Patent US5848645A successfully refreshed from Google Patents.
← Back to Patent Explorer
US5848645A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for fracturing and gravel-packing a well

Assignee: Mobil Oil AS
•
Filing: 1996-09-05
•
Granted: 1998-12-15
•
Expires: 2016-09-05
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for gravel-packing an interval within a cased wellbore wherein perforations in the well casing are cleaned of any plugging materials before placement of the gravel (e.g. sand). A screen having alternate flowpaths thereon is lowered adjacent the perforated casing and a clear fluid (e.g. clear fracturing gel) is pumped through the perforations into the formation. The gel cleans the perforation of any plugging material and fractures the formation. A gravel (e.g. sand) slurry is then pumped into the annulus and through the perforations to deposit sand in the fracture, the perforations, and the annulus around the screen. If a sand bridge(s) forms in the annulus, the alternate flowpaths will deliver the slurry to all levels within the annulus insuring good distribution of sand across the interval.

Inventors

  • 👤 Lloyd G. Jones

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 20:51
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/02; E21B43/04; E21B43/25; E21B43/26; E21B43/267

Claims Analysis

Total Claims: 9
Claim 1
Independent Claim 247 words
A method for gravel-packing a completion interval of a subterranean formation which is traversed by a cased wellbore, said method comprising: forming perforations in said cased wellbore adjacent said completion interval; positioning a workstring in the wellbore to form a well annulus between said workstring and said wellbore, said workstring including a gravel pack screen which lies adjacent said completion interval to form a completion interval annulus when said workstring is in place within said wellbore, said workstring also including alternate flowpath formed by shunt tubes which are spaced radially around said gravel-pack screen and which extend through said completion interval, each of said shunt tubes having inlet and outlet openings spaced along its length; pumping a clear fluid having substantially no particulate material therein into one end of said completion interval annulus and out through said perforations into said formation to thereby force any plugging material from said perforations to clear same for flow; continuing pumping of said clear fluid into said one end of said interval annulus and through said perforations until all of said perforations are clear for flow; ceasing pumping of said clear fluid; pumping a slurry containing proppants into said one end of said completion interval annulus to deliver said proppants through said alternate flowpaths to levels within said fracture interval to thereby deposit proppants in said perforations and in said completion interval annulus; continuing pumping of said slurry until said perforations and said completion interval annulus are filled with said proppants.
Claim 2
Independent Claim 247 words
A method for gravel-packing a completion interval of a subterranean formation which is traversed by a cased wellbore, said method comprising: forming perforations in said cased wellbore adjacent said completion interval; positioning a workstring in the wellbore to form a well annulus between said workstring and said wellbore, said workstring including a gravel pack screen which lies adjacent said completion interval to form a completion interval annulus when said workstring is in place within said wellbore, said workstring also including alternate flowpath formed by shunt tubes which are spaced radially around said gravel-pack screen and which extend through said completion interval, each of said shunt tubes having inlet and outlet openings spaced along its length; pumping a clear fluid having substantially no particulate material therein into one end of said completion interval annulus and out through said perforations into said formation to thereby force any plugging material from said perforations to clear same for flow; continuing pumping of said clear fluid into said one end of said interval annulus and through said perforations until all of said perforations are clear for flow; ceasing pumping of said clear fluid; pumping a slurry containing proppants into said one end of said completion interval annulus to deliver said proppants through said alternate flowpaths to levels within said fracture interval to thereby deposit proppants in said perforations and in said completion interval annulus; continuing pumping of said slurry until said perforations and said completion interval annulus are filled with said proppants.
Claim 3
Dependent Claim 22 words
The method of claim 1 wherein said clear fluid is a clear fracturing gel and said proppants in said slurry are sand.
Claim 4
Dependent Claim 19 words
The method of claim 1 wherein said clear fluid is pumped at a higher flowrate than is said slurry.
Claim 5
Dependent Claim 39 words
The method of claim 1 wherein said clear fracturing fluid is pumped at a rate of greater than about 8 barrels per minute and said slurry is flowed at a rate of less than about 6 barrels per minute.
Claim 6
Dependent Claim 24 words
The method of claim 2 including: pumping said clear fracturing gel through said perforation into said formation to initiate and expand a fracture therein.
Claim 7
Dependent Claim 30 words
The method of claim 5 including: isolating said portion of said annulus which lies adjacent said completion interval prior to pumping said clear fracturing fluid into said completion interval annulus.
Claim 8
Dependent Claim 20 words
The method of claim 6 wherein said clear fracturing gel is pumped at a higher flowrate than is said slurry.
Claim 9
Dependent Claim 39 words
The method of claim 7 wherein said clear fracturing gel is pumped at a rate of greater than about 8 barrels per minute and said slurry is pumped at a rate of less than about 6 barrels per minute.

References Cited (Backward Citations)

US4945991A Cited
US5082052A Cited
US5113935A Cited
US5161613A Cited
US5161618A Cited
US5419394A Cited
US5417284A Cited
US5435391A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2001-12-14 2002-06-15 2002-12-15 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2005-12-14 2006-06-15 2006-12-15 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2009-12-14 2010-06-15 2010-12-15 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag