Patent US5560427A successfully refreshed from Google Patents.
← Back to Patent Explorer
US5560427A Expired / Lapsed US ⏱️ 0.0 years remaining

Fracturing and propping a formation using a downhole slurry splitter

Assignee: Mobil Oil AS
•
Filing: 1995-07-24
•
Granted: 1996-10-01
•
Expires: 2015-07-24
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method and apparatus for fracturing and propping a fracture interval wherein a workstring is lowered into the wellbore and a fracturing slurry comprised of a fracturing fluid and proppants is flowed down the workstring to a downhole slurry splitter which separates a portion of the fracturing fluid from the slurry and delivers it to the bottom of the fracture interval to initiate and propagate a fracture in the interval. The remaining slurry including the proppants is at the same time delivered to the top of the interval to prop the fracture as it is being formed. Alternate flowpath(s) deliver fracturing fluid and/or slurry to different levels within the interval to by-pass any sand bridges which may be formed during the fracturing operation.

Inventors

  • 👤 Lloyd G. Jones

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 12:35
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/25; E21B43/26; E21B43/267

Claims Analysis

Total Claims: 22
Claim 1
Independent Claim 129 words
A method for fracturing and propping a fracture interval of a subterranean formation which is traversed by a wellbore, said method comprising: positioning a workstring in the wellbore to form a well annulus between said Workstring and said wellbore; flowing a slurry comprising a fracturing fluid and proppants down said workstring; separating a portion of said fracturing fluid from said slurry; flowing said separated portion of said fracturing fluid into one end of that portion of said well annulus which lies adjacent to said fracture interval to thereby initiate a fracture within said fracture interval; flowing the remainder of said slurry containing proppants into the other end of said fracture interval annulus while continuing to flow said separated fracturing fluid into said one end of said fracture interval annulus.
Claim 2
Independent Claim 129 words
A method for fracturing and propping a fracture interval of a subterranean formation which is traversed by a wellbore, said method comprising: positioning a workstring in the wellbore to form a well annulus between said Workstring and said wellbore; flowing a slurry comprising a fracturing fluid and proppants down said workstring; separating a portion of said fracturing fluid from said slurry; flowing said separated portion of said fracturing fluid into one end of that portion of said well annulus which lies adjacent to said fracture interval to thereby initiate a fracture within said fracture interval; flowing the remainder of said slurry containing proppants into the other end of said fracture interval annulus while continuing to flow said separated fracturing fluid into said one end of said fracture interval annulus.
Claim 3
Dependent Claim 37 words
The method of claim 1 wherein said separated portion of said fracturing fluid is flowed into the bottom of said fracture interval annulus and said remaining slurry is flowed into the top of said fracture interval annulus.
Claim 4
Dependent Claim 55 words
The method of claim 1 including: delivering said separated fracturing fluid and/or said remaining slurry through an alternate flowpath to different levels within said fracture interval annulus while continuing to flow said fracturing fluid through said one end of said fracture interval annulus and said slurry through said other end of said fracture interval annulus.
Claim 5
Dependent Claim 28 words
The method of claim 3 wherein said alternate flowpaths are provided by at least one shunt tube which extends along said workstring and substantially through said fracture interval.
Claim 6
Dependent Claim 32 words
The method of claim 4 including: isolating said portion of said annulus which lies adjacent said fracture interval prior to flowing said fracturing fluid into the bottom of the fracture interval annulus.
Claim 7
Dependent Claim 34 words
The method of claim 5 wherein said portion of said fracturing fluid is separated from said slurry by passing said fracturing fluid through a downhole slurry splitter while blocking flow of said proppants therethrough.
Claim 8
Dependent Claim 18 words
The method of claim 6 wherein said fracturing fluid is a fracturing gel and said proppants are sand.
Claim 9
Dependent Claim 44 words
The method of claim 1 including: ceasing flow of said slurry down said workstring when said fracture interval has been fractured and propped; and flowing a wash fluid down said wellbore to unload said workstring whereby said workstring can be removed from said wellbore.
Claim 10
Independent Claim 191 words
A method for fracturing, propping, and gravel-packing a fracture interval of a subterranean formation which is traversed by a wellbore, said method comprising: positioning a workstring in the wellbore to form a well annulus between said workstring and said wellbore, said workstring including a gravel pack screen which lies adjacent said fracture interval to form a fracture interval annulus when said workstring is in place within said wellbore; flowing a slurry comprising a fracturing fluid and proppants down said workstring; separating a portion of said fracturing fluid from said slurry; flowing said separated portion of said fracturing fluid into one end of that portion Of said well annulus which lies adjacent to said fracture interval to thereby initiate a fracture in said fracture interval; flowing the remainder of said slurry containing proppants into the other end of said fracture interval annulus while continuing to flow said separated fracturing fluid into said one end of said fracture interval annulus; and continuing to flow said slurry through said isolated fracture interval annulus to fracture and prop said interval and to deposit proppants in said isolated fracture interval annulus around said gravel pack screen.
Claim 11
Independent Claim 191 words
A method for fracturing, propping, and gravel-packing a fracture interval of a subterranean formation which is traversed by a wellbore, said method comprising: positioning a workstring in the wellbore to form a well annulus between said workstring and said wellbore, said workstring including a gravel pack screen which lies adjacent said fracture interval to form a fracture interval annulus when said workstring is in place within said wellbore; flowing a slurry comprising a fracturing fluid and proppants down said workstring; separating a portion of said fracturing fluid from said slurry; flowing said separated portion of said fracturing fluid into one end of that portion Of said well annulus which lies adjacent to said fracture interval to thereby initiate a fracture in said fracture interval; flowing the remainder of said slurry containing proppants into the other end of said fracture interval annulus while continuing to flow said separated fracturing fluid into said one end of said fracture interval annulus; and continuing to flow said slurry through said isolated fracture interval annulus to fracture and prop said interval and to deposit proppants in said isolated fracture interval annulus around said gravel pack screen.
Claim 12
Dependent Claim 55 words
The method of claim 9 including: delivering said separated fracturing fluid and/or said remaining slurry through an alternate flowpath to different levels within said fracture interval annulus while continuing to flow said fracturing fluid through said one end of said fracture interval annulus and said slurry through said other end of said fracture interval annulus.
Claim 13
Independent Claim 120 words
An apparatus for fracturing and propping a fracture interval of a subterranean formation which is traversed by a wellbore, said apparatus comprising: a workstring adapted to extend from the surface and carry a fracturing slurry comprised of a fracturing fluid and proppants, said workstring having a lower section which lies adjacent the fracture interval when said workstring is in an operable position within the wellbore; a slurry splitter in said lower section adapted to separate a portion of the fracturing fluid from said slurry and deliver said separated fluid out the bottom of said lower section; and outlet means for conveying slurry from said workstring into the wellbore at a point substantially adjacent the upper end of the fracture interval.
Claim 14
Independent Claim 120 words
An apparatus for fracturing and propping a fracture interval of a subterranean formation which is traversed by a wellbore, said apparatus comprising: a workstring adapted to extend from the surface and carry a fracturing slurry comprised of a fracturing fluid and proppants, said workstring having a lower section which lies adjacent the fracture interval when said workstring is in an operable position within the wellbore; a slurry splitter in said lower section adapted to separate a portion of the fracturing fluid from said slurry and deliver said separated fluid out the bottom of said lower section; and outlet means for conveying slurry from said workstring into the wellbore at a point substantially adjacent the upper end of the fracture interval.
Claim 15
Dependent Claim 48 words
The apparatus of claim 11 wherein said slurry splitter comprises: a conduit mounted in said lower section of said workstring having one end extending substantially through said lower section; and inlet means on said conduit for allowing flow of fracturing fluid therethrough while blocking flow of proppants therethrough.
Claim 16
Dependent Claim 26 words
The apparatus of claim 11 wherein said outlet means for conveying slurry from said workstring comprises: outlet ports through the upper end of said lower portion.
Claim 17
Dependent Claim 35 words
The apparatus of claim 13 wherein said slurry splitter further comprises: sealing means fixed to the external surface and positioned below said outlet ports to block downward flow through the lower section of said workstring.
Claim 18
Dependent Claim 24 words
The apparatus of claim 14 wherein said slurry splitter further comprises: means for releasably securing said conduit within said lower section of said workstring.
Claim 19
Dependent Claim 36 words
The apparatus of claim 11 including: at least one alternate flowpath carried by said lower section and extending substantially through the fracture interval for delivering fracturing fluid and/or slurry to different levels within said fracture interval.
Claim 20
Dependent Claim 41 words
The apparatus of claim 16 wherein said at least one alternate flowpath comprises: a plurality of shunt tubes extending along the longitudinal axis of said lower section, each of said shunt tubes having a plurality of outlets spaced along its length.
Claim 21
Dependent Claim 45 words
The apparatus of claim 16 wherein said at least one alternate flowpaths comprises: a plurality of shunt tubes extending along the longitudinal axis of said lower section, each of said shunt tubes comprising two aligned conduits coupled together with a connector having an outlet therein.
Claim 22
Dependent Claim 69 words
The apparatus of claim 11 wherein said lower section of said workstring comprises: a screen means for allowing flow of fluid therethrough while blocking the flow of proppants therethrough; and wherein said slurry splitter comprises: a conduit mounted in said lower section of said workstring having one end extending substantially through said screen means; and inlet means on said conduit for allowing flow of fracturing fluid into said conduit.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1999-10-01 2000-04-01 2000-10-01 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2003-10-01 2004-04-01 2004-10-01 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2007-10-01 2008-04-01 2008-10-01 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag