← Back to Patent Explorer
US6003600A Expired / Lapsed US ⏱️ 0.0 years remaining

Methods of completing wells in unconsolidated subterranean zones

Assignee: Halliburton Energy Services Inc
•
Filing: 1997-10-16
•
Granted: 1999-12-21
•
Expires: 2017-10-16
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Improved methods of completing unconsolidated subterranean zones penetrated by wellbores are provided. The methods basically comprise the steps of placing a slotted liner in the zone, isolating the slotted liner and the wellbore in the zone, injecting a hardenable resin composition coated particulate material into the zone by way of the slotted liner and then causing the hardenable resin composition to harden whereby the particulate material is consolidated into a hard permeable uniform mass.

Inventors

  • 👤 Philip D. Nguyen
  • 👤 Ronald G. Dusterhoft

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 07:44
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/02; E21B43/10; E21B43/025; E21B43/04

Claims Analysis

Total Claims: 23
Claim 1
Independent Claim 175 words
An improved method of completing an unconsolidated subterranean zone penetrated by a wellbore having an upper and lower end comprising the steps of: (a) placing a slotted liner in a lower end of said wellbore in said zone; (b) isolating the annulus between said slotted liner and said lower end of said wellbore in said zone from said upper wellbore end; (c) injecting a hardenable resin composition coated particulate material into said lower end of said wellbore in said zone by way of said slotted liner whereby said particulate material is uniformly packed into said annulus and into said slotted liner; (d) causing said hardenable resin composition to harden whereby said particulate material is consolidated into a hard permeable uniform mass capable of preventing migration of at least a portion of any unconsolidated formation fines and sand with fluids produced into said wellbore from said zone; and (e) drilling at least a portion of the hard permeable mass of particulate material formed in accordance with step (d) out of the interior of said slotted liner.
Claim 2
Dependent Claim 175 words
An improved method of completing an unconsolidated subterranean zone penetrated by a wellbore having an upper and lower end comprising the steps of: (a) placing a slotted liner in a lower end of said wellbore in said zone; (b) isolating the annulus between said slotted liner and said lower end of said wellbore in said zone from said upper wellbore end; (c) injecting a hardenable resin composition coated particulate material into said lower end of said wellbore in said zone by way of said slotted liner whereby said particulate material is uniformly packed into said annulus and into said slotted liner; (d) causing said hardenable resin composition to harden whereby said particulate material is consolidated into a hard permeable uniform mass capable of preventing migration of at least a portion of any unconsolidated formation fines and sand with fluids produced into said wellbore from said zone; and (e) drilling at least a portion of the hard permeable mass of particulate material formed in accordance with step (d) out of the interior of said slotted liner.
Claim 3
Dependent Claim 11 words
The method of claim 1 wherein said particulate material is sand.
Claim 4
Dependent Claim 14 words
The method of claim 1 wherein said wellbore in said subterranean zone is open-hole.
Claim 5
Dependent Claim 24 words
The method of claim 1 wherein said wellbore in said subterranean zone has casing cemented therein with perforations formed through the casing and cement.
Claim 6
Dependent Claim 28 words
The method of claim 1 which further comprises the step of creating at least one fracture in said subterranean zone prior to or while carrying out step (c).
Claim 7
Dependent Claim 165 words
An improved method of completing an unconsolidated subterranean zone penetrated by an open-hole wellbore having an upper and lower end comprising the steps of: (a) placing a slotted liner in a lower end of said wellbore in said zone; (b) isolating the annulus between said slotted liner and said lower end of said wellbore in said zone from said upper wellbore end; (c) pumping a slurry of a hardenable resin composition coated particulate material into said lower end of said wellbore in said zone by way of said slotted liner whereby said particulate material is uniformly packed into said annulus and into said slotted liner; (d) causing said hardenable resin composition to harden whereby said particulate material is consolidated into a hard permeable uniform mass capable of preventing migration of at least a portion of any unconsolidated formation fines and sand with fluids produced into said wellbore from said zone; and (e) drilling said hard permeable mass of particulate material out of said slotted liner.
Claim 8
Dependent Claim 165 words
An improved method of completing an unconsolidated subterranean zone penetrated by an open-hole wellbore having an upper and lower end comprising the steps of: (a) placing a slotted liner in a lower end of said wellbore in said zone; (b) isolating the annulus between said slotted liner and said lower end of said wellbore in said zone from said upper wellbore end; (c) pumping a slurry of a hardenable resin composition coated particulate material into said lower end of said wellbore in said zone by way of said slotted liner whereby said particulate material is uniformly packed into said annulus and into said slotted liner; (d) causing said hardenable resin composition to harden whereby said particulate material is consolidated into a hard permeable uniform mass capable of preventing migration of at least a portion of any unconsolidated formation fines and sand with fluids produced into said wellbore from said zone; and (e) drilling said hard permeable mass of particulate material out of said slotted liner.
Claim 9
Dependent Claim 36 words
The method of claim 6 wherein said annulus between said slotted liner and said wellbore is isolated in accordance with step (b) by setting a production packer in said wellbore sealingly attached to said slotted liner.
Claim 10
Dependent Claim 13 words
The method of claim 6 wherein said wellbore in said zone is horizontal.
Claim 11
Dependent Claim 28 words
The method of claim 6 which further comprises the step of creating at least one fracture in said subterranean zone prior to or while carrying out step (c).
Claim 12
Dependent Claim 36 words
The method of claim 6 wherein said hardenable resin composition is comprised of an organic resin selected from the group of novolak resins, polyepoxide resins, polyester resins, phenol-aldehyde resins, urea-aldehyde resins, furan resins and urethane resins.
Claim 13
Dependent Claim 26 words
The method of claim 6 wherein said hardenable resin composition is caused to harden in accordance with step (d) by being heated in said subterranean zone.
Claim 14
Dependent Claim 26 words
The method of claim 6 wherein said hardenable resin composition is caused to harden in accordance with step (d) by being contacted with a hardening agent.
Claim 15
Dependent Claim 188 words
An improved method of completing an unconsolidated subterranean zone penetrated by a wellbore having casing cemented therein and having an upper and lower end comprising the steps of: (a) forming perforations through said casing and cement into said zone; (b) placing a slotted liner in a lower end of said wellbore in said zone; (c) isolating the annulus between said slotted liner and said lower end of said wellbore in said zone from said upper wellbore end; (d) pumping a slurry of a hardenable resin composition coated particulate material into said zone by way of said slotted liner whereby said particulate material is uniformly packed into said perforations, said annulus and said slotted liner; (e) causing said hardenable resin composition to harden whereby said particulate material is consolidated into a hard permeable uniform mass capable of preventing migration of at least a portion of any unconsolidated formation fines and sand with fluids produced into said wellbore from said zone; and (f) drilling at least a portion of the hard permeable mass of particulate material formed in accordance with step (e) out of the interior of said slotted liner.
Claim 16
Dependent Claim 188 words
An improved method of completing an unconsolidated subterranean zone penetrated by a wellbore having casing cemented therein and having an upper and lower end comprising the steps of: (a) forming perforations through said casing and cement into said zone; (b) placing a slotted liner in a lower end of said wellbore in said zone; (c) isolating the annulus between said slotted liner and said lower end of said wellbore in said zone from said upper wellbore end; (d) pumping a slurry of a hardenable resin composition coated particulate material into said zone by way of said slotted liner whereby said particulate material is uniformly packed into said perforations, said annulus and said slotted liner; (e) causing said hardenable resin composition to harden whereby said particulate material is consolidated into a hard permeable uniform mass capable of preventing migration of at least a portion of any unconsolidated formation fines and sand with fluids produced into said wellbore from said zone; and (f) drilling at least a portion of the hard permeable mass of particulate material formed in accordance with step (e) out of the interior of said slotted liner.
Claim 17
Dependent Claim 13 words
The method of claim 13 wherein said wellbore in said zone is horizontal.
Claim 18
Dependent Claim 28 words
The method of claim 13 which further comprises the step of creating at least one fracture in said subterranean zone prior to or while carrying out step (d).
Claim 19
Dependent Claim 36 words
The method of claim 13 wherein said hardenable resin composition is comprised of an organic resin selected from the group of novolak resins, polyepoxide resins, polyester resins, phenol-aldehyde resins, urea-aldehyde resins, furan resins and urethane resins.
Claim 20
Dependent Claim 26 words
The method of claim 13 wherein said hardenable resin composition is caused to harden in accordance with step (e) by being heated in said subterranean zone.
Claim 21
Dependent Claim 26 words
The method of claim 13 wherein said hardenable resin composition is caused to harden in accordance with step (e) by being contacted with a hardening agent.
Claim 22
Dependent Claim 153 words
An improved method of recompleting an unconsolidated subterranean zone penetrated by a wellbore having an upper and lower end having a screen positioned therein in said lower end comprising the steps of: (a) forming perforations or slots through said screen to effect communication with the annulus surrounding said screen in said lower wellbore end; (b) isolating the annulus between said perforated screen and said lower end of said wellbore from said upper wellbore end; (c) pumping a slurry of a hardenable resin composition coated particulate material into said lower wellbore end by way of said perforated screen whereby said particulate material is uniformly packed into said perforations, said annulus and said slotted liner; (d) causing said hardenable resin composition to harden whereby said particulate material is consolidated into a hard permeable uniform mass capable of preventing migration of at least a portion of any unconsolidated formation particulates with fluids produced into said wellbore.
Claim 23
Dependent Claim 153 words
An improved method of recompleting an unconsolidated subterranean zone penetrated by a wellbore having an upper and lower end having a screen positioned therein in said lower end comprising the steps of: (a) forming perforations or slots through said screen to effect communication with the annulus surrounding said screen in said lower wellbore end; (b) isolating the annulus between said perforated screen and said lower end of said wellbore from said upper wellbore end; (c) pumping a slurry of a hardenable resin composition coated particulate material into said lower wellbore end by way of said perforated screen whereby said particulate material is uniformly packed into said perforations, said annulus and said slotted liner; (d) causing said hardenable resin composition to harden whereby said particulate material is consolidated into a hard permeable uniform mass capable of preventing migration of at least a portion of any unconsolidated formation particulates with fluids produced into said wellbore.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2002-12-20 2003-06-21 2003-12-21 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2006-12-20 2007-06-21 2007-12-21 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2010-12-20 2011-06-21 2011-12-21 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag