having a packer, crossover tool, and production screen into the well and setting the packer above the formation to form an annulus adjacent the formation; sequentially raising the crossover tool to perform the steps of lower squeeze opening the flow of gravel to the annulus and formation and closing the production screen and the flow of returns to the surface; lower circulation opening the flow of gravel to the annulus and formation, maintaining the production screen closed, and opening the flow of returns to the surface; upper circulation opening the flow of gravel to the annulus and formation and opening the production screen for flow of the returns to the surface; upper squeeze opening the flow of gravel to the annulus and formation and through the production screen and closing the flow of returns to the surface; and reverse circulation closing the annulus and opening the crossover tool for the reverse flow of fluid to the surface.