← Back to Patent Explorer
US5111881A Expired / Lapsed US ⏱️ 0.0 years remaining

Method to control fracture orientation in underground formation

Assignee: Halliburton Co
•
Filing: 1990-09-07
•
Granted: 1992-05-12
•
Expires: 2010-09-07
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract This invention relates to a procedure to control fracture orientation in underground formations to increase well productivity. The method is performed by hydraulically fracturing the formation and propping and plugging the fractures which result. The formation is then perforated or notched in a direction angularly disposed relative to the anticipated fracture formation and first hydraulic fracture. The presence of the first fracture will force the second fracture to propagate in a direction away from that of the first fracture. A method for simultaneously fracturing the formation in two directions is also provided.

Inventors

  • 👤 Mohamed Y. Soliman
  • 👤 James J. Venditto
  • 👤 A. Ali Daneshy

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 16:37
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/25; E21B43/26; E21B47/00; E21B47/02; E21B49/00; E21B49/006

Claims Analysis

Total Claims: 13
Claim 1
Independent Claim 108 words
A method of controlling hydraulic fracture orientation in hydrocarbon bearing formations penetrated by a wellbore comprising the steps of: determining the anticipated fracture orientation of the hydrocarbon bearing formation; perforating or notching the wellbore within the formation in a direction parallel to the anticipated fracture orientation; perforating or notching the wellbore within the formation in a direction perpendicular to the anticipated fracture orientation; first fracturing the formation in the direction parallel to the anticipated fracture orientation by injecting a fluid through said wellbore and into said formation; and while injection is proceeding in the first fracture, fracturing the formation in a direction perpendicular to the anticipated fracture orientation.
Claim 2
Independent Claim 108 words
A method of controlling hydraulic fracture orientation in hydrocarbon bearing formations penetrated by a wellbore comprising the steps of: determining the anticipated fracture orientation of the hydrocarbon bearing formation; perforating or notching the wellbore within the formation in a direction parallel to the anticipated fracture orientation; perforating or notching the wellbore within the formation in a direction perpendicular to the anticipated fracture orientation; first fracturing the formation in the direction parallel to the anticipated fracture orientation by injecting a fluid through said wellbore and into said formation; and while injection is proceeding in the first fracture, fracturing the formation in a direction perpendicular to the anticipated fracture orientation.
Claim 3
Dependent Claim 30 words
The method of claim 1 adding the further step of determining whether the stress field around a first hydraulic fracture will be altered to allow a reversal of the stresses.
Claim 4
Dependent Claim 24 words
The method of claim 1 wherein the first fracture is allowed to extend for 5 to 25 minutes, before the second fracture is initiated.
Claim 5
Dependent Claim 54 words
The method of claim 1 wherein the perforating or notching parallel to the anticipated fracture orientation in the well bore is done at one level in the hydrocarbon bearing formation and the perforating or notching perpendicular to the anticipated fracture orientation in the wellbore is done at another level in the hydrocarbon bearing formation.
Claim 6
Dependent Claim 30 words
The method of claim 4 wherein the further step of determining whether the stress field around a first hydraulic fracture will be altered to allow a reversal of the stresses.
Claim 7
Dependent Claim 24 words
The method of claim 4 wherein the first fracture is allowed to extend for 5 to 25 minutes, before the second fracture is initiated.
Claim 8
Independent Claim 152 words
A method of controlling hydraulic fracture orientation in a hydrocarbon bearing formation penetrated by a wellbore comprising the steps of: determining the anticipated fracture orientation of the hydrocarbon bearing formation; perforating or notching the wellbore in the formation in a direction substantially parallel to the anticipated fracture orientation; perforating or notching the wellbore in the formation in a direction of about 60° to 120° relative to the anticipated fracture orientation; introducing a first fracturing fluid through the wellbore under conditions sufficient to fracture the formation in the direction substantially parallel to the anticipated fracture orientation; and while the first fracture is maintained in an at least partially open condition by the presence of said fracturing fluid, fracturing the formation in a direction substantially perpendicular to the anticipated fracture orientation by injection of a second fracturing fluid through said perforations or notches located about 60° to 120° relative to the anticipated fracture orientation.
Claim 9
Independent Claim 152 words
A method of controlling hydraulic fracture orientation in a hydrocarbon bearing formation penetrated by a wellbore comprising the steps of: determining the anticipated fracture orientation of the hydrocarbon bearing formation; perforating or notching the wellbore in the formation in a direction substantially parallel to the anticipated fracture orientation; perforating or notching the wellbore in the formation in a direction of about 60° to 120° relative to the anticipated fracture orientation; introducing a first fracturing fluid through the wellbore under conditions sufficient to fracture the formation in the direction substantially parallel to the anticipated fracture orientation; and while the first fracture is maintained in an at least partially open condition by the presence of said fracturing fluid, fracturing the formation in a direction substantially perpendicular to the anticipated fracture orientation by injection of a second fracturing fluid through said perforations or notches located about 60° to 120° relative to the anticipated fracture orientation.
Claim 10
Dependent Claim 17 words
The method of claim 7 wherein said first and second fracturing fluids have substantially the same composition.
Claim 11
Dependent Claim 27 words
The method of claim 7 wherein the first fracture is allowed to extend for from about 5 to about 25 minutes before the second fracture is initiated.
Claim 12
Dependent Claim 59 words
The method of claim 7 wherein the perforating or notching parallel to the anticipated fracture orientation in the wellbore is done at one level in the wellbore in the hydrocarbon bearing formation and the perforating or notching at 60° to 120° relative to the anticipated orientation is done at another level in the wellbore within the hydrocarbon bearing formation.
Claim 13
Dependent Claim 26 words
The method of claim 10 wherein the levels of the perforations or notches in the wellbore are spaced from about 5 to about 10 feet apart.

References Cited (Backward Citations)

US3289762A Cited
US3537529A Cited
US4005750A Cited
US4669546A Cited
US4724905A Cited
US4687061A Cited
US4718490A Cited
US4830106A Cited
US4834181A Cited
US4850431A Cited
US4869322A Cited
US4977961A Cited
US4974675A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1995-05-12 1995-11-11 1996-05-12 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1999-05-12 1999-11-11 2000-05-12 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2003-05-12 2003-11-11 2004-05-12 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag