Patent US4887670A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4887670A Expired / Lapsed US ⏱️ 0.0 years remaining

Controlling fracture growth

Assignee: Halliburton Co
•
Filing: 1989-04-05
•
Granted: 1989-12-19
•
Expires: 2009-04-05
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The present invention provides methods of controlling the growth of one or more vertically oriented fractures in a subterranean formation during a fracturing treatment. A first fluid having a known density and containing a diverting agent is introduced into a formation to create a fracture. A second fluid which may contain proppant and having a known density different from the first fluid then is introduced into the fracture whereby the second fluid selectively overrides or underrides the first fluid. Such fluid control forces the first fluid to the bottom or top of the fracture whereby the diverting agent therein is caused to screen out and impede further downward or upward growth of the fracture. The introduction of the second fluid then can be continued to extend the fracture as desired.

Inventors

  • 👤 David L. Lord
  • 👤 Buddy W. McDaniel
  • 👤 Lawrence E. Harris
  • 👤 J. E. Manrique

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 14:22
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/25; E21B43/26; E21B43/261; E21B43/267

Claims Analysis

Total Claims: 24
Claim 1
Independent Claim 151 words
A method of controlling the growth of one or more vertically oriented fractures in a subterranean formation during a fracturing treatment therein comprising: introducing a first fracturing fluid into said formation and into at least one fracture formed therein, said first fracturing fluid having a known density and containing a diverting agent; introducing a second fracturing fluid into said fracture having a known density different from density of said first fracturing fluid whereby said second fracturing fluid selectably the overrides or underrides said first fracturing fluid and forces said first fracturing fluid to the bottom or top of said fracture whereby said diverting agent contained therein is caused to screen out along the bottom or top of said fracture and to thereby impede further downward or upward growth of said fracture; and continuing the introduction of said second fracturing fluid into said fracture until said fracture is extended a desired amount.
Claim 2
Independent Claim 151 words
A method of controlling the growth of one or more vertically oriented fractures in a subterranean formation during a fracturing treatment therein comprising: introducing a first fracturing fluid into said formation and into at least one fracture formed therein, said first fracturing fluid having a known density and containing a diverting agent; introducing a second fracturing fluid into said fracture having a known density different from density of said first fracturing fluid whereby said second fracturing fluid selectably the overrides or underrides said first fracturing fluid and forces said first fracturing fluid to the bottom or top of said fracture whereby said diverting agent contained therein is caused to screen out along the bottom or top of said fracture and to thereby impede further downward or upward growth of said fracture; and continuing the introduction of said second fracturing fluid into said fracture until said fracture is extended a desired amount.
Claim 3
Dependent Claim 35 words
The method of claim 1 wherein said first fracturing fluid is a high density fluid and said second fracturing fluid is a low density fluid whereby said second fracturing fluid overrides said first fracturing fluid.
Claim 4
Dependent Claim 35 words
The method of claim 1 wherein said first fracturing fluid is a low density fluid and said second fracturing fluid is a high density fluid whereby said second fracturing fluid underrides said first fracturing fluid.
Claim 5
Dependent Claim 49 words
The method of claim 1 which is further characterized to include the step of introducing a spacer fluid into said fracture after said first fracturing fluid and before said second fracturing fluid, said spacer fluid having a known density between the densities of said first and second fracturing fluids.
Claim 6
Dependent Claim 19 words
The method of claim 4 wherein said first and second fracturing fluids are more viscous than said spacer fluid.
Claim 7
Dependent Claim 27 words
The method of claim 5 wherein said diverting agent is selected from the group consisting of sand, silica flour, oil-soluble resins, and mixtures of such diverting agents.
Claim 8
Independent Claim 133 words
A method of reducing the downward growth of one or more vertically oriented fractures in a subterranean formation during a fracturing treatment therein comprising: introducing a first fracturing fluid into said formation and into at least one fracture therein, said first fracturing fluid having a known density and containing a diverting agent; introducing a second fracturing fluid into said fracture having a density lower than said first fracturing fluid whereby said second fracturing fluid overrides said first fracturing fluid, forces said first fracturing fluid to the bottom of said fracture and causes said diverting agent to be placed along the bottom of said fracture thereby impeding the further downward growth of said fracture; and continuing the introduction of said second fracturing fluid into said fracture until said fracture is extended a desired amount.
Claim 9
Independent Claim 133 words
A method of reducing the downward growth of one or more vertically oriented fractures in a subterranean formation during a fracturing treatment therein comprising: introducing a first fracturing fluid into said formation and into at least one fracture therein, said first fracturing fluid having a known density and containing a diverting agent; introducing a second fracturing fluid into said fracture having a density lower than said first fracturing fluid whereby said second fracturing fluid overrides said first fracturing fluid, forces said first fracturing fluid to the bottom of said fracture and causes said diverting agent to be placed along the bottom of said fracture thereby impeding the further downward growth of said fracture; and continuing the introduction of said second fracturing fluid into said fracture until said fracture is extended a desired amount.
Claim 10
Dependent Claim 49 words
The method of claim 7 which is further characterized to include the step of introducing a spacer fluid into said fracture after said first fracturing fluid and before said second fracturing fluid, said spacer fluid having a known density between the densities of said first and second fracturing fluids.
Claim 11
Dependent Claim 17 words
The method of claim 8 wherein said second fracturing fluid is more viscous than said spacer fluid.
Claim 12
Dependent Claim 27 words
The method of claim 9 wherein said diverting agent is selected from the group consisting of sand, silica flour, oil-soluble resins, and mixtures of such diverting agents.
Claim 13
Independent Claim 134 words
A method of reducing the upward growth of one or more vertically oriented fractures in a subterranean formation during a fracturing treatment therein comprising: introducing a first fracturing fluid into said formation and into at least one fracture therein, said first fracturing fluid having a known density and containing a diverting agent; introducing a second fracturing fluid into said fracture having a density higher than said first fracturing fluid whereby said second fracturing fluid underrides said first fracturing fluid, forces said first fracturing fluid to the top of said fracture and causes said diverting agent to be screened out along the top of said fracture thereby impeding the further upward growth of said fracture; and continuing the introduction of said second fracturing fluid into said fracture until said fracture is extended a desired amount.
Claim 14
Independent Claim 134 words
A method of reducing the upward growth of one or more vertically oriented fractures in a subterranean formation during a fracturing treatment therein comprising: introducing a first fracturing fluid into said formation and into at least one fracture therein, said first fracturing fluid having a known density and containing a diverting agent; introducing a second fracturing fluid into said fracture having a density higher than said first fracturing fluid whereby said second fracturing fluid underrides said first fracturing fluid, forces said first fracturing fluid to the top of said fracture and causes said diverting agent to be screened out along the top of said fracture thereby impeding the further upward growth of said fracture; and continuing the introduction of said second fracturing fluid into said fracture until said fracture is extended a desired amount.
Claim 15
Dependent Claim 49 words
The method of claim 11 which is further characterized to include the step of introducing a spacer fluid into said fracture after said first fracturing fluid and before said second fracturing fluid, said spacer fluid having a known density between the densities of said first and second fracturing fluids.
Claim 16
Dependent Claim 19 words
The method of claim 12 wherein said first and second fracturing fluids are more viscous than said spacer fluid.
Claim 17
Dependent Claim 27 words
The method of claim 13 wherein said diverting agent is selected from the group consisting of sand, silica flour, oil-soluble resins, and mixtures of such diverting agents.
Claim 18
Independent Claim 195 words
A method of controlling the growth of one or more vertically oriented fractures in a subterranean formation during a fracturing treatment therein comprising: introducing a first fracturing fluid into said formation and into at least one fracture formed therein, said first fracturing fluid containing a diverting agent and having a known density; introducing a second fracturing fluid into said fracture, said second fracturing fluid containing a diverting agent and having a known density lower or higher than the density of said first fracturing fluid whereby said second fracturing fluid overrides or underrides said first fracturing fluid; introducing a third fracturing fluid into said fracture, said third fracturing fluid having a known density between the densities of said first and second fracturing fluids whereby said third fracturing fluid is substantially confined between said first and second fracturing fluids and forces said first and second fracturing fluid to the bottom and top of said fracture whereby the diverting agent therein is caused to screen out and thereby impede the downward and upward growth of said fracture; and continuing the introduction of said third fracturing fluid into said fracture until said fracture is extended outwardly a desired amount.
Claim 19
Independent Claim 195 words
A method of controlling the growth of one or more vertically oriented fractures in a subterranean formation during a fracturing treatment therein comprising: introducing a first fracturing fluid into said formation and into at least one fracture formed therein, said first fracturing fluid containing a diverting agent and having a known density; introducing a second fracturing fluid into said fracture, said second fracturing fluid containing a diverting agent and having a known density lower or higher than the density of said first fracturing fluid whereby said second fracturing fluid overrides or underrides said first fracturing fluid; introducing a third fracturing fluid into said fracture, said third fracturing fluid having a known density between the densities of said first and second fracturing fluids whereby said third fracturing fluid is substantially confined between said first and second fracturing fluids and forces said first and second fracturing fluid to the bottom and top of said fracture whereby the diverting agent therein is caused to screen out and thereby impede the downward and upward growth of said fracture; and continuing the introduction of said third fracturing fluid into said fracture until said fracture is extended outwardly a desired amount.
Claim 20
Dependent Claim 51 words
The method of claim 15 which is further characterized to include the step of introducing a first spacer fluid into said fracture after said first fracturing fluid and before said second fracturing fluid, said first spacer fluid having a known density between the densities of said first and second fracturing fluids.
Claim 21
Dependent Claim 51 words
The method of claim 16 which is further characterized to include the step of introducing a second spacer fluid into said fracture after said second fracturing fluid and before said third fracturing fluid, said second spacer fluid having a known density between the densities of said second and third fracturing fluids.
Claim 22
Dependent Claim 18 words
The method of claim 17 wherein said second fracturing fluid is more viscous than said first spacer fluid.
Claim 23
Dependent Claim 20 words
The method of claim 18 wherein said second and third fracturing fluids are more viscous than said second spacer fluid.
Claim 24
Dependent Claim 27 words
The method of claim 19 wherein said diverting agent is selected from the group consisting of sand, silica flour, oil-soluble resins, and mixtures of such diverting agents.

References Cited (Backward Citations)

US3198253A Cited
US3127937A Cited
US3155159A Cited
US3241613A Cited
US3335797A Cited
US3954142A Cited
US3918524A Cited
US4078609A Cited
US4186802A Cited
US4478282A Cited
US4436156A Cited
US4509598A Cited
US4515214A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1992-12-18 1993-06-19 1993-12-19 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1996-12-18 1997-06-19 1997-12-19 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2000-12-18 2001-06-19 2001-12-19 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag