← Back to Patent Explorer
US4869322A Expired / Lapsed US ⏱️ 0.0 years remaining

Sequential hydraulic fracturing of a subsurface formation

Assignee: Mobil Oil AS
•
Filing: 1988-10-07
•
Granted: 1989-09-26
•
Expires: 2008-10-07
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A subsurface formation having original in-situ stresses that favor the propagation of a horizontal fracture is penetrated by a borehole. A first fracturing fluid containing a propping material is pumped through the borehole and into the formation at a first depth to propagate a horizontal fracture which alters the in-situ stress field. The pumping of the first fracturing fluid is stopped and a second fracturing fluid is pumped through the borehole and into the formation at a second depth to form a vertical fracture within the field of altered in-situ stress.

Inventors

  • 👤 Thomas C. Vogt, Jr.
  • 👤 Mitchell W. Hale
  • 👤 Jay R. Sellers

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-09 03:16
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/25; E21B43/26; E21B43/267

Claims Analysis

Total Claims: 3
Claim 1
Independent Claim 258 words
A method for propagating a vertical hydraulic fracture in an earth formation surrounding a borehole wherein the original in-situ stresses favor a horizontal fracture, comprising the steps of: (a) pumping a first fracturing fluid into said formation at a first depth within said borehole so that a first fracturing pressure is applied to said formation by said first fracturing fluid to propagate a horizontal fracture as favored by the original in-situ stresses of the formation, the propagation of said horizontal fracture altering the original in-situ stresses in the formation, (b) injecting a propping material into said horizontal fracture while maintaining said first fracturing pressure in said horizontal fracture in sufficient amount to prevent relaxation of said altered in-situ stresses in said formation after the pumping of said first fracturing fluid is terminated and said first fracturing pressure is removed, (c) terminating the pumping of said first fracturing fluid into said horizontal fracture to remove said first fracturing pressure from said formation, (d) pumping a second fracturing into said formation at a second depth within said borehole within the field of said altered in-situ stresses so that a second fracturing pressure is applied to said formation by said second fracturing fluid to propagate a vertical fracture in said formation as favored by said altered in-situ stresses so long as the presence of said propping material in said horizontal fracture prevents relaxation of said altered in-situ stresses, and (e) terminating the pumping of said second fracturing fluid to said vertical fracture to remove said second fracturing pressure from said formation.
Claim 2
Independent Claim 258 words
A method for propagating a vertical hydraulic fracture in an earth formation surrounding a borehole wherein the original in-situ stresses favor a horizontal fracture, comprising the steps of: (a) pumping a first fracturing fluid into said formation at a first depth within said borehole so that a first fracturing pressure is applied to said formation by said first fracturing fluid to propagate a horizontal fracture as favored by the original in-situ stresses of the formation, the propagation of said horizontal fracture altering the original in-situ stresses in the formation, (b) injecting a propping material into said horizontal fracture while maintaining said first fracturing pressure in said horizontal fracture in sufficient amount to prevent relaxation of said altered in-situ stresses in said formation after the pumping of said first fracturing fluid is terminated and said first fracturing pressure is removed, (c) terminating the pumping of said first fracturing fluid into said horizontal fracture to remove said first fracturing pressure from said formation, (d) pumping a second fracturing into said formation at a second depth within said borehole within the field of said altered in-situ stresses so that a second fracturing pressure is applied to said formation by said second fracturing fluid to propagate a vertical fracture in said formation as favored by said altered in-situ stresses so long as the presence of said propping material in said horizontal fracture prevents relaxation of said altered in-situ stresses, and (e) terminating the pumping of said second fracturing fluid to said vertical fracture to remove said second fracturing pressure from said formation.
Claim 3
Dependent Claim 109 words
The method of claim 1 further comprising the steps of: (a) pumping a third fracturing fluid into said formation at a third depth within said borehole within the field of altered in-situ stresses so that a third fracturing pressure is applied to said formation by said third fracturing fluid to propagate an additional vertical fracture in said formation as favored by said altered in-situ stresses so long as the presence of said propping material in said horizontal fracture prevents relaxation of said altered in-situ stresses, and (b) terminating the pumping of said third fracturing fluid to said additional vertical fracture to remove said third fracturing pressure from said formation.

References Cited (Backward Citations)

US3965982A Cited
US3987850A Cited
US4005750A Cited
US4067389A Cited
US4378845A Cited
US4515214A Cited
US4549608A Cited
US4724905A Cited
US4687061A Cited
US4714115A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1992-09-25 1993-03-27 1993-09-26 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1996-09-25 1997-03-27 1997-09-26 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2000-09-25 2001-03-27 2001-09-26 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag